Vertical brace connection design to AISC 360 starts with the Uniform Force Method, which splits each brace force between the gusset-to-beam interface, the gusset-to-column interface and the beam-to-column connection. Then each interface gets its own checks: the brace bolts and the gusset at the brace, the weld and the beam web where the gusset meets the beam, the bolted single plate where the gusset meets the column, and the single plate that carries the beam’s shear and axial force into the column flange.
Diese Seite ist von Anfang bis Ende ein echtes Beispiel. A W18x50 beam frames into the flange of a W14x90 column, with a gusset above and below the beam. Each gusset takes a 2L5x5x1/2 brace at 45° that carries 62 kip in tension or compression (LRFD). The beam also carries 38 kip of shear and a 132 kip transfer force. All bolts are 1 in A490 slip-critical. Das Design ist AISC 360-16, the AISC Manual 15th Edition and AISC Design Guide 29. Jede Gleichung wird mit ihren Zahlen ausgeschrieben, in the same order as the calc sheet that the SkyCiv-Verbindungsdesign Modul erzeugt für diese Verbindung.
What is a vertical brace connection?
A vertical brace connection joins a diagonal brace to the corner where a beam meets a column, through a gusset plate attached to both. In a braced frame these connections carry the lateral load down the building. Here there are two corners at the same beam-to-column joint: one gusset sits on top of the beam with a brace rising away from the column, and a second gusset hangs below the beam with a brace running down. Each brace is a pair of 5x5x1/2 angles back to back, one on each face of its gusset.
Each gusset is shop welded to the beam flange and bolted to the column flange through a 3/8 in single plate. The beam is bolted to the column through a 1/2 in single plate welded to the column flange. Because the gusset touches two members, the brace force does not have one obvious path, and the Uniform Force Method decides how much goes where. Sie können dieses Beispiel direkt im überprüfen Rechner für vertikale Aussteifungsverbindungen. The beam-to-column part is a Einzelplattenverbindung carrying both shear and axial force. The brace-to-gusset checks are the same ones used in the Rechner für Chevron-Klammerverbindungen und das Rechner für die Verbindung von Kniestützen.

Höhe der Beispielverbindung. Both gussets are 15 1/2 in square, and each brace line runs through the work point where the beam and column centrelines meet.
Vertical brace connection design: Die Schritte auf einen Blick
- Distribute the brace force with the Uniform Force Method.
- Überprüfen Sie die Detaillierungsgrenzen an den Strebenschrauben.
- Check the slip resistance of the brace bolts.
- Check bolt bearing and tear-out on the gusset.
- Check bolt bearing and tear-out on the brace angles.
- Check block shear of the gusset at the brace.
- Check block shear of the brace angles.
- Check the gusset in tension on its Whitmore section.
- Prüfen Sie die Strebe auf Zugbruch mit Schubverzögerung.
- Check the gusset in compression buckling.
- Check the minimum fillet weld size at the beam.
- Check the gusset-to-beam weld.
- Check the gusset in shear yielding along the beam.
- Check the gusset in tension yielding along the beam.
- Check the beam web under the gusset.
- Check the detailing limits of the gusset-to-column single plate.
- Check the gusset-to-column bolt group.
- Check that the gusset single plate is thin enough to be ductile.
- Check bolt bearing on the gusset single plate.
- Check bolt bearing on the gusset at the column.
- Check block shear of the gusset single plate.
- Check block shear of the gusset at the column.
- Check the gusset single plate in shear.
- Check the gusset single plate in flexure.
- Check the gusset single plate in tension, with interaction.
- Check the gusset single plate in compression, with interaction.
- Check the weld size at the gusset single plate.
- Check the gusset single plate weld to the column.
- Check the column web under the gusset force.
- Check the detailing limits of the beam single plate.
- Check the beam-to-column bolt group.
- Check that the beam single plate is thin enough to be ductile.
- Check bolt bearing on the beam single plate.
- Check bolt bearing on the beam web.
- Check block shear of the beam single plate.
- Check block shear of the beam web under axial load.
- Check the beam single plate in shear.
- Check the beam single plate in flexure.
- Check the beam single plate in tension, with interaction.
- Check the beam single plate in compression, with interaction.
- Check the beam in tension rupture.
- Check the weld size at the beam single plate.
- Check the beam single plate weld to the column.
- Check the column web under the beam axial force.
Designeingaben für dieses Beispiel
Der Designcode ist AISC 360-16 LRFD. Abschnittseigenschaften stammen aus dem AISC-Handbuch. The upper and lower brace connections are identical and mirror each other about the beam, and the report’s results for the two match exactly, so Steps 2 zu 29 are worked once and apply to both.
