Chevron brace connection design to AISC 360 covers two joints. At each brace end, you check the bolts between the brace and the gusset plate for slip, bearing and tear-out, then block shear and tension rupture of both parts, and tension and buckling of the gusset on its Whitmore section. At the beam, you resolve the two brace forces at the gusset edge, then check the gusset-to-beam fillet welds, the gusset in shear and tension along that edge, and the beam web under the concentrated force.

This page works one real example from start to finish. Two WT7x41 braces at 60° meet at the underside of a W18x55 girder, and each carries 250 kip in tension or 250 kip in compression (LRFD). Each brace flange is bolted with ten 1 in A490-SC bolts to a 1/2 en qualité A572 50 gusset plate, which is welded to the girder flange with 3/16 in fillets on both sides. The design is to AISC 360-16, the AISC Manual 15th Edition and AISC Design Guide 29. Chaque équation est écrite avec ses chiffres, in the same order as the AISC calc sheet that the Conception de connexion SkyCiv module produces for this connection.

What is a chevron brace connection?

A chevron brace, also called an inverted V brace, is a pair of diagonal braces that rise from the lower corners of a frame bay and meet at the middle of the beam above. The connection at the top joins both braces to the beam through a single gusset plate. In this example each brace is a WT, with its flange bolted flat to the gusset and its stem standing out, and the gusset is shop welded to the bottom flange of the girder.

Under lateral load one brace pulls and the other pushes, so the gusset passes a large horizontal force into the beam. Both brace lines meet at a work point on the beam’s centreline, half the beam depth below the gusset edge, and that offset puts a moment on the gusset-to-beam weld even though the gusset is centred on the work point. You can check this example directly in the chevron brace connection calculator. The same brace-to-gusset checks appear in the vertical bracing connection calculator et la calculateur de connexion pour genouillère.

Chevron brace connection design example elevation: two WT7x41 braces at 60 degrees bolted to a 1/2 en qualité A572 50 gusset plate welded with 3/16 in E70XX fillets to the bottom flange of an A992 W18x55 girder, Tu = Cu = 250 kip in each brace

Élévation de l'exemple de connexion. The brace lines meet on the girder centreline, and the gusset weld runs 21 1/2 in each side of that point.

Brace connection detail: WT7x41 A992 braces with standard holes bolted through oversized holes in the gusset with ten 1 in A490-SC(B) bolts each, two lines at 5 1/2 in gage, 3 in spacing and 1 1/2 in end distances, 7 in from the last bolt to the girder

The brace connections. Each WT flange has two lines of five bolts at 3 in on a 5 1/2 in gage, avec 1 1/2 in end distances, and the last bolts sit 7 in from the girder.

Chevron brace connection design: the steps at a glance

  1. Check the detailing limits at the brace bolts: gage, espacement et distances aux bords.
  2. Check the slip resistance of the slip-critical bolts.
  3. Check bolt bearing and tear-out on the gusset plate.
  4. Check bolt bearing and tear-out on the brace.
  5. Check block shear of the gusset plate.
  6. Check block shear of the brace.
  7. Check the gusset plate in tension on its Whitmore section.
  8. Check the brace in tension rupture with shear lag.
  9. Check the gusset plate in compression buckling.
  10. Check the minimum fillet weld size at the girder.
  11. Resolve the brace forces at the gusset edge and check the gusset-to-girder weld.
  12. Check the gusset plate in shear yielding along the girder.
  13. Check the gusset plate in tension yielding along the girder.
  14. Check the girder web for local crippling and local yielding.

Entrées de conception pour cet exemple

Le code de conception est AISC 360-16 LRFD. Les propriétés de la section proviennent du manuel AISC. The two braces are identical and mirror each other about the work point, so Steps 1 à 9 are worked once and apply to both.

Article Symbole Valeur
Brace tension load (each brace) [mathin] T_{u,br} [mathin] 250 kip
Brace compression load (each brace) [mathin] C_{u,br} [mathin] 250 kip
Girder W18x55, A992
Girder depth / web thickness [mathin] d_{g},\ t_{w,g} [mathin] 18.1 in / 0.39 in
Girder flange width / thickness [mathin] b_{f,g},\ t_{f,g} [mathin] 7.53 in / 0.63 in
Girder area / kdes [mathin] A_{g},\ k_{des,g} [mathin] 16.2 in² / 1.03 in
Girder yield / contrainte de traction [mathin] F_{y,g},\ F_{u,g} [mathin] 50 KSI / 65 KSI
Croisillons WT7x41, A992
Brace area [mathin] A_{br} [mathin] 12 in²
Brace flange width / thickness [mathin] b_{f,br},\ t_{f,br} [mathin] 10.1 in / 0.855 in
Brace stem thickness / le centroïde [mathin] t_{w,br},\ \bar{y} [mathin] 0.51 in / 1.39 in
Brace slope from the girder [mathin] \theta_{br} [mathin] 60°
Brace unbraced length (gusset buckling length) [mathin] L_{b,br} [mathin] 7 in
Brace yield / contrainte de traction [mathin] F_{y,br},\ F_{u,br} [mathin] 50 KSI / 65 KSI
Module d'élasticité [mathin] E [mathin] 29000 KSI

 

Article Symbole Valeur
Plaque à gousset 1/2 in, A572 Grade 50
Gusset thickness [mathin] t_{gp} [mathin] 0.5 in
Gusset yield / contrainte de traction [mathin] F_{y,gp},\ F_{u,gp} [mathin] 50 KSI / 65 KSI
Boulons 1 in A490-SC, Class B surface
Diamètre du boulon [mathin] d_{b} [mathin] 1 in
Holes in brace / gusset Standard (MST) / surdimensionné (OVS)
Bolt gage across the stem [mathin] g_{a} [mathin] 5.5 in
Rangées de boulons / espacement des rangs [mathin] n_{r},\ s_{r} [mathin] 5 / 3 in
Bolt lines (Colonnes) [mathin] n_{c} [mathin] 2
End distance on brace and gusset [mathin] L_{ev} [mathin] 1.5 in
Weld at the girder 3/16 en filet, both sides of the gusset, E70XX
Taille de soudure / force de remplissage [mathin] W,\ F_{EXX} [mathin] 0.1875 in / 70 KSI
Weld length each side of the work point [mathin] L_{w1},\ L_{w2} [mathin] 21.5 in / 21.5 in
Total gusset length along the girder [mathin] L_{WT} [mathin] 43 in

Each brace has ten bolts: two lines of five, one line on each side of the stem. The brace length on the gusset adds up from the drawing: deux 1.5 in end distances plus four 3 in spaces, 15 in. The inputs page also lists a 3 in bolt column spacing for the left brace and none for the right. It only enters the block shear equations multiplied by [mathin] (n_{c} – 2) = 0 [mathin], so it has no effect.

