To design an extended end plate beam splice to AS 4100, you follow the bending moment and the shear across the joint. Each beam is welded to its own end plate in the shop, and the two plates are bolted face to face on site. The moment becomes a couple of flange forces: the tension flange pulls its end plate away from the other one, the plate bends between the bolts, and the bolts on both sides of that flange carry the tension across the joint. The compression flange pushes the plates together, and the shear is taken by the bolts on the compression side. A splice also has to carry the minimum design actions of Clause 9.1.4, whatever the analysis gives.

本页从头到尾介绍一个示例: 二 410 UB 53.7 beams of Grade 300 joined by two 28 mm Grade 250 端板, with eight M24 8.8/TB bolts in the four bolt extended (4Ë) form, for a design bending moment of 192 kNm and a design shear of 35 千牛, designed to AS 4100:2020. 每个方程都用它的数字写出来, in the same order as the calculation report that the SkyCiv Connection Design 模块为其生成. The scope and conventions of the AS 4100 module are on the design of steel connections using AS 4100:2020 页.

What is an extended end plate beam splice?

An extended end plate beam splice joins two lengths of beam end to end with a moment connection. Each beam end is cut square and fillet welded all round to a plate that is wider and deeper than the beam. The plates are then bolted together, so the splice can be made on site with bolts only. "Extended" means the plates project past the beam flanges, so a row of bolts can sit outside the tension flange as well as inside it. That outer row has a longer lever arm and adds a lot to the moment the bolts can carry.

The splice is used where a beam is too long to transport or erect in one piece, or where a frame is split into parts that are bolted up on site. In the AS 4100 module the same card covers the level splice, and the sloped version at the ridge of a portal frame is the Apex End Plate card. You can also try it in the 梁拼接计算器.

In this example the plates are unstiffened, with one bolt row outside each flange and two rows between the flanges, so there are eight bolts in four rows of two on a 140 mm gauge.

Extended end plate beam splice elevation: 二 410 UB 53.7 beams with 10 mm E49XX fillet welds to 28 mm end plates

Elevation of the example splice, with the design actions as entered. The flanges and the web are welded to the end plates with 10 mm fillet welds on both sides.

A-A部分: 28 x 230 X 623 mm end plate, eight M24 8.8/TB bolts at 140 mm gauge, 65 mm from each beam flange

A-A部分. The 4E form has one bolt row 65 mm outside each flange and one 65 mm inside it, 与 45 mm edge distances on the plate.

SkyCiv 连接设计装配选项卡: 加长端板 230 x 623 X 28 毫米, AS / NZS 3678 Gr.250, in the 3D view

The same splice in SkyCiv Connection Design, with the end plate selected on the Assembly tab.

Extended end plate beam splice design: 步骤一目了然

First find the design actions, not less than the Clause 9.1.4 minimums for a splice. 然后:

  1. Check the connection detailing limits: gauge, 沥青, 边缘距离, plate width and minimum weld sizes.
  2. Check the beam flange welds for the flange force.
  3. Check the beam web welds on the tension side for the yield capacity of the web.
  4. Check the beam web welds on the compression side for the design shear.
  5. Check the bolts at the tension flange for the design moment.
  6. 检查螺栓组的剪切情况.
  7. Check the bolt group in bearing on the end plates.
  8. Check the end plate in bending, by yield lines.
  9. Check the end plate extension in shear yield.
  10. Check the end plate extension in shear rupture.

本示例的设计输入

The design code is AS 4100:2020, with section properties from the Australian section database. The yield strength of each part follows its grade and thickness: 的 10.9 mm beam flange gives 320 MPa for the Grade 300 光束, 和 28 mm Grade 250 end plate gives 250 兆帕. In the program the loads are entered as Fy (剪力) 和 Mz (片刻), as for every code.