| Artikel | Symbol | Wert |
|---|---|---|
| Brace force, Zug oder Druck (each brace) | [mathin] P [mathin] | 62 kip |
| Beam shear | [mathin] V_ Statistics script Complianz GDPR/CCPA 6 [mathin] | 38 kip |
| Beam transfer force, Zug oder Druck | [mathin] T_ Statistics script Complianz GDPR/CCPA 5,\ C_ Statistics script Complianz GDPR/CCPA 4 [mathin] | 132 kip |
| Spalte | B14x90, A992 | |
| Spaltentiefe / Bahndicke | [mathin] d_ Statistics script Complianz GDPR/CCPA 3,\ t_ Statistics script Complianz GDPR/CCPA 2 [mathin] | 14 im / 0.44 im |
| Breite des Stützenflansches / Dicke | [mathin] b_ Statistics script Complianz GDPR/CCPA 1,\ t_ Statistics script Complianz GDPR/CCPA 0 [mathin] | 14.5 im / 0.71 im |
| Spalte kdes | [mathin] k_{des,c} [mathin] | 1.31 im |
| Strahl | B18x50, A992 | |
| Strahltiefe / Bahndicke | [mathin] d_{bm},\ t_{w,bm} [mathin] | 18 im / 0.355 im |
| Breite des Trägerflansches / Dicke | [mathin] b_{f,bm},\ t_{f,bm} [mathin] | 7.5 im / 0.57 im |
| Strahlbereich / Wo | [mathin] A_{bm},\ k_{des,bm} [mathin] | 14.7 in² / 0.972 im |
| Beam setback from the column face | [mathin] clr [mathin] | 0.75 im |
| Column and beam yield / Zugspannung | [mathin] F_{y},\ F_{u} [mathin] | 50 KSI / 65 KSI |
| Zahnspange (jede) | 2L5x5x1/2, A36 | |
| Bereich der Zahnspange (both angles) | [mathin] A_{br} [mathin] | 9.58 in² |
| Angle leg thickness / den Schwerpunkt | [mathin] t_{l,br},\ \bar{y} [mathin] | 0.5 im / 1.42 im |
| Brace angle from the support | [mathin] \theta [mathin] | 45° |
| Brace unbraced length on the gusset | [mathin] L_{b} [mathin] | 9 im |
| Klammerausbeute / Zugspannung | [mathin] F_{y,br},\ F_{u,br} [mathin] | 36 KSI / 58 KSI |
| Elastizitätsmodul | [mathin] E [mathin] | 29000 KSI |
| Artikel | Symbol | Wert |
|---|---|---|
| Knotenbleche | 1/2 im, Klasse A572 50, 15.5 in x 15.5 im | |
| Zwickelstärke | [mathin] t_{gp} [mathin] | 0.5 im |
| Zwickelausbeute / Zugspannung | [mathin] F_{y,gp},\ F_{u,gp} [mathin] | 50 KSI / 65 KSI |
| Schrauben (alles) | 1 im A490-SC, Class A surface | |
| Brace bolts: Reihen / Abstand / Linien | [mathin] n_{r},\ s_{r},\ n_{c} [mathin] | 3 / 3 im / 1 |
| Brace bolts: gage on the angle leg / end distance | [mathin] g_{a},\ L_{ev} [mathin] | 3 im / 1.5 im |
| Löcher in der Strebe / Zwickel | Standard (STD) / übergroß (OVS) | |
| Gusset-to-beam weld | [mathin] W,\ F_{EXX} [mathin] | 3/16 in fillet both sides, E70XX, 15.5 in long |
| Gusset single plate | PL 3/8 x 3 3/4 x 12, A36 | |
| Gusset single plate bolts: Reihen / Abstand / Linien | [mathin] n_{r},\ s_{r},\ n_{c} [mathin] | 4 / 3 im / 1 |
| Holes in gusset / gusset single plate | STD / horizontal short slots (HSSL) | |
| Gusset single plate weld to column | [mathin] W [mathin] | 1/4 in fillet both sides, E70XX |
| Beam single plate | PL 1/2 x 6 3/4 x 15, Klasse A572 50 | |
| Beam single plate bolts: Reihen / Abstand | [mathin] n_{r},\ s_{r} [mathin] | 5 / 3 im |
| Beam single plate bolts: Linien / Abstand | [mathin] n_{c},\ s_{c} [mathin] | 2 / 3 im |
| Horizontal edge distance, all plates | [mathin] L_{eh} [mathin] | 1.5 im |
| Holes in beam web / beam single plate | STD / HSSL | |
| Beam single plate weld to column | [mathin] W [mathin] | 5/16 in fillet both sides, E70XX |
The A36 grade on the 3/8 in gusset single plate and the angles is normal for those parts. All three interfaces use slip-critical bolts, which is required here because every interface has oversized or slotted holes (AISC 360-16 J3.2).
Schritt 1: Distribute the brace force with the Uniform Force Method (AISC-Handbuch Teil 13)
The Uniform Force Method picks gusset dimensions so that the forces at the gusset-to-beam and gusset-to-column interfaces carry no moment, then splits the brace force between them. Whatever horizontal force the gusset puts into the column has to come back out of the beam, so it also changes the axial force in the beam-to-column connection.