Étape 1: Detailing limits at the brace bolts (AISC 360-16 J3.3, J3.4, J3.5)

The bolt layout has to be buildable and match the assumptions behind the strength equations. Les boulons trop serrés se déchirent entre les trous, les bords trop rapprochés se déchirent, and the gage across the stem has to leave room to fit and tighten the bolts on each side of it.

Pour un 1 in bolt the minimum spacing is [mathin] 2\tfrac{2}{3} d_{b} = 2.667\,in [mathin] (J3.3) and the minimum edge distance is 1.25 in (Tableau J3.4). The WT has standard holes, donc 1.25 in applies to it directly. The gusset has oversized holes, so the Table J3.5 increment of 1/8 in raises its minimum end distance to 1.375 in.

Limite de détail Limite (in) Réel (in) DCR Résultat
Minimum bolt gage 4.175 5.500 0.759 cdot K_a
Espacement minimum des rangées de boulons 2.667 3.000 0.889 cdot K_a
Espacement maximal des rangées de boulons 6.000 3.000 0.500 cdot K_a
Gusset plate minimum vertical edge distance 1.375 1.500 0.917 cdot K_a
Brace minimum vertical edge distance 1.250 1.500 0.833 cdot K_a
Brace minimum horizontal edge distance 1.250 2.313 0.540 cdot K_a

The horizontal edge distance on the WT flange is half of what is left after the gage. Using the flange width as a fraction, 10 1/8 in, C'est (10.125 - 5.5)/2 = 2.3125 in. Pour une limite minimale, le rapport est la limite sur la valeur réelle, et pour un maximum, c'est un dépassement réel de la limite. The governing row is the gusset end distance with its oversized hole increment:

[math] DCR = \frac{d}{c} = \frac{(1.375)}{(1.5)} = 0.91667 [math]

DCR = 0.917 < 1.0, d'accord

Étape 2: Slip resistance of the bolts (AISC 360-16 J3.8)

The gusset has oversized holes, et AISC 360-16 J3.2 allows oversized holes only in slip-critical joints. So the bolts are pretensioned and the brace force is carried by friction between the WT flange and the gusset. The check is that the joint does not slip under the factored load.

Où [mathin] \phi = 0.85 [mathin] for oversized holes, [mathin] \mu = 0.5 [mathin] for a Class B surface, [mathin] D_{u} = 1.13 [mathin], [mathin] h_{f} = 1 [mathin] parce qu'il n'y a pas de remplissage, [mathin] T_{b} = 64\,kip [mathin] pour un 1 in A490 bolt (Table J3.1), [mathin] N_{s} = 1 [mathin] slip plane, [mathin] n_{r} = 5 [mathin] et [mathin] n_{c} = 2 [mathin]:

[math] \phi R_{n} = \phi\, \mu\, D_{u}\, h_{f}\, T_{b}\, N_{s}\, n_{r}\, n_{c} [math]

[math] \phi R_{n} = (0.85) \times (0.5) \times (1.13) \times (1) \times (64\,kip) \times (1) \times (5) \times (2) [math]

[math] \phi R_{n} = 307.36\,kip [math]

DCR = 250 kip / 307.36 kip = 0.813 < 1.0, d'accord

The same check covers tension and compression, because the brace force is 250 kip either way.

Étape 3: Bolt bearing and tear-out on the gusset plate (AISC 360-16 J3.10)

Slip-critical bolts still have to be checked for bearing, because if the joint does slip the bolts end up bearing on the sides of their holes. In tension the brace pulls the bolts away from the girder, so they bear on the gusset toward its outer edge. The bolt nearest that edge has the least material in front of it.

The gusset hole is oversized, [mathin] d_{h} = 1.25\,in [mathin]. Clear distance for the end bolt, avec [mathin] L_{ev} = 1.5\,in [mathin]:

[math] l_{c1} = L_{ev} – \frac{d_{h}}{2} = (1.5\,in) – \frac{(1.25\,in)}{2} = 0.875\,in [math]

Clear distance between bolts, avec [mathin] s_{r} = 3\,in [mathin]:

[math] l_{c2} = s_{r} – d_{h} = (3\,in) – (1.25\,in) = 1.75\,in [math]

Où [mathin] t_{gp} = 0.5\,in [mathin], [mathin] F_{u,gp} = 65\,ksi [mathin], [mathin] n_{r} = 5 [mathin], [mathin] n_{c} = 2 [mathin], [mathin] d_{b} = 1\,in [mathin] et [mathin] \phi = 0.75 [mathin]:

[math] \phi R_{n,tearout} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t_{gp} F_{u,gp}\, n_{c} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{gp} F_{u,gp}\, n_{c} \left( n_{r} – 1 \right) \right] [math]

[math] \phi R_{n,tearout} = (0.75) \times \left[ \min\left(1.2 \times (0.875\,in),\, 2.4 \times (1\,in)\right) \times (0.5\,in) \times (65\,ksi) \times (2) + \min\left(1.2 \times (1.75\,in),\, 2.4 \times (1\,in)\right) \times (0.5\,in) \times (65\,ksi) \times (2) \times ((5) – 1) \right] [math]

[math] \phi R_{n,tearout} = 460.69\,kip [math]

DCR = 250 kip / 460.69 kip = 0.543 < 1.0, d'accord

Tear-out governs every bolt, because the oversized hole eats into the clear distance: 1.2 lc is below 2.4 db for both the end bolts and the inner bolts. In compression the bolts bear toward the girder instead, where there is more gusset, so tension is the case that matters.