物品象征值
设计弯矩 (load entered as Mz)[mathin] M_{x}^{*} [mathin]192 千牛·米
Design shear (load entered as Fy)[mathin] V^{*} [mathin]35 千牛
横梁, both sides of the splice410 UB 53.7, AS / NZS 3679.1 Gr.300
波束深度 / 腹板厚度[mathin] d_{bm},\ t_{wb} [mathin]403 毫米 / 7.6 毫米
梁翼缘宽度 / 厚度[mathin] b_{fb},\ t_{fb} [mathin]178 毫米 / 10.9 毫米
Beam root radius[mathin] r_{b} [mathin]11.4 毫米
光束面积 / plastic section modulus[mathin] A_{bm},\ S_{x} [mathin]6890 平方毫米 / 1.06 x 10⁶ mm³
光束产率 / 抗拉强度[mathin] f_{yb},\ f_{ub} [mathin]320 兆帕 / 440 兆帕
弹性模量[mathin] E [mathin]200000 兆帕
物品象征值
端板 (二, face to face)PL 28 X 230 X 623, AS / NZS 3678 Gr.250
End plate thickness / 宽度 / 深度[mathin] t_{i},\ b_{i},\ d_{i} [mathin]28 毫米 / 230 毫米 / 623 毫米
端板成品率 / 抗拉强度[mathin] f_{yi},\ f_{ui} [mathin]250 兆帕 / 410 兆帕
螺栓8 x M24 8.8/TB, threads included in the shear plane
螺栓直径 / minimum tensile strength[mathin] d_{f},\ f_{uf} [mathin]24 毫米 / 830 兆帕
螺栓拉应力区 / core area[mathin] A_{s},\ A_{c} [mathin]353 平方毫米 / 324 平方毫米
Holes in the end plates[mathin] d_{h} [mathin]标称, 26 毫米
Beam flange to end plate welds10 mm fillet both sides, E49XX, SP
Beam web to end plate welds10 mm fillet both sides, E49XX, SP
Weld metal strength[mathin] f_{uw} [mathin]490 兆帕
几何象征值
End plate form4Ë, four bolt extended, 未加强的
Bolt rows outside each flange / between the flanges[mathin] n_{po},\ n_{p} [mathin]1 / 2
螺栓柱[mathin] n_{g} [mathin]2
Bolt gauge[mathin] s_{g} [mathin]140 毫米
Bolt row to the beam flange face[mathin] s_{po} [mathin]65 毫米
端板垂直边距[mathin] a_{e} [mathin]45 毫米
端板水平边距[mathin] l_{eh\_ep} [mathin]45 毫米

The end plate depth is the beam depth plus, at each end, 的 65 mm to the outer bolt row and the 45 毫米边缘距离: 403 + 2 X 110 = 623 毫米.

设计动作 (作为 4100 条款 9.1.4)

条款 9.1.4 sets minimum design actions for a splice in a flexural member. The design bending moment is not taken less than 0.3 times the design section moment capacity of the beam:

[math] M^{*} = \max\left( M_{x}^{*},\ 0.3\, \phi\, f_{yb}\, S_{x} \right) = \max\left( (192\ \text{kNm}),\ 0.3 \times (0.9) \times (320\ \text{MPa}) \times (1.06 \times 10^{6}\ \text{mm}^{3}) \right) = 192\ \text{kNm} [math]

该 192 kNm entered is larger than the minimum, so it is used as is. Over the lever arm between the flange centres, it gives the flange force:

[math] N^{*}_{tm} = \frac{M^{*}}{d_{bm} – t_{fb}} = \frac{192\ \text{kNm}}{(403\ \text{mm}) – (10.9\ \text{mm})} = 489.67\ \text{kN} [math]

The design shear is not taken less than the larger of 0.15 times the design shear capacity of the uncoped beam (条款 5.11.2) 和 40 千牛:

[math] \phi V_{vo} = \phi\, 0.6\, f_{yb}\, d_{bm}\, t_{wb} = (0.9) \times 0.6 \times (320\ \text{MPa}) \times (403\ \text{mm}) \times (7.6\ \text{mm}) = 529.25\ \text{kN} [math]

[math] V^{*}_{min} = \max\left( 0.15\, \phi V_{vo},\ 40\ \text{kN} \right) = \max\left( 0.15 \times (529.25\ \text{kN}),\ 40\ \text{kN} \right) = 79.388\ \text{kN} [math]

[math] V^{*} = \max\left( V^{*},\ V^{*}_{min} \right) = \max\left( 35\ \text{kN},\ 79.388\ \text{kN} \right) = 79.388\ \text{kN} [math]

Here the minimum governs, so every shear check below uses 79.388 千牛, 不是 35 kN entered.