Wo [mathin] e_{b} = d_{bm}/2 = 9\,in [mathin], [mathin] e_{c} = d_{c}/2 = 7\,in [mathin], [mathin] \tan\theta = 1 [mathin] und [mathin] \beta = 7.75\,in [mathin], half the gusset height on the column. The ideal centroid of the gusset-to-beam force follows from the UFM constraint:
[math] \alpha = e_{b} \tan\theta – e_{c} + \beta \tan\theta = (9\,in) \times (1) – (7\,in) + (7.75\,in) \times (1) = 9.75\,in [math]
The actual centroid of the gusset-to-beam weld is [mathin] \bar{\alpha} = 15.5/2 + 0.75 = 8.5\,in [mathin] from the column face: half the gusset length plus the setback. The distance that sets the force split is:
[math] r = \sqrt{\left( \alpha + e_{c} \right)^{2} + \left( \beta + e_{b} \right)^{2}} = \sqrt{\left( (9.75\,in) + (7\,in) \right)^{2} + \left( (7.75\,in) + (9\,in) \right)^{2}} = 23.688\,in [math]
The interface forces, mit [mathin] P = 62\,kip [mathin]:
[math] H_{c} = \frac{e_{c}\, P}{r} = \frac{(7\,in) \times (62\,kip)}{(23.688\,in)} = 18.321\,kip [math]
[math] H_{b} = \frac{\alpha\, P}{r} = \frac{(9.75\,in) \times (62\,kip)}{(23.688\,in)} = 25.519\,kip [math]
The vertical force at the beam would be [mathin] e_{b} P / r = 23.556\,kip [mathin]. This report uses Special Case 2 of the method (AISC-Handbuch Teil 13, Design-Leitfaden 29 Beispiel 5.3) and moves all of it to the gusset-to-column interface as [mathin] \Delta V_{b} = 23.556\,kip [mathin]. That way the beam-to-column connection does not have to carry the brace’s vertical force, at the cost of a moment on the gusset-to-beam interface:
[math] V_{c} = \frac{\beta\, P}{r} + \Delta V_{b} = \frac{(7.75\,in) \times (62\,kip)}{(23.688\,in)} + (23.556\,kip) = 43.841\,kip [math]
[math] V_{b} = \frac{e_{b}\, P}{r} – \Delta V_{b} = \frac{(9\,in) \times (62\,kip)}{(23.688\,in)} – (23.556\,kip) = 0\,kip [math]
[math] M_{b} = V_{b} \left| \alpha – \bar{\alpha} \right| + \Delta V_{b} \left| \alpha \right| = (0\,kip) \times \left| (9.75\,in) – (8.5\,in) \right| + (23.556\,kip) \times \left| (9.75\,in) \right| = 19.139\,kip{\cdot}ft [math]
The beam-to-column connection then carries the beam’s own forces plus the horizontal force each gusset sends straight to the column, which the beam has to bring back:
[math] C_{total} = T_{total} = C_{u} + \max\left( H_{c,upper},\, H_{c,lower} \right) = (132\,kip) + (18.321\,kip) = 150.32\,kip [math]
[math] V_{total} = V_{u} + V_{b,upper} + V_{b,lower} = (38\,kip) + (0\,kip) + (0\,kip) = 38\,kip [math]
Because the brace is at 45° and [mathin] e_{b} > e_{c} [mathin], the beam interface takes the larger share of the horizontal force, 25.519 kip of the 43.84 kip brace component.
Schritt 2: Detaillierungsgrenzen an den Strebenschrauben (AISC 360-16 J3.3, J3.4, J3.5)
Die Schraubenanordnung muss baubar sein und den Annahmen hinter den Festigkeitsgleichungen entsprechen. Zu enge Schrauben reißen zwischen den Löchern, und zu enge Kanten reißen aus.

Detail der Strebenverbindung. Three bolts per brace at 3 im, oversized holes in the gusset and standard holes in the angles.
Für ein 1 Im Bolzen beträgt der Mindestabstand [mathin] 2\tfrac{2}{3} d_{b} = 2.667\,in [mathin] (J3.3) und der minimale Randabstand beträgt 1.25 im (Tabelle J3.4). Der Zwickel hat übergroße Löcher, also die Tabelle J3.5 Inkrement von 1/8 in erhöht seinen minimalen Endabstand auf 1.375 im.
| Detaillierungslimit | Limit (im) | Tatsächlich (im) | DCR | Ergebnis |
|---|---|---|---|---|
| Mindestbolzenstärke | 2.000 | 3.000 | 0.667 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Mindestabstand der Schraubenreihen | 2.667 | 3.000 | 0.889 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Maximaler Schraubenreihenabstand | 6.000 | 3.000 | 0.500 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset minimum vertical edge distance (OVS) | 1.375 | 1.500 | 0.917 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimaler vertikaler Randabstand der Strebe | 1.250 | 1.500 | 0.833 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimaler horizontaler Randabstand der Strebe | 1.250 | 2.000 | 0.625 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
The horizontal edge distance on the angle is the 5 in leg less the 3 im Messgerät, 2 im. Die maßgebende Reihe ist der Endabstand des Knotenblechs mit seinem übergroßen Lochabstand:
[math] DCR = \frac{d}{c} = \frac{(1.375)}{(1.5)} = 0.91667 [math]
DCR = 0.917 < 1.0, in Ordnung
Schritt 3: Slip resistance of the brace bolts (AISC 360-16 J3.8)
Der Zwickel hat übergroße Löcher, welche AISC 360-16 J3.2 allows only in slip-critical joints. The bolts are pretensioned, and friction between the angles and the gusset carries the brace force. Es wird geprüft, ob die Verbindung unter der berücksichtigten Belastung nicht verrutscht.
Wo [mathin] \phi = 0.85 [mathin] für übergroße Löcher, [mathin] \mu = 0.3 [mathin] for a Class A surface, [mathin] D_{u} = 1.13 [mathin], [mathin] h_{f} = 1 [mathin] weil es keine Füllstoffe gibt, [mathin] T_{b} = 64\,kip [mathin] für ein 1 in A490-Bolzen (Tabelle J3.1), [mathin] N_{s} = 2 [mathin] slip planes because the gusset sits between the two angles, [mathin] n_{r} = 3 [mathin] und [mathin] n_{c} = 1 [mathin]:
[math] \phi R_{n} = \phi\, \mu\, D_{u}\, h_{f}\, T_{b}\, N_{s}\, n_{r}\, n_{c} [math]
[math] \phi R_{n} = (0.85) \times (0.3) \times (1.13) \times (1) \times (64\,kip) \times (2) \times (3) \times (1) [math]
[math] \phi R_{n} = 110.65\,kip [math]
DCR = 62 kip / 110.65 kip = 0.560 < 1.0, in Ordnung
The double angle doubles the slip strength for free: each bolt clamps two faying surfaces.