Étape 4: Bolt bearing and tear-out on the brace (AISC 360-16 J3.10)

The same check applies to the WT flange. In tension the brace is pulled away from the girder, so its bolts bear toward the end of the WT nearest the girder.

The WT has standard holes, [mathin] d_{h} = 1.125\,in [mathin]:

[math] l_{c1} = L_{ev} – \frac{d_{h}}{2} = (1.5\,in) – \frac{(1.125\,in)}{2} = 0.9375\,in [math]

[math] l_{c2} = s_{r} – d_{h} = (3\,in) – (1.125\,in) = 1.875\,in [math]

Où [mathin] t_{f,br} = 0.855\,in [mathin] et [mathin] F_{u,br} = 65\,ksi [mathin]:

[math] \phi R_{n,tearout} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t_{f,br} F_{u,br}\, n_{c} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{f,br} F_{u,br}\, n_{c} \left( n_{r} – 1 \right) \right] [math]

[math] \phi R_{n,tearout} = (0.75) \times \left[ \min\left(1.2 \times (0.9375\,in),\, 2.4 \times (1\,in)\right) \times (0.855\,in) \times (65\,ksi) \times (2) + \min\left(1.2 \times (1.875\,in),\, 2.4 \times (1\,in)\right) \times (0.855\,in) \times (65\,ksi) \times (2) \times ((5) – 1) \right] [math]

[math] \phi R_{n,tearout} = 844.05\,kip [math]

DCR = 250 kip / 844.05 kip = 0.296 < 1.0, d'accord

Ce logiciel 0.855 in WT flange is 1.7 times as thick as the gusset, and the smaller standard hole leaves more clear distance, so the brace has nearly twice the bearing strength of the gusset.

Étape 5: Block shear of the gusset plate (AISC 360-16 J4.3)

A block of the gusset can tear out around the bolts: shear along the bolt lines to the gusset’s edge, plus tension across the bolt group. With two bolt lines there are two shapes to check. The L pattern shears along one bolt line and tears across both lines to the gusset’s side edge. The U pattern shears along both bolt lines and tears across between them. The weaker of the two governs.

L pattern

Net area in tension, across the 5.5 in gage plus the gusset edge distance beyond the far bolt line, [mathin] L_{eh,gp} = 2.3\,in [mathin]. That edge distance is the same as the WT’s own edge distance, (10.1 - 5.5)/2. The tension path crosses one full hole and one half hole, and each hole adds 1/16 en cas de dommages lors du poinçonnage (B4.3):

[math] A_{nt} = t_{gp} \left[ (n_{c}-2)\, s_{c} + g_{a} + L_{eh,gp} – (n_{c} – 0.5) \left( d_{h} + 0.0625\,in \right) \right] [math]

[math] A_{nt} = (0.5\,in) \times \left[ ((2)-2) \times (3\,in) + (5.5\,in) + (2.3\,in) – ((2) – 0.5) \times ((1.25\,in) + (0.0625\,in)) \right] = 2.9156\,in^{2} [math]

Gross area in shear, along one bolt line from the gusset’s edge to the farthest bolt:

[math] A_{gv} = t_{gp} \left[ L_{ev} + (n_{r}-1)\, s_{r} \right] = (0.5\,in) \times \left[ (1.5\,in) + ((5)-1) \times (3\,in) \right] = 6.75\,in^{2} [math]

Net area in shear. The report writes the shear length as the 15 in brace length on the gusset, [mathin] L_{br,gp} [mathin], less one end distance, which is the same 13.5 in as in the gross area:

[math] A_{nv} = t_{gp} \left[ L_{br,gp} – L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] [math]

[math] A_{nv} = (0.5\,in) \times \left[ (15\,in) – (1.5\,in) – ((5) – 0.5) \times ((1.25\,in) + (0.0625\,in)) \right] = 3.7969\,in^{2} [math]

Résistance au cisaillement des blocs, avec [mathin] U_{bs} = 1 [mathin] because the tension stress is uniform, [mathin] F_{u,gp} = 65\,ksi [mathin], [mathin] F_{y,gp} = 50\,ksi [mathin] et [mathin] \phi = 0.75 [mathin]:

[math] \phi R_{n} = \phi \left( 0.6\, F_{u,gp} A_{nv} + U_{bs} F_{u,gp} A_{nt} \le 0.6\, F_{y,gp} A_{gv} + U_{bs} F_{u,gp} A_{nt} \right) [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (3.7969\,in^{2}) + (1) \times (65\,ksi) \times (2.9156\,in^{2}) \le 0.6 \times (50\,ksi) \times (6.75\,in^{2}) + (1) \times (65\,ksi) \times (2.9156\,in^{2}) \right) [math]

[math] \phi R_{n} = 253.2\,kip [math]

U pattern

Net area in tension, between the two bolt lines only, which crosses one hole in total (a half hole at each line):

[math] A_{nt} = t_{gp} \left[ (n_{c}-2)\, s_{c} + g_{a} – (n_{c} – 1) \left( d_{h} + 0.0625\,in \right) \right] [math]

[math] A_{nt} = (0.5\,in) \times \left[ ((2)-2) \times (3\,in) + (5.5\,in) – ((2) – 1) \times ((1.25\,in) + (0.0625\,in)) \right] = 2.0937\,in^{2} [math]

Gross and net areas in shear, now along both bolt lines:

[math] A_{gv} = 2\, t_{gp} \left[ L_{ev} + (n_{r}-1)\, s_{r} \right] = 2 \times (0.5\,in) \times \left[ (1.5\,in) + ((5)-1) \times (3\,in) \right] = 13.5\,in^{2} [math]

[math] A_{nv} = 2\, t_{gp} \left[ (n_{r}-1)\, s_{r} + L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] [math]

[math] A_{nv} = 2 \times (0.5\,in) \times \left[ ((5)-1) \times (3\,in) + (1.5\,in) – ((5) – 0.5) \times ((1.25\,in) + (0.0625\,in)) \right] = 7.5937\,in^{2} [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (7.5937\,in^{2}) + (1) \times (65\,ksi) \times (2.0937\,in^{2}) \le 0.6 \times (50\,ksi) \times (13.5\,in^{2}) + (1) \times (65\,ksi) \times (2.0937\,in^{2}) \right) [math]

[math] \phi R_{n} = 324.19\,kip [math]

Governing block shear

[math] \phi R_{n} = \min\left( \phi R_{n},\, \phi R_{n} \right) = \min\left( (253.2\,kip),\, (324.19\,kip) \right) = 253.2\,kip [math]

DCR = 250 kip / 253.2 kip = 0.987 < 1.0, d'accord

This is the closest check on the brace side. The L pattern governs because it has only one shear plane, and net shear rupture governs within it: l' 1 1/4 in oversized holes take 5.9 in out of the 13.5 in shear length.