步骤 1: 连接详细限制 (作为 4100 Clauses 9.5, 9.6.3.2)

Before any capacity check, the bolt layout has to be buildable and match the assumptions behind the capacity equations. The bolts need room for a wrench, the edges must be far enough from the holes, and the welds must be big enough for the parts they join.

The report lists each limit next to the value it is compared with, without a derivation, so the limits below are the software’s limits for this connection. Several match AS 4100 直接地: 的 60 mm minimum gauge and pitch is [mathin] 2.5\, d_{f} = 2.5 \times 24\ \text{mm} [mathin] (条款 9.5.1), 的 42 mm minimum edge distance is [mathin] 1.75\, d_{f} [mathin] (条款 9.5.2, 桌子 9.5.2), 的 150 mm maximum edge distance is the Clause 9.5.3 cap, 和 6 mm minimum fillet weld is the Table 9.6.3.2 size for the thicker part joined, 的 28 mm end plate.

详细限制限制 (毫米)实际的 (毫米)直流电结果
Minimum Bolt Gauge60.000140.0000.429通过
Maximum Bolt Gauge178.000140.0000.787通过
Minimum Bolt Pitch across the Tension Flange60.000140.9000.426通过
Minimum Vertical Edge Distance on End Plate42.00045.0000.933通过
Minimum Horizontal Edge Distance on End Plate42.00045.0000.933通过
Maximum Edge Distance150.00045.0000.300通过
Minimum Bolt Gauge for Wrench Clearance77.600140.0000.554通过
Minimum Flange to Bolt Row Distance35.00065.0000.538通过
Minimum End Plate Width198.000230.0000.861通过
Minimum Fillet Weld Size at Beam Flange to End Plate6.00010.0000.600通过
Minimum Fillet Weld Size at Beam Web to End Plate6.00010.0000.600通过

对于最小限制,该比率是实际值的限制, 对于最大值来说,它实际上超出了限制. The governing rows are the vertical and horizontal edge distances on the end plate:

[math] DCR = \frac{42\ \text{mm}}{45\ \text{mm}} = 0.933 [math]

DCR = 0.933 ≤ 1.0, 行

步骤 2: Design capacity of the beam flange welds (作为 4100 条款 9.6.3.10)

The fillet welds round the tension flange carry the whole flange force into the end plate. The design force on them is the flange force from the design moment, [mathin] N^{*}_{fw} = N^{*}_{tm} = 489.67\ \text{kN} [mathin]. The welds are Structural Purpose (SP), so the capacity factor is 0.8 从表 3.4. The design capacity per unit length of an equal-leg fillet weld:

[math] \phi v_{w} = \phi\, 0.6\, f_{uw}\, \frac{\sqrt{2}}{2}\, t_{wf} = (0.8) \times 0.6 \times (490\ \text{MPa}) \times \frac{\sqrt{2}}{2} \times (10\ \text{mm}) = 1.6631\ \text{kN/mm} [math]

The welds run across the outside of the flange and along the inside on both sides of the web, stopping at the root radii:

[math] L_{wf} = 2\, b_{fb} – t_{wb} – 2\, r_{b} = 2 \times (178\ \text{mm}) – (7.6\ \text{mm}) – 2 \times (11.4\ \text{mm}) = 325.6\ \text{mm} [math]

[math] \phi N_{w} = \phi v_{w}\, L_{wf} = (1.6631\ \text{kN/mm}) \times (325.6\ \text{mm}) = 541.51\ \text{kN} [math]

[math] N^{*}_{fw} = 489.67\ \text{kN} \le \phi N_{w} = 541.51\ \text{kN} [math]

DCR = 489.67 千牛 / 541.51 kN = 0.904 ≤ 1.0, 行

This is the governing strength check of the splice.