Schritt 4: Bolt bearing and tear-out on the gusset (AISC 360-16 J3.10)
Schlupfkritische Schrauben müssen weiterhin auf Lagerung geprüft werden, because if the joint slips the bolts bear on the sides of their holes. The bolt nearest the gusset’s edge has the least material in front of it.
Das Zwickelloch ist überdimensioniert, [mathin] d_{h} = 1.25\,in [mathin]. Clear distances for the end bolt and between bolts:
[math] l_{c1} = L_{ev} – \frac{d_{h}}{2} = (1.5\,in) – \frac{(1.25\,in)}{2} = 0.875\,in [math]
[math] l_{c2} = s_{r} – d_{h} = (3\,in) – (1.25\,in) = 1.75\,in [math]
Wo [mathin] t_{gp} = 0.5\,in [mathin], [mathin] F_{u,gp} = 65\,ksi [mathin], [mathin] n_{r} = 3 [mathin], [mathin] n_{c} = 1 [mathin], [mathin] d_{b} = 1\,in [mathin] und [mathin] \phi = 0.75 [mathin]:
[math] \phi R_{n} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t_{gp} F_{u,gp}\, n_{c} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{gp} F_{u,gp}\, n_{c} \left( n_{r} – 1 \right) \right] [math]
[math] \phi R_{n} = (0.75) \times \left[ \min\left(1.2 \times (0.875\,in),\, 2.4 \times (1\,in)\right) \times (0.5\,in) \times (65\,ksi) \times (1) + \min\left(1.2 \times (1.75\,in),\, 2.4 \times (1\,in)\right) \times (0.5\,in) \times (65\,ksi) \times (1) \times ((3) – 1) \right] [math]
[math] \phi R_{n} = 127.97\,kip [math]
DCR = 62 kip / 127.97 kip = 0.484 < 1.0, in Ordnung
Tear-out governs every bolt, because the oversized hole cuts into the clear distance.
Schritt 5: Bolzenlager und Ausreißer an der Strebe (AISC 360-16 J3.10)
The same check applies to the angles. Both angle legs bear on the bolts, so the bearing thickness is twice the leg, [mathin] 2 t_{l,br} = 1\,in [mathin].
The angles have standard holes, [mathin] d_{h} = 1.125\,in [mathin]:
[math] l_{c1} = (1.5\,in) – \frac{(1.125\,in)}{2} = 0.9375\,in \qquad l_{c2} = (3\,in) – (1.125\,in) = 1.875\,in [math]
Mit [mathin] F_{u,br} = 58\,ksi [mathin]:
[math] \phi R_{n} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) 2 t_{l,br} F_{u,br}\, n_{c} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) 2 t_{l,br} F_{u,br}\, n_{c} \left( n_{r} – 1 \right) \right] [math]
[math] \phi R_{n} = (0.75) \times \left[ \min\left(1.2 \times (0.9375\,in),\, 2.4 \times (1\,in)\right) \times (1\,in) \times (58\,ksi) \times (1) + \min\left(1.2 \times (1.875\,in),\, 2.4 \times (1\,in)\right) \times (1\,in) \times (58\,ksi) \times (1) \times ((3) – 1) \right] [math]
[math] \phi R_{n} = 244.69\,kip [math]
DCR = 62 kip / 244.69 kip = 0.253 < 1.0, in Ordnung
Schritt 6: Block shear of the gusset at the brace (AISC 360-16 J4.3)
A block of the gusset can tear out around the bolts: shear along the bolt line and tension across to the gusset’s edge. With one bolt line, this is an L-shaped block.
Wo [mathin] L_{eh,gp} = 2\,in [mathin] is the edge distance on the gusset beside the bolt line, [mathin] L_{br,gp} = 9\,in [mathin] is the length of brace on the gusset, and each hole adds 1/16 in for damage (B4.3):
[math] A_{nt} = t_{gp} \left[ (n_{c}-1)\, s_{c} + L_{eh,gp} – (n_{c} – 0.5) \left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ 0 + (2\,in) – ((1) – 0.5) \times ((1.25\,in) + (0.0625\,in)) \right] = 0.67188\,in^{2} [math]
[math] A_{gv} = t_{gp} \left[ L_{ev} + (n_{r}-1)\, s_{r} \right] = (0.5\,in) \times \left[ (1.5\,in) + ((3)-1) \times (3\,in) \right] = 3.75\,in^{2} [math]
[math] A_{nv} = t_{gp} \left[ L_{br,gp} – L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ (9\,in) – (1.5\,in) – ((3) – 0.5) \times ((1.25\,in) + (0.0625\,in)) \right] = 2.1094\,in^{2} [math]
Mit [mathin] U_{bs} = 1 [mathin] und [mathin] \phi = 0.75 [mathin]:
[math] \phi R_{n} = \phi \left( 0.6\, F_{u} A_{nv} + U_{bs} F_{u} A_{nt} \le 0.6\, F_{y} A_{gv} + U_{bs} F_{u} A_{nt} \right) [math]
[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (2.1094\,in^{2}) + (1) \times (65\,ksi) \times (0.67188\,in^{2}) \le 0.6 \times (50\,ksi) \times (3.75\,in^{2}) + (1) \times (65\,ksi) \times (0.67188\,in^{2}) \right) = 94.453\,kip [math]
DCR = 62 kip / 94.453 kip = 0.656 < 1.0, in Ordnung
This is the highest strength check on the brace side. Shear rupture on the net section governs over shear yielding.