Étape 6: Block shear of the brace (AISC 360-16 J4.3)

The WT flange can tear out too. Here the blocks are on the outside: each bolt line shears along its length to the end of the WT, and tears across to the flange tip beside it. Two L-shaped blocks fail together, one each side of the stem.

Net area in tension, from each bolt line out to the flange tip, with the flange width less the gage and one hole in total, [mathin] d_{h} = 1.125\,in [mathin]:

[math] A_{nt} = t_{f,br} \left[ b_{f,br} – g_{a} – (n_{c} – 1) \left( d_{h} + 0.0625\,in \right) \right] [math]

[math] A_{nt} = (0.855\,in) \times \left[ (10.1\,in) – (5.5\,in) – ((2) – 1) \times ((1.125\,in) + (0.0625\,in)) \right] = 2.9177\,in^{2} [math]

[math] A_{gv} = 2\, t_{f,br} \left[ L_{ev} + (n_{r}-1)\, s_{r} \right] = 2 \times (0.855\,in) \times \left[ (1.5\,in) + ((5)-1) \times (3\,in) \right] = 23.085\,in^{2} [math]

[math] A_{nv} = 2\, t_{f,br} \left( L_{ev} + (n_{r}-1)\, s_{r} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right) [math]

[math] A_{nv} = 2 \times (0.855\,in) \times \left( (1.5\,in) + ((5)-1) \times (3\,in) – ((5) – 0.5) \times ((1.125\,in) + (0.0625\,in)) \right) = 13.947\,in^{2} [math]

Avec [mathin] F_{u,br} = 65\,ksi [mathin], [mathin] F_{y,br} = 50\,ksi [mathin], [mathin] U_{bs} = 1 [mathin] et [mathin] \phi = 0.75 [mathin]:

[math] \phi R_{n} = \phi \left( 0.6\, F_{u,br} A_{nv} + U_{bs} F_{u,br} A_{nt} \le 0.6\, F_{y,br} A_{gv} + U_{bs} F_{u,br} A_{nt} \right) [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (13.947\,in^{2}) + (1) \times (65\,ksi) \times (2.9177\,in^{2}) \le 0.6 \times (50\,ksi) \times (23.085\,in^{2}) + (1) \times (65\,ksi) \times (2.9177\,in^{2}) \right) [math]

[math] \phi R_{n} = 550.19\,kip [math]

DCR = 250 kip / 550.19 kip = 0.454 < 1.0, d'accord

Étape 7: Gusset plate in tension on the Whitmore section (AISC 360-16 J4.1)

The brace force enters the gusset through the bolts and spreads out as it travels along the plate. The Whitmore section is the effective width that takes that force at the last bolt row: lines drawn at 30° from the outer bolts of the first row, measured across the last row (Partie du manuel AISC 9, Fig. 9-1). The gusset must not yield on that width, and it must not rupture on that width less the holes.

Largeur Whitmore

The bolt group is [mathin] L_{br} = (n_{r}-1)\, s_{r} = 12\,in [mathin] longue, and its two lines are [mathin] W_{br} = g_{a} = 5.5\,in [mathin] apart. In the report, [mathin] W [mathin] in this step is the Whitmore width, not the weld size:

[math] W = 2\, L_{br} \tan(\theta) + W_{br} = 2 \times (12\,in) \times \tan((30)) + (5.5\,in) = 19.356\,in [math]

The gusset here is large enough to take the full 30° spread on both sides, so no part of the Whitmore width runs off the plate.

Tension yielding (Eq. J4-1)

Avec [mathin] \phi = 0.9 [mathin], [mathin] F_{y,gp} = 50\,ksi [mathin] et [mathin] t_{gp} = 0.5\,in [mathin]:

[math] \phi R_{n,ty} = \phi\, F_{y,gp}\, t_{gp}\, W = (0.9) \times (50\,ksi) \times (0.5\,in) \times (19.356\,in) = 435.52\,kip [math]

Tension rupture (Eq. J4-2)

The net width removes the two oversized holes in the last row, [mathin] d_{h} = 1.25\,in [mathin], avec [mathin] \phi = 0.75 [mathin] et [mathin] F_{u,gp} = 65\,ksi [mathin]:

[math] \phi R_{n,tr} = \phi\, F_{u,gp}\, t_{gp} \left[ W – n_{c}\left( d_{h} + 0.0625\,in \right) \right] [math]

[math] \phi R_{n,tr} = (0.75) \times (65\,ksi) \times (0.5\,in) \times \left[ (19.356\,in) – (2) \times ((1.25\,in) + (0.0625\,in)) \right] = 407.83\,kip [math]

[math] \phi R_{n} = \min\left( \phi R_{n,ty},\, \phi R_{n,tr} \right) = \min\left( (435.52\,kip),\, (407.83\,kip) \right) = 407.83\,kip [math]

DCR = 250 kip / 407.83 kip = 0.613 < 1.0, d'accord

Étape 8: Brace in tension rupture with shear lag (AISC 360-16 D3, J4.1)

Only the flange of the WT is bolted, so the force in the stem has to flow into the flange near the connection. That uneven stress is shear lag, and AISC handles it with the factor U, which reduces the net area.