步骤 3: Beam web welds in tension (作为 4100 Clauses 7.2, 9.6.3.10)

The web welds on the tension side of the neutral axis are designed to develop the design yield capacity of the web, not just the share of the moment the web carries. That keeps the welds from being the weak link if the web yields. The weld length on the tension side runs from mid-depth to the root radius:

[math] L_{wt} = 0.5\, d_{bm} – t_{fb} – r_{b} = 0.5 \times (403\ \text{mm}) – (10.9\ \text{mm}) – (11.4\ \text{mm}) = 179.2\ \text{mm} [math]

[math] \phi N_{wt} = \phi\, f_{ywb}\, t_{wb}\, L_{wt} = (0.9) \times (320\ \text{MPa}) \times (7.6\ \text{mm}) \times (179.2\ \text{mm}) = 392.23\ \text{kN} [math]

该 10 mm web welds have the same capacity per unit length as the flange welds, 1.6631 千牛/毫米, on both sides of the web:

[math] \phi V_{wt} = 2\, \phi v_{w}\, L_{wt} = 2 \times (1.6631\ \text{kN/mm}) \times (179.2\ \text{mm}) = 596.06\ \text{kN} [math]

[math] \phi N_{wt} = 392.23\ \text{kN} \le \phi V_{wt} = 596.06\ \text{kN} [math]

DCR = 392.23 千牛 / 596.06 kN = 0.658 ≤ 1.0, 行

步骤 4: Beam web welds in shear (作为 4100 条款 9.6.3.10)

The design shear is taken by the web welds on the compression side of the neutral axis, [mathin] V^{*}_{vw} = V^{*} = 79.388\ \text{kN} [mathin]. Their length is the same as on the tension side:

[math] L_{wc} = 0.5\, d_{bm} – t_{fb} – r_{b} = 0.5 \times (403\ \text{mm}) – (10.9\ \text{mm}) – (11.4\ \text{mm}) = 179.2\ \text{mm} [math]

[math] \phi V_{wc} = 2\, \phi v_{w}\, L_{wc} = 2 \times (1.6631\ \text{kN/mm}) \times (179.2\ \text{mm}) = 596.06\ \text{kN} [math]

[math] V^{*}_{vw} = 79.388\ \text{kN} \le \phi V_{wc} = 596.06\ \text{kN} [math]

DCR = 79.388 千牛 / 596.06 kN = 0.133 ≤ 1.0, 行

步骤 5: Design capacity of the bolts at the tension flange (作为 4100 Clauses 9.2.2.2, 9.3.2)

In the 4E form the two bolt rows next to the tension flange, one outside and one inside, take the tension, two bolts per row. The bolts rotate about the centre of the compression flange, so each row’s lever arm is measured from there:

[math] d_{10} = 462.55\ \text{mm}, \qquad d_{11} = 321.65\ \text{mm} [math]

[math] \Sigma d_{i} = d_{10} + d_{11} = (462.55\ \text{mm}) + (321.65\ \text{mm}) = 784.2\ \text{mm} [math]

The design capacity of one bolt in tension, with a capacity factor of 0.8:

[math] \phi N_{tf} = \phi\, A_{s}\, f_{uf} = (0.8) \times (353\ \text{mm}^{2}) \times (830\ \text{MPa}) = 234.39\ \text{kN} [math]

The end plates are made thick enough to keep the bolts free of prying (条款 9.1.8, checked in Step 8), so every tension bolt can reach [mathin] \phi N_{tf} [mathin]:

[math] \phi M_{bt} = 2\, \phi N_{tf}\, \Sigma d_{i} = 2 \times (234.39\ \text{kN}) \times (784.2\ \text{mm}) = 367.62\ \text{kNm} [math]

[math] M^{*} = 192\ \text{kNm} \le \phi M_{bt} = 367.62\ \text{kNm} [math]

DCR = 192 千牛·米 / 367.62 千牛米= 0.522 ≤ 1.0, 行

步骤 6: Design capacity of the bolt group in shear (作为 4100 条款 9.2.2.1)

The design shear is taken by the bolts on the compression side of the neutral axis, [mathin] n_{cw} = 4 [mathin], 因为拉紧螺栓已经在拉紧状态下​​工作. The threads are in the shear plane, so the core area is used, 和 [mathin] k_{r} = k_{rd} = 1.0 [mathin]:

[math] \phi V_{f} = \phi\, 0.62\, f_{uf}\, A_{c} = (0.8) \times 0.62 \times (830\ \text{MPa}) \times (324\ \text{mm}^{2}) = 133.38\ \text{kN} [math]

[math] \phi V_{fb} = n_{cw}\, \phi V_{f} = (4) \times (133.38\ \text{kN}) = 533.54\ \text{kN} [math]