Schritt 7: Blockscherung der Stütze (AISC 360-16 J4.3)
The same tear-out can happen in the angle legs. Both angles act together, so the thickness is [mathin] 2 t_{l,br} = 1\,in [mathin], with standard holes [mathin] d_{h} = 1.125\,in [mathin] und das 2 in leg edge [mathin] L_{eh,br} [mathin]:
[math] A_{nt} = (1\,in) \times \left[ 0 + (2\,in) – 0.5 \times ((1.125\,in) + (0.0625\,in)) \right] = 1.4063\,in^{2} [math]
[math] A_{gv} = (1\,in) \times \left[ (1.5\,in) + 2 \times (3\,in) \right] = 7.5\,in^{2} [math]
[math] A_{nv} = (1\,in) \times \left[ (9\,in) – (1.5\,in) – 2.5 \times ((1.125\,in) + (0.0625\,in)) \right] = 4.5313\,in^{2} [math]
[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (58\,ksi) \times (4.5313\,in^{2}) + (1) \times (58\,ksi) \times (1.4063\,in^{2}) \le 0.6 \times (36\,ksi) \times (7.5\,in^{2}) + (1) \times (58\,ksi) \times (1.4063\,in^{2}) \right) = 179.44\,kip [math]
DCR = 62 kip / 179.44 kip = 0.346 < 1.0, in Ordnung
Schritt 8: Gusset in tension on the Whitmore section (AISC 360-16 J4.1)
The brace force spreads into the gusset at about 30° on each side of the bolt line. The Whitmore section is the width of that spread at the last bolt, and the gusset has to yield and rupture on it no earlier than the brace force.
Mit [mathin] L_{br} = (n_{r}-1) s_{r} = 6\,in [mathin] und [mathin] W_{br} = 0 [mathin] for a single bolt line (AISC Manual Fig. 9-1):
[math] W = 2\, L_{br} \tan 30^{\circ} + W_{br} = 2 \times (6\,in) \times \tan 30^{\circ} + 0 = 6.9282\,in [math]
[math] \phi R_{n,ty} = \phi\, F_{y,gp}\, t_{gp}\, W = (0.9) \times (50\,ksi) \times (0.5\,in) \times (6.9282\,in) = 155.88\,kip [math]
[math] \phi R_{n,tr} = \phi\, F_{u,gp}\, t_{gp} \left[ W – n_{c}\left( d_{h} + 0.0625\,in \right) \right] = (0.75) \times (65\,ksi) \times (0.5\,in) \times \left[ (6.9282\,in) – (1) \times ((1.25\,in) + (0.0625\,in)) \right] = 136.88\,kip [math]
DCR = 62 kip / 136.88 kip = 0.453 < 1.0, in Ordnung
Schritt 9: Stützen Sie den Zugbruch mit Schubverzögerung ab (AISC 360-16 D3, J4.1)
Only one leg of each angle is bolted, so the stress in the outstanding legs has to lag in through the connected legs. The shear lag factor U reduces the net area to account for this.
Mit [mathin] \bar{y} = 1.42\,in [mathin] and connection length [mathin] (n_{r}-1) s_{r} = 6\,in [mathin] (Tabelle D3.1, Fall 2):
[math] U = 1 – \frac{\bar{y}}{(n_{r}-1)\, s_{r}} = 1 – \frac{(1.42\,in)}{((3)-1) \times (3\,in)} = 0.76343 [math]
[math] \phi R_{n} = \phi\, F_{u,br}\, U \left[ A_{br} – n_{c} \left( d_{h} + 0.0625\,in \right) 2 t_{l,br} \right] = (0.75) \times (58\,ksi) \times (0.76343) \times \left[ (9.58\,in^{2}) – (1) \times ((1.125\,in) + (0.0625\,in)) \times (1\,in) \right] = 278.71\,kip [math]
DCR = 62 kip / 278.71 kip = 0.222 < 1.0, in Ordnung
Schritt 10: Gusset in compression buckling (AISC 360-16 J4.4, E3)
When the brace pushes, the Whitmore strip of gusset between the last bolt and the gusset’s supported edges acts as a short column.
Mit [mathin] K = 1.2 [mathin], [mathin] L = 9\,in [mathin] und [mathin] r = t_{gp}/\sqrt{12} [mathin], [mathin] KL/r = 74.825 [mathin], which is above 25, so Chapter E applies. It is also below [mathin] 4.71\sqrt{E/F_{y}} = 113.43 [mathin], also Gl. E3-2 applies:
[math] F_{e} = \frac{\pi^{2} E}{\left( KL/r \right)^{2}} = \frac{\pi^{2} \times (29000\,ksi)}{(74.825)^{2}} = 51.122\,ksi [math]
[math] F_{cr} = 0.658^{\frac{F_{y}}{F_{e}}} F_{y} = 0.658^{\frac{(50\,ksi)}{(51.122\,ksi)}} \times (50\,ksi) = 33.204\,ksi [math]
[math] \phi R_{n} = \phi\, F_{cr}\, t_{gp}\, W = (0.9) \times (33.204\,ksi) \times (0.5\,in) \times (6.9282\,in) = 103.52\,kip [math]
DCR = 62 kip / 103.52 kip = 0.599 < 1.0, in Ordnung
Buckling cuts the gusset’s compression strength to about two thirds of its yield strength in tension. Ein 9 in unbraced length is about the most a 1/2 in gusset can take at this load.