From Table D3.1, Cas 2, with the WT’s centroid [mathin] \bar{y} = 1.39\,in [mathin] measured from the bolted face of the flange and the connection length [mathin] (n_{r} – 1)\, s_{r} = 12\,in [mathin]:

[math] U = 1 – \frac{\bar{y}}{(n_{r} – 1)\, s_{r}} = 1 – \frac{(1.39\,in)}{((5) – 1) \times (3\,in)} = 0.88421 [math]

The net area removes the two holes in one row from the flange. Où [mathin] A_{br} = 12\,in^{2} [mathin], [mathin] d_{h} = 1.125\,in [mathin], [mathin] t_{f,br} = 0.855\,in [mathin], [mathin] F_{u,br} = 65\,ksi [mathin] et [mathin] \phi = 0.75 [mathin]:

[math] \phi R_{n,tr} = \phi\, F_{u,br}\, U \left[ A_{br} – n_{c}\left( d_{h} + 0.0625\,in \right) t_{f,br} \right] [math]

[math] \phi R_{n,tr} = (0.75) \times (65\,ksi) \times (0.88421) \times \left[ (12\,in^{2}) – (2) \times ((1.125\,in) + (0.0625\,in)) \times (0.855\,in) \right] = 429.73\,kip [math]

DCR = 250 kip / 429.73 kip = 0.582 < 1.0, d'accord

The long bolt group keeps U high. Gross yielding of the brace is part of the member design, so it is not repeated here.

Étape 9: Gusset plate in compression buckling (AISC 360-16 J4.4, E3)

When a brace is in compression it pushes the gusset toward the girder. The strip of gusset between the last bolt row and the girder flange can buckle out of plane, so it is checked as a column with the Whitmore width as its cross section.

The buckling length is the 7 in shown on the drawing, from the bolt row nearest the girder to the girder flange, measured along the brace. The report labels it the brace unbraced length, [mathin] L_{b,br} = 7\,in [mathin]. The gusset is welded to the girder on one edge only and its free end can sway out of plane with the braces, so the report takes [mathin] K = 1.2 [mathin]. For a solid rectangle, [mathin] r = t_{gp}/\sqrt{12} = 0.14434\,in [mathin]:

[math] \frac{KL}{r} = \frac{(1.2) \times (7\,in)}{(0.5\,in)/\sqrt{12}} = 58.197 [math]

Puisque [mathin] KL/r \gt 25 [mathin], J4.4 sends the check to Chapter E. Elastic buckling stress:

[math] F_{e} = \frac{\pi^{2} E}{\left( \frac{KL}{r} \right)^{2}} = \frac{\pi^{2} \times (29000\,ksi)}{((58.197))^{2}} = 84.508\,ksi [math]

[math] 4.71 \sqrt{\frac{E}{F_{y}}} = 113.43 [math]

Puisque [mathin] KL/r \le 4.71\sqrt{E/F_{y}} [mathin], the inelastic equation E3-2 applies:

[math] F_{cr} = \left( 0.658^{\frac{F_{y,gp}}{F_{e}}} \right) F_{y,gp} = \left( 0.658^{\frac{(50\,ksi)}{(84.508\,ksi)}} \right) \times (50\,ksi) = 39.032\,ksi [math]

Avec [mathin] \phi = 0.9 [mathin] and the Whitmore width [mathin] W = 19.356\,in [mathin]:

[math] \phi R_{n} = \phi\, F_{cr}\, t_{gp}\, W = (0.9) \times (39.032\,ksi) \times (0.5\,in) \times (19.356\,in) = 339.98\,kip [math]

DCR = 250 kip / 339.98 kip = 0.735 < 1.0, d'accord

Slenderness costs about 22% of the yield stress here. Moving the bolts closer to the girder shortens L, and a thicker gusset raises r directly.

Étape 10: Minimum fillet weld size at the girder (AISC 360-16 J2.2b)

A fillet weld that is too small for the parts it joins can crack as it cools, because the thicker part draws heat out of it too fast. Table J2.4 sets the minimum by the thinner part joined. Here that is the 1/2 in gusset, which falls in the over 1/4 dans 1/2 in band, so the minimum is 3/16 in.

Limite de détail Limite (in) Réel (in) DCR Résultat
Minimum fillet weld size 0.188 0.188 1.000 cdot K_a

[math] DCR = \frac{d}{c} = \frac{(0.188)}{(0.188)} = 1 [math]

DCR = 1.000, d'accord

A ratio of 1.000 here only says the 3/16 in weld is exactly the smallest size allowed. Whether it is strong enough is the next step.

Étape 11: Gusset-to-girder weld (AISC 360-16 J2.4, Guide de conception AISC 29)

The gusset is welded to the girder flange with a 3/16 in fillet on each side. The two brace forces reach the gusset edge as a normal force, a shear along the girder and a moment, and the weld carries all three together. This step resolves the brace forces at the gusset edge, finds the worst load on the weld, and checks the weld against it.

Limite de métal de base sur la taille de la soudure (Éq. manuel AISC. 9-2)

The gusset has a weld on both faces, so half its thickness backs each weld. Avec [mathin] t_{f,g} = 0.63\,in [mathin], [mathin] F_{u,g} = 65\,ksi [mathin], [mathin] t_{gp} = 0.5\,in [mathin] et [mathin] F_{u,gp} = 65\,ksi [mathin]:

[math] D_{max} = \frac{t_{f,g} F_{u,g} \le \frac{t_{gp}}{2} F_{u,gp}}{3.09\,kip/in \times F_{EXX}/F_{E70XX}} = \frac{(0.63\,in) \times (65\,ksi) \le (0.25\,in) \times (65\,ksi)}{(3.09\,kip/in) \times (1)} = 5.2589 [math]

C'est 5.2589 sixteenths, autour 0.329 in, so the full 3/16 in weld counts.