[math] V^{*}_{v} = 79.388\ \text{kN} \le \phi V_{fb} = 533.54\ \text{kN} [math]

DCR = 79.388 千牛 / 533.54 kN = 0.149 ≤ 1.0, 行

步骤 7: Bolt group in bearing on the end plates (作为 4100 条款 9.2.2.4)

Each shear bolt bears on its hole in the end plate. The ply can crush at the hole, 上限为 [mathin] 3.2\, d_{f}\, t_{i}\, f_{ui} [mathin], or tear out to the plate edge or to the next hole. 和 [mathin] d_{h} = 26\ \text{mm} [mathin]:

[math] a_{e1} = a_{e} – \frac{d_{h}}{2} + \frac{d_{f}}{2} = (45\ \text{mm}) – \frac{26\ \text{mm}}{2} + \frac{24\ \text{mm}}{2} = 44\ \text{mm} [math]

The least pitch from a shear bolt row to the next row is 140.9 毫米, the distance across the flange from the outer row to the inner row:

[math] a_{e2} = s_{pv} – d_{h} + \frac{d_{f}}{2} = (140.9\ \text{mm}) – (26\ \text{mm}) + \frac{24\ \text{mm}}{2} = 126.9\ \text{mm} [math]

The capacity factor for a ply in bearing is 0.9:

[math] \phi V_{bi} = \phi \min\left( 3.2\, d_{f}\, t_{i}\, f_{ui},\ a_{e1}\, t_{i}\, f_{ui},\ a_{e2}\, t_{i}\, f_{ui} \right) [math]

[math] \phi V_{bi} = (0.9) \times \min\left( 3.2 \times (24)(28)(410),\ (44)(28)(410),\ (126.9)(28)(410) \right) \times 10^{-3} = 454.61\ \text{kN} [math]

[math] \phi V_{b} = n_{cw}\, \phi V_{bi} = (4) \times (454.61\ \text{kN}) = 1818.4\ \text{kN} [math]

[math] V^{*}_{v} = 79.388\ \text{kN} \le \phi V_{b} = 1818.4\ \text{kN} [math]

DCR = 79.388 千牛 / 1818.4 kN = 0.044 ≤ 1.0, 行

The edge distance term governs each bolt, 但是一个 28 mm plate leaves bearing far from critical.

步骤 8: Design bending capacity of the end plate (作为 4100 Clauses 9.1.8, 9.3.2)

The end plate bends between the tension flange, the web and the bolts. Its capacity is found from a yield line pattern, and it is compared with a required capacity rather than with the design moment: 条款 9.1.8 asks for prying to be allowed for, and the module removes it by making the plate at least 1.11 times as strong as the tension bolts or as the beam, 我们将通过计算地形因子来讨论地形对结构风荷载的影响. A plate that strong stays thick enough that the bolts carry only their direct tension.

The design section moment capacity of the beam:

[math] \phi M_{s} = \phi\, f_{yb}\, S_{x} = (0.9) \times (320\ \text{MPa}) \times (1.06 \times 10^{6}\ \text{mm}^{3}) = 305.28\ \text{kNm} [math]

[math] M^{*}_{p} = \min\left( 1.11\, \phi M_{bt},\ 1.11\, \phi M_{s} \right) = \min\left( 1.11 \times (367.62\ \text{kNm}),\ 1.11 \times (305.28\ \text{kNm}) \right) = 338.86\ \text{kNm} [math]

Yield line factor

The width of plate that takes part in the yield lines is limited to the flange width plus 25 毫米:

[math] b_{i,e} = \min\left( b_{i},\ b_{fb} + 25 \right) = \min\left( 230\ \text{mm},\ (178\ \text{mm}) + (25\ \text{mm}) \right) = 203\ \text{mm} [math]

[math] a_{h} = 0.5 \sqrt{b_{i,e}\, s_{g}} = 0.5 \sqrt{(203\ \text{mm}) \times (140\ \text{mm})} = 84.291\ \text{mm} [math]

[math] s_{pi} = \min\left( s_{po},\ a_{h} \right) = \min\left( 65\ \text{mm},\ 84.291\ \text{mm} \right) = 65\ \text{mm} [math]

For the 4E form the yield line factor is:

[math] Y_{p} = 0.5\, b_{i,e} \left[ d_{11} \left( \frac{1}{s_{pi}} + \frac{1}{a_{h}} \right) + \frac{d_{10}}{s_{po}} – 0.5 \right] + \frac{2}{s_{g}}\, d_{11} \left( s_{pi} + a_{h} \right) = 2247.1\ \text{mm} [math]

与 [mathin] b_{i,e} = 203\ \text{mm} [mathin], [mathin] s_{g} = 140\ \text{mm} [mathin], [mathin] d_{10} = 462.55\ \text{mm} [mathin], [mathin] d_{11} = 321.65\ \text{mm} [mathin], [mathin] s_{pi} = s_{po} = 65\ \text{mm} [mathin] 和 [mathin] a_{h} = 84.291\ \text{mm} [mathin].

Plate capacity

[math] \phi M_{pt} = \phi\, f_{yi}\, t_{i}^{2}\, Y_{p} = (0.9) \times (250\ \text{MPa}) \times (28\ \text{mm})^{2} \times (2247.1\ \text{mm}) = 396.39\ \text{kNm} [math]

[math] M^{*}_{p} = 338.86\ \text{kNm} \le \phi M_{pt} = 396.39\ \text{kNm} [math]

DCR = 338.86 千牛·米 / 396.39 千牛米= 0.855 ≤ 1.0, 行

Because the requirement is tied to the beam capacity and not to the design moment, this ratio does not change with the load. It is what sets the 28 mm plate thickness.

步骤 9: Shear yield of the end plate extension (software check)

The report gives this check without a clause, so it is the software’s check.

The part of the plate outside the tension flange carries the pull of the outer bolt row back to the flange, so it is checked in shear across its full width. The flange force is shared by the two bolt rows at the tension flange, [mathin] n_{bp} = 2 [mathin]:

[math] V^{*}_{p} = \frac{N^{*}_{ft}}{n_{bp}} = \frac{489.67\ \text{kN}}{2} = 244.84\ \text{kN} [math]

[math] \phi V_{pe} = \phi\, 0.5\, f_{yi}\, b_{i}\, t_{i} = (0.9) \times 0.5 \times (250\ \text{MPa}) \times (230\ \text{mm}) \times (28\ \text{mm}) = 724.5\ \text{kN} [math]

[math] V^{*}_{p} = 244.84\ \text{kN} \le \phi V_{pe} = 724.5\ \text{kN} [math]

DCR = 244.84 千牛 / 724.5 kN = 0.338 ≤ 1.0, 行

步骤 10: Shear rupture of the end plate extension (software check, holes to Clause 14.3.2)

This check also has no clause in the report; 只有 26 mm hole size is cited, to Clause 14.3.2.

The same section is checked for rupture on its net width, less the two bolt holes:

[math] \phi V_{pu} = \phi\, 0.6\, f_{ui} \left( b_{i} – 2\, d_{h} \right) t_{i} = (0.9) \times 0.6 \times (410\ \text{MPa}) \times \left( (230\ \text{mm}) – 2 \times (26\ \text{mm}) \right) \times (28\ \text{mm}) = 1103.5\ \text{kN} [math]

[math] V^{*}_{p} = 244.84\ \text{kN} \le \phi V_{pu} = 1103.5\ \text{kN} [math]

DCR = 244.84 千牛 / 1103.5 kN = 0.222 ≤ 1.0, 行

检查摘要

设计检查Design action effectDesign capacity直流电结果
连接详细限制42 毫米45 毫米0.933通过
梁翼缘焊缝489.671 千牛541.51 千牛0.904通过
Beam web welds in tension392.233 千牛596.06 千牛0.658通过
Beam web welds in shear79.388 千牛596.06 千牛0.133通过
受拉法兰处的螺栓192 千牛·米367.62 千牛·米0.522通过
剪切螺栓组79.388 千牛533.537 千牛0.149通过
Bolt group in bearing on the end plates79.388 千牛1818.43 千牛0.044通过
End plate in bending338.861 千牛·米396.392 千牛·米0.855通过
End plate extension, shear yield244.835 千牛724.5 千牛0.338通过
End plate extension, shear rupture244.835 千牛1103.46 千牛0.222通过

The splice passes every check. 最高比例, 0.933, is the detailing check: 的 45 mm edge distances on the end plate against the 42 mm minimum for an M24 bolt. 强度检查, the beam flange welds govern at 0.904, followed by the end plate in bending at 0.855. The bolts are lightly used in tension (0.522) and in shear (0.149), because the plate was sized to stay thick and the shear is small.