Schritt 11: Minimum fillet weld size at the beam (AISC 360-16 J2.2b)
Eine Kehlnaht, die für die zu verbindenden Teile zu klein ist, kann beim Abkühlen reißen. Table J2.4 sets the minimum by the thinner part, hier die 1/2 im Zwickel, also das Minimum ist 3/16 im.
[math] DCR = \frac{d}{c} = \frac{(0.188)}{(0.188)} = 1 [math]
DCR = 1.000, in Ordnung
Ein Verhältnis von 1.000 here means the 3/16 in der Schweißnaht ist genau die kleinste zulässige Größe. Its strength is checked next.
Schritt 12: Gusset-to-beam weld (AISC 360-16 J2.4, AISC-Designhandbuch 29)
The weld carries the horizontal force [mathin] H_{b} [mathin] along its length, plus the moment [mathin] M_{b} [mathin] von Step 1 as a varying normal force. The check uses the peak force per inch at the most loaded end.
Grundmetallbeschränkung für die Schweißnahtgröße (AISC-Handbuch Gl. 9-2)
The weld cannot be stronger than the metal it is fused to. The gusset is welded on both faces, so it gets half its thickness per weld:
[math] D_{max} = \frac{t_{f,bm} F_{u,bm} \le 0.5\, t_{gp} F_{u,gp}}{3.09\,kip/in \times 1} = \frac{(0.57\,in) \times (65\,ksi) \le (0.25\,in) \times (65\,ksi)}{(3.09\,kip/in) \times (1)} = 5.2589 [math]
Effektive Schweißnahtlänge
[math] L_{w} = 2 \left[ L_{gp} – 2 W \right] = 2 \times \left[ (15.5\,in) – 2 \times (0.1875\,in) \right] = 30.25\,in [math]
Forces on the weld
The moment becomes a normal force using the plastic section of two weld lines, [mathin] L_{w}^{2}/8 [mathin]. Mit [mathin] V_{b} = 0 [mathin]:
[math] V_{b,total} = \frac{8\, M_{b}}{L_{w}} + V_{b} = \frac{8 \times (19.139\,kip{\cdot}ft)}{(30.25\,in)} + (0\,kip) = 60.74\,kip [math]
[math] R = \sqrt{V_{b,total}^{2} + H_{b}^{2}} = \sqrt{(60.74\,kip)^{2} + (25.519\,kip)^{2}} = 65.883\,kip \qquad \theta = \tan^{-1}\left| \frac{60.74}{25.519} \right| = 67.211^{\circ} [math]
At the other end of the weld the normal force is [mathin] |V_{b} – 8 M_{b}/L_{w}| = 60.74\,kip [mathin], Also [mathin] R_{min} = 65.883\,kip [mathin] too. AISC-Handbuch Teil 13 applies a 1.25 weld ductility factor to the average of the two ends:
[math] R_{w} = \max\left( R,\, 1.25\, \frac{R + R_{min}}{2} \right) = \max\left( (65.883\,kip),\, 1.25 \times \frac{(65.883\,kip) + (65.883\,kip)}{2} \right) = 82.354\,kip [math]
weil [mathin] V_{b} = 0 [mathin], the moment loads both ends equally (one in tension, one in compression), und [mathin] R_{w} [mathin] is simply [mathin] 1.25 R [mathin].
Schweißfestigkeit (Gl. J2-4)
[math] \phi R_{n} = \phi\, 0.6\, F_{EXX} \frac{\sqrt{2}}{2} \left( W \le \frac{D_{max}}{16} \right) \left[ 1 + 0.5 \left( \sin\theta \right)^{1.5} \right] L_{w} [math]
[math] \phi R_{n} = (0.75) \times 0.6 \times (70\,ksi) \times \frac{\sqrt{2}}{2} \times \left( (0.1875\,in) \le \frac{(5.2589)}{(16)} \right) \times \left[ 1 + 0.5 \times (\sin(67.211^{\circ}))^{1.5} \right] \times (30.25\,in) = 182.25\,kip [math]
DCR = 82.354 kip / 182.25 kip = 0.452 < 1.0, in Ordnung
Nearly all of the weld force comes from the Special Case 2 Moment. Ohne es, the weld would only see the 25.519 kip horizontal force.