Effective weld length

The gusset runs [mathin] L_{WT} = 43\,in [mathin] along the girder. Each of the two weld lines is reduced by 2W for the ends:

[math] L_{w} = 2 \left[ L_{WT} – 2W \right] = 2 \times \left[ (43\,in) – 2 \times (0.1875\,in) \right] = 85.25\,in [math]

Forces at the gusset edge

Each brace force splits into a component perpendicular to the girder, [mathin] P \sin\theta [mathin], and one along it, [mathin] P \cos\theta [mathin]. The report takes the normal force as the largest that any one brace delivers, traction ou compression:

[math] N_{br} = \max\left[ T_{u,l,br} \sin(\theta_{l,br}),\, C_{u,l,br} \sin(\theta_{l,br}),\, T_{u,r,br} \sin(\theta_{r,br}),\, C_{u,r,br} \sin(\theta_{r,br}) \right] = (250\,kip) \times \sin((60)) = 216.51\,kip [math]

The shear along the girder is the sum of the two horizontal components with one brace in tension and the other in compression, which is the usual lateral load case for a chevron. Both components then point the same way:

[math] V_{br} = \max\left[ T_{u,l,br} \cos(\theta_{l,br}) + C_{u,r,br} \cos(\theta_{r,br}),\, C_{u,l,br} \cos(\theta_{l,br}) + T_{u,r,br} \cos(\theta_{r,br}) \right] [math]

[math] V_{br} = (250\,kip) \times \cos((60)) + (250\,kip) \times \cos((60)) = 250\,kip [math]

In that tension and compression case the two vertical components cancel. Pairing the 250 kip shear with a full 216.51 kip normal force from one brace is an envelope that covers unequal brace forces as well.

The moment has two parts, following AISC Design Guide 29, Exemple 5.9. The first is the normal force times its offset from the middle of the weld, which is zero here because the gusset runs 21.5 in each side of the work point. The second comes from the shear. The horizontal brace forces meet at the work point on the girder centreline, [mathin] d_{g}/2 = 9.05\,in [mathin] below the gusset edge, so moving them up to the edge adds [mathin] V_{br}\, d_{g}/2 [mathin]:

[math] M_{br} = \frac{N_{br} \left| L_{w1} – L_{w2} \right|}{2} + \frac{V_{br}\, d_{g}}{2} = \frac{(216.51\,kip) \times |(21.5\,in) – (21.5\,in)|}{2} + \frac{(250\,kip) \times (18.1\,in)}{2} = 188.54\,kip{\cdot}ft [math]

C'est 2262.5 poulet dans. The moment adds to the normal force at one end of the weld and subtracts at the other. The report turns the moment into an equivalent normal force using the plastic section modulus of the two weld lines, [mathin] L_{w}^{2}/8 [mathin], which gives the peak normal load:

[math] N_{br,T} = \frac{8\, M_{br}}{L_{w}} + N_{br} = \frac{8 \times (188.54\,kip{\cdot}ft)}{(85.25\,in)} + (216.51\,kip) = 428.82\,kip [math]

The moment is converted to kip-in (× 12) inside that fraction. The resultant at the peak and its angle to the weld axis:

[math] R = \sqrt{\left( N_{br,T} \right)^{2} + \left( V_{br} \right)^{2}} = \sqrt{((428.82\,kip))^{2} + ((250\,kip))^{2}} = 496.38\,kip [math]

[math] \theta = \tan^{-1}\left| \frac{N_{br,T}}{V_{br}} \right| = \tan^{-1}\left| \frac{(428.82\,kip)}{(250\,kip)} \right| = 59.758 [math]

Weld ductility factor

The load on the weld is not even. It peaks at one end and falls almost to nothing at the other. Fillet welds have limited ductility, so AISC Design Guide 29 and AISC Manual Part 13 design a gusset edge weld for the larger of the peak load and 1.25 times the average of the peak and minimum loads. Ce logiciel 1.25 lets the weld redistribute load before it fractures.

At the low-stress end the bending subtracts from the normal force:

[math] N_{br,min} = \left| N_{br} – \frac{8\, M_{br}}{L_{w}} \right| = \left| (216.51\,kip) – \frac{8 \times (188.54\,kip{\cdot}ft)}{(85.25\,in)} \right| = 4.1896\,kip [math]

[math] R_{min} = \sqrt{\left( N_{br,min} \right)^{2} + \left( V_{br} \right)^{2}} = \sqrt{((4.1896\,kip))^{2} + ((250\,kip))^{2}} = 250.04\,kip [math]

[math] R_{w} = \max\left( R,\, 1.25\, \frac{R + R_{min}}{2} \right) = \max\left( (496.38\,kip),\, 1.25 \times \frac{(496.38\,kip) + (250.04\,kip)}{2} \right) = 496.38\,kip [math]

The averaged value is 466.51 kip, so the peak governs.

Force de soudure (Eq. J2-4)

The resultant is at 59.758° to the weld, so the directional factor [mathin] 1 + 0.5 \sin^{1.5}\theta [mathin] adds about 40% to the strength. Avec [mathin] \phi = 0.75 [mathin] et [mathin] F_{EXX} = 70\,ksi [mathin]:

[math] \phi R_{n} = \phi\, 0.6\, F_{EXX} \frac{\sqrt{2}}{2} \left( W \le \frac{D_{max}}{16} \right) \left[ 1 + 0.5 \left( \sin\theta \right)^{1.5} \right] L_{w} [math]

[math] \phi R_{n} = (0.75) \times 0.6 \times (70\,ksi) \times \frac{\sqrt{2}}{2} \times \left( (0.1875\,in) \le \frac{(5.2589)}{(16)} \right) \times \left[ 1 + 0.5 \times (\sin(59.758))^{1.5} \right] \times (85.25\,in) [math]

[math] \phi R_{n} = 498.98\,kip [math]

DCR = 496.38 kip / 498.98 kip = 0.995 < 1.0, d'accord

This is the governing check of the whole connection. Almost half of the peak normal load, 212.31 kip, comes from the moment, and that moment exists only because the work point is 9.05 in below the weld. The base metal would allow a weld up to about 5/16 in, so a 1/4 in fillet is the simplest way to gain margin.

Étape 12: Gusset plate in shear yielding along the girder (AISC 360-16 J4.2)

The horizontal force, [mathin] V_{br} = 250\,kip [mathin], passes through the gusset’s welded edge as shear. The gross section along that edge must not yield.

Avec [mathin] L_{WT} = 43\,in [mathin], [mathin] t_{gp} = 0.5\,in [mathin], [mathin] F_{y,gp} = 50\,ksi [mathin] et [mathin] \phi = 1 [mathin]:

[math] A_{gv} = L_{WT}\, t_{gp} = (43\,in) \times (0.5\,in) = 21.5\,in^{2} [math]

[math] \phi R_{n,sy} = \phi\, 0.6\, F_{y,gp} A_{gv} = (1) \times 0.6 \times (50\,ksi) \times (21.5\,in^{2}) = 645\,kip [math]

DCR = 250 kip / 645 kip = 0.388 < 1.0, d'accord

Étape 13: Gusset plate in tension yielding along the girder (AISC 360-16 J4.1)

The normal force and the moment put the gusset’s welded edge in tension, highest at one end. Following AISC Design Guide 29, Exemple 5.3, the report adds the two as normal stresses on the edge and turns the peak back into an equivalent force over the full edge.

