A fillet weld group is the set of welds that join one part to another, for example the C-shaped weld around the leg of an angle on a beam web. When the load does not pass through the centroid of the group, the welds also resist a moment, and the strength of the group depends on its shape, the load direction and the eccentricity. AISC 360-16 Section J2.4 gives the strength of fillet welds, and the AISC Manual Part 8 turns it into the instantaneous center of rotation method for weld groups. This article explains how SkyCiv Connection Design applies that method and works it with the numbers from a real double angle connection.
What is the capacity of a fillet weld group?
A single fillet weld is strongest when it is loaded across its length and weakest when it is loaded along it: AISC 360-16 J2.4 increases the strength of a weld element by [mathin] 1.0 + 0.5\sin^{1.5}\theta [mathin], 哪里 [mathin] \theta [mathin] is the angle between the load and the weld axis. A weld group under an eccentric load rotates about a point called the instantaneous center (我知道了). Each short piece of weld moves at right angles to the line joining it to the IC, by an amount proportional to its distance, and resists with a force that follows the weld’s load and deformation curve. The group’s strength is the load at which the most strained piece reaches its deformation limit.
The weld group check governs where welds carry an eccentric load: angles and plates welded to a beam web, brackets, and welded legs of shear connections. It matters most when the load is large compared with the weld length or acts far from the weld group, and when the load has an axial part, because the direction of the resultant then changes how much each weld piece can carry. The base metal next to the weld can also limit the weld size that is worth using, so the check comes with a base metal limit.
The equations SkyCiv uses
For an eccentric weld group, the AISC Manual Part 8 writes the design strength as:
[math] \phi R_{n} = \phi C C_{1} D l \quad \text{(Manual Eq. 8-21)} [math]
哪里:
- [mathin] \phi = 0.75 [mathin] is the resistance factor (LRFD)
- [mathin] C [mathin] is the weld group coefficient, in kip/in per sixteenth of an inch of weld size, from the instantaneous center method
- [mathin] C_{1} [mathin] is the electrode strength coefficient, 1 for E70XX (手动表 8-3)
- [mathin] D [mathin] is the weld size in sixteenths of an inch, limited to [mathin] D_{max} [mathin] for the base metal
- [mathin] l [mathin] is the length of the vertical weld
SkyCiv finds the IC by iteration. It splits the welds into short segments, works out each segment’s reaction from the Manual’s load and deformation relationship, and moves the IC until the segment reactions balance the applied load. [mathin] C [mathin] is the resulting group strength divided by [mathin] D l [mathin]. The base metal limit on the weld size is:
[math] D_{max} = \frac{\min\left( t_{a} F_{ua},\ d_{ct} F_{ub} \right)}{3.09\ \text{kip/in} \times F_{EXX}/F_{E70XX}} \quad \text{(Manual Eq. 9-2)} [math]
与 [mathin] t_{a} [mathin] 和 [mathin] F_{ua} [mathin] for the angle, 和 [mathin] d_{ct} [mathin] 和 [mathin] F_{ub} [mathin] 用于梁腹板.
SkyCiv uses the instantaneous center method for eccentrically loaded weld groups such as the C-shaped angle weld below. Other welds in the software use simpler methods: straight welds loaded directly, such as a directly welded beam web, 使用AISC 360-16 情商. J2-4 with the [mathin] 1.0 + 0.5\sin^{1.5}\theta [mathin] increase, and the welds of a double angle to its support use the elastic method of Manual Part 10, 情商. 10-1一个.
Worked example: double angle welded to a beam web
This example is Check 2 的 double angle shear and axial connection design example: 二 5/8 in angles, 12 长, welded to the web of a W18x50 beam with 3/16 in E70XX fillet welds on three sides, and bolted to a W14x90 column flange. The connection carries [mathin] V_{u} = 38\ \text{kip} [mathin] shear and 132 kip axial tension or compression. It was solved again on the current release and the numbers are the same as on the published example.

海拔. Each angle is welded to the beam web along its 12 in length and across its top and bottom, a C-shaped weld group on each side of the web.
Load on the welds
The welds carry the resultant of the shear and the axial force:
[math] R_{u} = \sqrt{38^{2} + 132^{2}} = 137.36\ \text{kip} [math]
Base metal limit
The angles are 0.625 在厚. The beam web is welded on both faces, so each weld is checked against half the 0.355 在网络中, [mathin] d_{ct} = 0.1775\ \text{in} [mathin]. 两者都是 [mathin] F_{u} = 65\ \text{ksi} [mathin]:
[math] D_{max} = \frac{\min\left( 0.625 \times 65,\ 0.1775 \times 65 \right)}{3.09 \times 1} = 3.7338 [math]
该 3/16 在焊缝中, [mathin] D = 3 [mathin], is below this limit, so the full weld size counts.