Schritt 13: Gusset in shear yielding along the beam (AISC 360-16 J4.2)
The horizontal force [mathin] H_{b} [mathin] shears the gusset along its welded edge. Mit [mathin] A_{gv} = 15.5 \times 0.5 = 7.75\,in^{2} [mathin] und [mathin] \phi = 1 [mathin] (Design-Leitfaden 29 Beispiel 5.3):
[math] \phi R_{n} = \phi\, 0.6\, F_{y,gp} A_{gv} = (1) \times 0.6 \times (50\,ksi) \times (7.75\,in^{2}) = 232.5\,kip [math]
DCR = 25.519 kip / 232.5 kip = 0.110 < 1.0, in Ordnung
Schritt 14: Gusset in tension yielding along the beam (AISC 360-16 J4.1)
The moment puts one end of the gusset’s welded edge in tension. Following Design Guide 29 Beispiel 5.3, the normal force and the moment are added as stresses on the edge and turned back into an equivalent force over the full 15.5 in der Länge:
[math] N_{e} = \left| V_{b} \right| + \frac{4 \left| M_{b} \right|}{L_{gp}} = (0\,kip) + \frac{4 \times (19.139\,kip{\cdot}ft)}{(15.5\,in)} = 59.27\,kip [math]
[math] \phi R_{n} = \phi\, F_{y,gp}\, t_{gp}\, L_{gp} = (0.9) \times (50\,ksi) \times (0.5\,in) \times (15.5\,in) = 348.75\,kip [math]
DCR = 59.27 kip / 348.75 kip = 0.170 < 1.0, in Ordnung
Schritt 15: Beam web under the gusset (AISC 360-16 J10.3, J10.2)
The compression half of the gusset moment pushes on the beam flange next to the column, so the beam web there can cripple or yield locally. The gusset sits at the end of the beam, so the near-end forms of the equations apply.
The report applies half the peak normal force, [mathin] 60.74/2 = 30.37\,kip [mathin], over half the gusset length, [mathin] l_{b} = 7.75\,in [mathin]. That models the compression side of the moment couple. Mit [mathin] \phi = 0.75 [mathin], [mathin] l_{b}/d = 0.43 > 0.2 [mathin] und [mathin] Q_{f} = 1 [mathin]:
[math] \phi R_{n,wlc} = \phi\, 0.4\, t_{w}^{2} \left[ 1 + \left( \frac{4 l_{b}}{d} – 0.2 \right) \left( \frac{t_{w}}{t_{f}} \right)^{1.5} \right] \sqrt{\frac{E\, F_{y}\, t_{f}}{t_{w}}}\, Q_{f} [math]
[math] \phi R_{n,wlc} = (0.75) \times 0.4 \times (0.355\,in)^{2} \times \left[ 1 + \left( \frac{4 \times (7.75\,in)}{(18\,in)} – 0.2 \right) \times \left( \frac{(0.355\,in)}{(0.57\,in)} \right)^{1.5} \right] \times \sqrt{\frac{(29000\,ksi) \times (50\,ksi) \times (0.57\,in)}{(0.355\,in)}} \times (1) = 100.85\,kip [math]
Web local yielding near the member end (Gl. J10-3), mit [mathin] \phi = 1 [mathin]:
[math] \phi R_{n,wly} = \phi\, F_{y}\, t_{w} \left( 2.5\, k_{des} + l_{b} \right) = (1) \times (50\,ksi) \times (0.355\,in) \times \left( 2.5 \times (0.972\,in) + (7.75\,in) \right) = 180.69\,kip [math]
DCR = 30.37 kip / 100.85 kip = 0.301 < 1.0, in Ordnung
The report labels the crippling equation J10-4, but the numbers it substitutes are the near-end form with 0.4 und (4lb/d − 0.2), which is Eq. J10-5b. That is the right form for a force this close to the beam end.
Schritt 16: Detailing limits of the gusset single plate (AISC 360-16 J3.3, J3.4, J3.5)
The gusset bolts to a 3/8 in plate welded to the column flange. Die Platte hat horizontale kurze Schlitze, which add 1/8 in to the minimum edge distance across the slot (Tabelle J3.5).

Single plate detail. The gusset plates take four bolts in one line, and the beam plate takes two lines of five. All three plates have horizontal short slots.
| Detaillierungslimit | Limit (im) | Tatsächlich (im) | DCR | Ergebnis |
|---|---|---|---|---|
| Mindestabstand der Schraubenreihen | 2.667 | 3.000 | 0.889 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Maximaler Schraubenreihenabstand | 6.000 | 3.000 | 0.500 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimaler vertikaler Randabstand der Platte | 1.250 | 1.500 | 0.833 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimaler horizontaler Randabstand der Platte (HSSL) | 1.375 | 1.500 | 0.917 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset minimum horizontal edge distance | 1.250 | 1.500 | 0.833 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimum plate depth | 7.750 | 12.000 | 0.646 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
The minimum plate depth is half the 15.5 in gusset edge on the column, so the plate supports at least half the gusset.
DCR = 1.375 / 1.5 = 0.917 < 1.0, in Ordnung
Schritt 17: Gusset-to-column bolt group (AISC 360-16 J3.8, AISC-Handbuch Teil 7)
The four bolts carry [mathin] V_{c} [mathin] und [mathin] H_{c} [mathin] zusammen, at an eccentricity from the weld line. The instantaneous center of rotation method gives the coefficient C: the number of bolts the eccentric group is worth.
The resultant and its angle from vertical:
[math] R = \sqrt{V_{c}^{2} + H_{c}^{2}} = \sqrt{(43.841\,kip)^{2} + (18.321\,kip)^{2}} = 47.515\,kip \qquad \theta = \tan^{-1}\left( \frac{18.321}{43.841} \right) = 22.681^{\circ} [math]
The eccentricity is the distance from the weld to the bolt line, [mathin] e = 2.25\,in [mathin]. For bolts at (0, 0), (0, 3), (0, 6) und (0, 9), the iteration puts the instantaneous center at [mathin] x_{ic} = -4.0517\,in [mathin], [mathin] y_{ic} = 6.7655\,in [mathin], was gibt [mathin] C = 3.14 [mathin] and the moment coefficient [mathin] C’ = 11.256\,in [mathin]. Each bolt is slip-critical, mit [mathin] N_{s} = 1 [mathin]:
[math] \phi R_{n} = \phi\, \mu\, D_{u}\, h_{f}\, T_{b}\, N_{s}\, C = (0.85) \times (0.3) \times (1.13) \times (1) \times (64\,kip) \times (1) \times (3.14) = 57.907\,kip [math]
DCR = 47.515 kip / 57.907 kip = 0.821 < 1.0, in Ordnung
The slots are horizontal and the resultant leans 22.7° toward them, so the report keeps φ = 0.85 for slotted holes. Bolt slip is the highest check on the gusset side.