The normal stress is [mathin] N/(t\,l) + M/(t\,l^{2}/4) [mathin]. Multiplying by [mathin] t\,l [mathin], avec [mathin] l = L_{WT} = 43\,in [mathin]:

[math] N_{e} = \left| N_{br} \right| + \frac{4 \left| M_{br} \right|}{L_{WT}} = |(216.51\,kip)| + \frac{4 \times |(188.54\,kip{\cdot}ft)|}{(43\,in)} = 426.97\,kip [math]

This is slightly below the weld’s 428.82 kip because it uses the 43 in gusset edge rather than the 85.25 in of effective weld split over two lines. Avec [mathin] \phi = 0.9 [mathin]:

[math] \phi R_{n,ty} = \phi\, F_{y,gp}\, t_{gp}\, L_{WT} = (0.9) \times (50\,ksi) \times (0.5\,in) \times (43\,in) = 967.5\,kip [math]

DCR = 426.97 kip / 967.5 kip = 0.441 < 1.0, d'accord

Étape 14: Girder web local crippling and local yielding (AISC 360-16 J10.3, J10.2)

The gusset delivers a concentrated force to the girder flange over its 43 in length. When the braces push up on the girder, the girder web above the gusset can yield locally or crumple (cripple). The demand is the peak normal load from Step 11, [mathin] N_{br,T} = 428.82\,kip [mathin].

Web local crippling (Eq. J10-4)

Avec [mathin] \phi = 0.75 [mathin], [mathin] t_{w,g} = 0.39\,in [mathin], bearing length [mathin] L_{WT} = 43\,in [mathin], [mathin] d_{g} = 18.1\,in [mathin], [mathin] t_{f,g} = 0.63\,in [mathin], [mathin] F_{y,g} = 50\,ksi [mathin] et [mathin] Q_{f} = 1 [mathin]:

[math] \phi R_{n,wlc} = \phi\, 0.8 \left( t_{w,g} \right)^{2} \left[ 1 + 3 \left( \frac{L_{WT}}{d_{g}} \right) \left( \frac{t_{w,g}}{t_{f,g}} \right)^{1.5} \right] \sqrt{\frac{E\, F_{y,g}\, t_{f,g}}{t_{w,g}}}\, Q_{f} [math]

[math] \phi R_{n,wlc} = (0.75) \times 0.8 \times ((0.39\,in))^{2} \times \left[ 1 + 3 \times \left( \frac{(43\,in)}{(18.1\,in)} \right) \times \left( \frac{(0.39\,in)}{(0.63\,in)} \right)^{1.5} \right] \times \sqrt{\frac{(29000\,ksi) \times (50\,ksi) \times (0.63\,in)}{(0.39\,in)}} \times (1) [math]

[math] \phi R_{n,wlc} = 624.51\,kip [math]

Web local yielding (Eq. J10-2)

The force spreads through the flange and fillet on a 2.5:1 slope on each side, so the web yields over [mathin] 5k + l_{b} [mathin]. Avec [mathin] \phi = 1 [mathin] et [mathin] k_{des,g} = 1.03\,in [mathin]:

[math] \phi R_{n,wly} = \phi\, F_{y,g}\, t_{w,g} \left( 5\, k_{des,g} + L_{WT} \right) = (1) \times (50\,ksi) \times (0.39\,in) \times \left( 5 \times (1.03\,in) + (43\,in) \right) = 938.92\,kip [math]

[math] \phi R_{n} = \min\left( \phi R_{n,wlc},\, \phi R_{n,wly} \right) = \min\left( (624.51\,kip),\, (938.92\,kip) \right) = 624.51\,kip [math]

DCR = 428.82 kip / 624.51 kip = 0.687 < 1.0, d'accord

The W18x55 has a thin 0.39 in web, so crippling governs by a wide margin. Ce logiciel 43 in gusset spreads the force well enough that no stiffener is needed.

Summary of checks

The brace-side checks are the same for the left and right braces.

Vérification de la conception Demande Capacité DCR Résultat
Detailing limits at the brace bolts 1.375 in 1.500 in 0.917 cdot K_a
Bolts in shear (slip-critical) 250.000 kip 307.360 kip 0.813 cdot K_a
Bolt bearing on the gusset plate 250.000 kip 460.688 kip 0.543 cdot K_a
Bolt bearing on the brace 250.000 kip 844.045 kip 0.296 cdot K_a
Block shear of the gusset plate 250.000 kip 253.195 kip 0.987 cdot K_a
Block shear of the brace 250.000 kip 550.193 kip 0.454 cdot K_a
Gusset plate in tension 250.000 kip 407.828 kip 0.613 cdot K_a
Brace in tension rupture 250.000 kip 429.734 kip 0.582 cdot K_a
Gusset plate in compression 250.000 kip 339.984 kip 0.735 cdot K_a
Minimum fillet weld size 0.188 in 0.188 in 1.000 cdot K_a
Weld at gusset to girder 496.376 kip 498.977 kip 0.995 cdot K_a
Gusset shear yielding along the girder 250.000 kip 645.000 kip 0.388 cdot K_a
Gusset tension yielding along the girder 426.971 kip 967.500 kip 0.441 cdot K_a
Girder web (local crippling governs) 428.823 kip 624.511 kip 0.687 cdot K_a

The connection passes every check of this chevron brace connection design. The gusset-to-girder weld governs at 0.995, driven by the moment from the work point sitting half the girder depth below the weld. On the brace side, block shear of the gusset is next at 0.987, from the L pattern through the oversized holes. The minimum weld size shows 1.000 only because the weld is exactly the Table J2.4 minimum.