Weld group coefficient
Each weld group has a vertical length [mathin] L = 12\ \text{in} [mathin] and horizontal returns [mathin] kL = 2.5\ \text{in} [mathin], with an eccentricity [mathin] e = 2.6324\ \text{in} [mathin]. The report splits the group into 90 段, 30 along the vertical weld and 30 along each return. The iteration puts the IC at:
[math] x_{ic} = -1.2142\ \text{in}, \quad y_{ic} = 13.581\ \text{in} [math]
The segment reactions add up to [mathin] \Sigma r_{ux} = 109.68\ \text{kip} [mathin] 和 [mathin] \Sigma r_{uy} = 31.57\ \text{kip} [mathin], with a moment about the IC of [mathin] \Sigma M_{ru,ic} = 80.38\ \text{kip-ft} [mathin]. The ratio of the two sums is the same as 38 至 132, so the resultant is mostly along the beam axis, which is the direction of the axial load. Dividing the resultant of the sums by [mathin] D l = 3 \times 12 [mathin]:
[math] C = \frac{\sqrt{109.68^{2} + 31.57^{2}}}{3 \times 12} = 3.17\ \text{kip/in} [math]
Design strength
The two angles give two weld groups, so the length is [mathin] 2L = 24\ \text{in} [mathin]:
[math] \phi R_{n} = \phi C C_{1} D \left( 2L \right) = 0.75 \times 3.17 \times 1 \times 3 \times 24 = 171.18\ \text{kip} [math]
[math] DCR = \frac{R_{u}}{\phi R_{n}} = \frac{137.36}{171.18} = 0.80244 [math]
The weld passes with about 20% to spare. The base metal limit of [mathin] D_{max} = 3.7338 [mathin] means a 1/4 在焊缝中 ([mathin] D = 4 [mathin]) would only count as 3.7338 十六分之几, so the beam web, not the weld, would limit a larger weld.
How SkyCiv Connection Design reports it
The weld group appears in the summary of checks as "Design Capacity of Weld at Beam Side" with a demand of 137.361 kip, a capacity of 171.18 kip and a DCR of 0.802435. The row links to the calculation, which shows the base metal limit with the numbers substituted, then a table of the weld segment coordinates, the IC location from the iteration, a table of the reactions of every segment with their sums, the coefficient [mathin] C [mathin], and finally Eq. 8-21 with the numbers in it and the PASS or FAIL result. The segment tables let you check the IC solution by hand.
What to change if it fails
- Use a longer angle or plate: a longer vertical weld raises [mathin] l [mathin] 和, by reducing the relative eccentricity, also raises [mathin] C [mathin].
- Increase the weld size, but only up to [mathin] D_{max} [mathin]. Past that, the base metal governs and a bigger weld does not add strength.
- Increase the base metal: a thicker angle, or a beam with a thicker web, raises [mathin] D_{max} [mathin] and lets a larger weld count.
- Use longer returns if the detail allows: the horizontal welds help resist the moment.
- Use a stronger electrode only where the base metal is not the limit, 以来 [mathin] D_{max} [mathin] falls as [mathin] F_{EXX} [mathin] rises.
常见问题
Why use the instantaneous center method instead of the elastic method?
The elastic method assumes every part of the weld stays elastic and the most stressed point governs, 这是保守的. The instantaneous center method lets the welds redistribute load as they deform, so the whole group works together and the strength is higher for the same weld. The AISC Manual Part 8 tables for eccentrically loaded weld groups are built on this method.
What does the weld group coefficient C mean?
[mathin] C [mathin] is the strength of the weld group per sixteenth of an inch of weld size per inch of vertical weld length. It already includes the effect of the eccentricity, the load direction and the shape of the group. Multiplying it by [mathin] \phi [mathin], [mathin] C_{1} [mathin], [mathin] D [mathin] 和 [mathin] l [mathin] gives the design strength. 这里 [mathin] C = 3.17\ \text{kip/in} [mathin].
Why is the beam web only half its thickness in the base metal check?
There is a weld on each face of the web, one from each angle, and both pull on the same web. Giving each weld half of the web thickness, 0.1775 在的 0.355 在网络中, accounts for the web being shared.
How does axial load change the weld check?
The welds carry the resultant of the shear and the axial force, and the direction of that resultant changes how much each weld segment can carry. In this example the 132 kip axial force is much larger than the 38 基普剪, so the resultant of 137.36 kip acts mostly along the beam, and the segment reactions in the report point mostly in that direction.
Check a weld group in your own connection
Choose a welded shear connection in the 免费连接设计计算器, 输入您的会员, welds and loads, and the weld group is solved by the instantaneous center method for you.
SkyCiv 连接设计模块为您提供完整的计算报告,其中包含每个方程和您的数字, 对于AISC 360-22 和AISC 360-16 (LRFD 和 ASD) 并作为 4100:2020. 该 焊接计算器 covers weld groups on their own, 和 双角连接计算器 covers this connection type. The same instantaneous center approach for bolt groups is explained in 使用 ICOR 计算螺栓组.
参考资料
- AISC 360-16, 钢结构建筑规范: J2.4 (情商. J2-4).
- AISC 钢结构手册, 15第版: 部分 8, eccentrically loaded weld groups (首先介绍你自己和你申请的职位 8-9 至 8-12, 情商. 8-21, 桌子 8-3); 部分 9 情商. 9-2; 部分 10 情商. 10-1一个.
- Double angle shear and axial connection design example
- 焊缝 SkyCiv 连接设计
哈罗德穆纳勒姆
产品经理, 连接设计
10+ 从事钢结构连接设计多年
领英