如果检查失败要更改什么

  • 构造限制: move the bolts to the edge distances and gauge in Step 1, or widen the end plate. A thicker end plate also raises the Table 9.6.3.2 最小焊接尺寸.
  • 梁翼缘焊缝: increase the fillet weld size. The weld length is fixed by the flange, so a larger weld or a stronger electrode is the only change.
  • 梁腹板焊缝: increase the web weld size. The tension side is designed for the web’s yield capacity, so a lower moment does not help.
  • 受拉法兰处的螺栓: 使用更大的螺栓或更高等级的螺栓, move the outer row further from the flange, 或添加螺栓行.
  • Bolt group in shear or bearing: 使用更大的螺栓, or increase the edge distance on the end plate.
  • End plate in bending: use a thicker end plate. The capacity grows with the square of the thickness, and the required capacity depends on the bolts and the beam, not on the load.
  • End plate extension: use a thicker or wider end plate.

常见问题

Why is the shear 79.388 kN when 35 kN was entered?

条款 9.1.4 sets a minimum design shear for a splice in a flexural member. The program takes the larger of 0.15 times the design shear capacity of the uncoped beam and 40 千牛. 为一个 410 UB 53.7 那是 0.15 X 529.25 kN = 79.388 千牛, which is more than the 35 kN entered, so the shear checks use 79.388 千牛. The moment is treated the same way, 但 192 kNm is already above its minimum of 0.3 times the beam’s design section moment capacity.

Why is the end plate checked against 338.86 kNm when the design moment is 192 千牛·米?

The end plate is designed to be thick enough that the bolts are free of prying, as Clause 9.1.8 requires prying to be allowed for. The module asks for a plate bending capacity of at least 1.11 times the lesser of the tension bolt capacity and the beam’s design section moment capacity. 这里就是 1.11 X 305.28 千牛米= 338.86 千牛·米. The bolt check in Step 5 can then use the full bolt tension capacity with no prying force added.

Why do only four bolts take the shear?

The four bolts at the tension flange are already working in tension. The design shear is given to the four bolts on the compression side of the neutral axis, [mathin] n_{cw} = 4 [mathin], where the plates are pressed together.

Why are the web welds checked for 392.23 kN when there is no axial force?

On the tension side the web welds are sized to develop the design yield capacity of the web, not just the share of the moment the web carries. If the beam is loaded to its capacity near the splice, the web can yield before the welds do. The demand is therefore a property of the beam, and the ratio of 0.658 stays the same at any load.

What does form 4E mean?

The drawing notes give the end plate form. 4E is four bolt extended and unstiffened: two bolts in one row outside the tension flange and two in one row inside it, repeated at the other flange so the splice works for a moment in either direction. The lever arms in Step 5 and the yield line factor in Step 8 are the 4E ones.

Why are the bolts 8.8/TB?

The bolting category is chosen in the program. TB means the bolts are fully tensioned and designed as a bearing joint, so the shear and bearing checks of Clauses 9.2.2.1 和 9.2.2.4 申请. Tensioned bolts are usual in an end plate moment splice, because they keep the plates in contact under service loads.

Design an extended end plate beam splice for free

此页上的每个数字都来自一个解决方案. Pick AS 4100:2020 and the extended end plate beam splice, enter your beams, 端板, bolts and design actions, 并在浏览器中查看每项检查. 没有什么可安装的.

SkyCiv Connection Design 模块是本示例背后的连接设计软件. 它为您提供完整的计算报告,其中包含每个方程和您的数字, 就像上面的步骤一样, plus every design capacity and DCR, 对于作为 4100:2020 剪力连接, 弯矩连接 and splices. 该 螺栓计算器 和 焊接计算器 自行覆盖螺栓组和焊接检查.

参考资料

哈罗德穆纳勒姆, SkyCiv 连接设计产品经理

哈罗德穆纳勒姆
产品经理, 连接设计
10+ 从事钢结构连接设计多年
领英

我们能为您提供什么帮助?

×

回到顶部