Que changer si une vérification échoue

  • Weld at the girder: use a larger fillet (the base metal allows up to about 5/16 in here) or make the gusset longer. A longer gusset adds weld length and reduces the 8M/Lw term at the same time.
  • Block shear of the gusset: ajouter une rangée de boulons, which lengthens the shear planes, or increase the edge distance from the outer bolt line to the gusset edge. Standard holes instead of oversized holes in the gusset add net area.
  • Slip resistance: add bolts, use a larger bolt, or use standard holes in the gusset, which raises φ from 0.85 à 1.00.
  • Bearing and tear-out: increase the end distance or the bolt spacing, or use a thicker gusset.
  • Brace tension rupture: lengthen the bolt group to raise U, or use a heavier WT.
  • Gusset tension or compression: a thicker gusset raises both. A longer bolt group widens the Whitmore section, and moving the bolts closer to the girder shortens the buckling length.
  • Girder web: lengthen the gusset to spread the force, or add a pair of web stiffeners at the work point.

Questions fréquentes

What is a chevron brace?

A chevron brace is a pair of diagonal braces that meet at the middle of a beam, forming an inverted V (or a V when they meet at the beam below). Under lateral load one brace is in tension and the other in compression, and their horizontal components add up at the beam. Because each brace can reverse, this example designs both braces for 250 kip in tension and 250 kip in compression.

Why is there a moment on the gusset weld when the gusset is centred?

The brace lines meet at a work point on the girder centreline, 9.05 in below the gusset edge. The horizontal brace forces act at that point, and moving them up to the weld adds a moment equal to the horizontal force times half the girder depth: 250 kip × 9.05 dans = 2262.5 poulet dans, ou 188.54 kip-ft. Centring the gusset on the work point removes the moment from the normal force, but not this one.

Why is the normal force 216.51 kip and not the sum of both braces?

Avec une orthèse en tension et l'autre en compression, the vertical components are equal and opposite, so they cancel at the work point. The report takes the largest vertical component that one brace can deliver, 250 kip × sin 60° = 216.51 kip, and pairs it with the full horizontal force from both braces. That envelope covers cases where the brace forces are not equal. If both braces could be in compression at once, their vertical components would add, so that case needs its own check.

Why are the bolts slip-critical?

The gusset has oversized holes, which give the erector tolerance to fit the braces. AISC 360-16 J3.2 allows oversized holes only in slip-critical connections, so the bolts are pretensioned and the faying surfaces are prepared to Class B. A brace that reverses between tension and compression also benefits from a joint that does not slip back and forth. Slip-critical bolts are still checked for bearing and tear-out, as in Steps 3 et 4.

What is the Whitmore section?

The Whitmore section is the effective width of gusset that resists the brace force at the end of the bolt group. You find it by drawing lines at 30° from the outer bolts of the first row and measuring across them at the last row. Here that is 2 × 12 × tan 30° plus the 5.5 in gage, 19.356 in. If the gusset edge cuts across those lines, only the plate that is actually there counts.

Why is K = 1.2 used for gusset buckling?

The gusset is welded to the girder along one edge, and the brace end of it is free to move out of plane. That is a column fixed against rotation at both ends but free to translate at one, for which the AISC Commentary gives a recommended K of 1.2. A corner gusset attached to both a beam and a column is held on two edges and is usually given a lower K.

What else should be checked on the girder?

This connection design covers the girder web under the gusset force. The girder itself must also be designed as a member for the brace forces, including any unbalanced vertical force when the braces do not carry equal loads. When the gusset pulls down on the flange, flange local bending (AISC 360-16 J10.1) is worth checking too. In seismic special concentrically braced frames, AISC 341 adds capacity design requirements for the beam and the connection.

Comment cela changerait-il pour AISC ASD au lieu de LRFD?

Les états limites et les résistances nominales sont identiques. With AISC ASD you compare the service-level brace force against the nominal strength divided by a safety factor instead of multiplying by a resistance factor. Un facteur de résistance de 0.75 devient un facteur de sécurité de 2.00, 0.90 devient 1.67, and slip with oversized holes goes from 0.85 à 1.76. Les combinaisons de charges changent également, donc la demande est plus faible.

Design a chevron brace connection for free

Chaque numéro sur cette page provient d'une seule solution. Pick the chevron brace configuration, entrez votre faisceau, croisillons, gusset, boulons, weld and brace forces, et voyez chacune de ces vérifications dans votre navigateur. Il n'y a rien à installer.

Le module SkyCiv Connection Design est le logiciel de conception de connexion derrière cet exemple. Il vous donne le rapport de calcul complet avec chaque équation et vos chiffres, comme les étapes ci-dessus, plus toutes les capacités et DCR, selon AISC 360-16 (LRFD et TSA) et AS 4100:2020. Ce logiciel calculateur de boulons et calculateur de soudure couvrir le groupe de boulons et les contrôles de soudure seuls.

Références

  • AISC 360-16, Spécification pour les bâtiments en acier de construction: B4.3, D3 (Table D3.1 Case 2), E3 (Eq. E3-1, E3-2, E3-4), J2.2b (Table J2.4), J2.4 (Eq. J2-4), J3.2, J3.3, J3.4 (Tableau J3.4), J3.5 (Tableau J3.5), J3.8 (Eq. J3-4, Table J3.1), J3.10 (Eq. J3-6a, J3-6c), J4.1 (Eq. J4-1, J4-2), J4.2 (Eq. J4-3), J4.3 (Eq. J4-5), J4.4, J10.2 (Eq. J10-2), J10.3 (Eq. J10-4).
  • Manuel de construction en acier AISC, 15e édition: Partie 9, Fig. 9-1 (Whitmore section, de SkiCiv 9-4) et éq. 9-2; Partie 10, weld length less 2w at the ends; Partie 13, weld ductility factor.
  • Guide de conception AISC 29, Vertical Bracing Connections: Exemple 5.3 (gusset edge stresses) and Example 5.9 (chevron brace forces at the beam).
  • Conception d'assemblages en acier utilisant AISC 360-16
  • Boulons et soudures dans la conception de connexion SkyCiv
Harold Munalem, Chef de produit pour la conception de connexion SkyCiv

Harold Munalem
Chef de produit, Conception de connexion
10+ années dans la conception d'assemblages en acier
LinkedIn

Comment pouvons nous aider?

×

Aller en haut