Schritt 18: Ductility of the gusset single plate (AISC-Handbuch Teil 10)
A single plate has to yield in flexure before the bolts shear off, so the plate cannot be too thick. AISC-Handbuch Teil 10 (Gl. 10-3 und 10-4) gives the maximum thickness from the moment the bolt group can carry.
Mit [mathin] F_{nv} = 68\,ksi [mathin], [mathin] d_{b} = 1\,in [mathin], [mathin] C’ = 11.256\,in [mathin], [mathin] F_{y} = 36\,ksi [mathin] und [mathin] h = 12\,in [mathin]:
[math] M_{max} = \frac{F_{nv}}{0.90} \frac{\pi d_{b}^{2}}{4} C’ = \frac{(68\,ksi)}{0.90} \times \frac{\pi \times (1\,in)^{2}}{4} \times (11.256\,in) = 55.664\,kip{\cdot}ft [math]
[math] t_{max} = \frac{6\, M_{max}}{F_{y}\, h^{2}} = \frac{6 \times (55.664\,kip{\cdot}ft)}{(36\,ksi) \times (12\,in)^{2}} = 0.77311\,in [math]
DCR = 0.375 im / 0.77311 im = 0.485 < 1.0, in Ordnung
Schritt 19: Bolt bearing on the gusset single plate (AISC 360-16 J3.10)
The plate is checked for bearing and tear-out in each direction of load separately, then for both together. Each strength is the average per bolt multiplied by C, so it matches the bolt group’s capacity.
Vertikal (Schub-) Richtung
The vertical hole size is the standard 1.125 im, Also [mathin] l_{c1} = 0.9375\,in [mathin] und [mathin] l_{c2} = 1.875\,in [mathin]. Mit [mathin] t = 0.375\,in [mathin], [mathin] F_{u} = 58\,ksi [mathin] und [mathin] n_{r} = 4 [mathin]:
[math] \phi R_{n,v} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t F_{u} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t F_{u} \left( n_{r} – 1 \right) \right] \frac{C}{n_{r}} [math]
[math] \phi R_{n,v} = (0.75) \times \left[ \min\left(1.125,\, 2.4\right) \times (0.375\,in) \times (58\,ksi) + \min\left(2.25,\, 2.4\right) \times (0.375\,in) \times (58\,ksi) \times ((4) – 1) \right] \times \frac{(3.14)}{(4)} = 100.84\,kip [math]
DCR = 43.841 kip / 100.84 kip = 0.435 < 1.0, in Ordnung
Horizontal (axial) Richtung
Across the slot the hole is 1.3125 in long, Also [mathin] l_{c1} = 1.5 – 1.3125/2 = 0.84375\,in [mathin]. There is one bolt line, so the inner-bolt term is multiplied by [mathin] (n_{c} – 1) = 0 [mathin] and its negative [mathin] l_{c2} = -1.3125\,in [mathin] has no effect:
[math] \phi R_{n,a} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t F_{u} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t F_{u} \left( n_{c} – 1 \right) \right] \frac{C}{n_{c}} [math]
[math] \phi R_{n,a} = (0.75) \times \left[ \min\left(1.0125,\, 2.4\right) \times (0.375\,in) \times (58\,ksi) + 0 \right] \times \frac{(3.14)}{(1)} = 51.862\,kip [math]
DCR = 18.321 kip / 51.862 kip = 0.353 < 1.0, in Ordnung
Interaction
[math] \left( \frac{V_{c}}{\phi R_{n,v}} \right)^{2} + \left( \frac{H_{c}}{\phi R_{n,a}} \right)^{2} = \left( \frac{(43.841\,kip)}{(100.84\,kip)} \right)^{2} + \left( \frac{(18.321\,kip)}{(51.862\,kip)} \right)^{2} = 0.31381 [math]
DCR = 0.314 < 1.0, in Ordnung
Schritt 20: Bolt bearing on the gusset at the column (AISC 360-16 J3.10)
The same three checks apply to the 1/2 im Zwickel, das Standardlöcher hat.
Vertikal (Schub-) Richtung
Mit der 12 in plate is centred on the 15.5 in gusset edge, so the gusset’s end distance is [mathin] L_{ev} = (15.5 – 12)/2 + 1.5 = 3.25\,in [mathin] und [mathin] l_{c1} = 2.6875\,in [mathin]. Mit [mathin] t = 0.5\,in [mathin] und [mathin] F_{u} = 65\,ksi [mathin]:
[math] \phi R_{n,v} = (0.75) \times \left[ \min\left(3.225,\, 2.4\right) \times (0.5\,in) \times (65\,ksi) + \min\left(2.25,\, 2.4\right) \times (0.5\,in) \times (65\,ksi) \times ((4) – 1) \right] \times \frac{(3.14)}{(4)} = 175.08\,kip [math]
DCR = 43.841 kip / 175.08 kip = 0.250 < 1.0, in Ordnung
Horizontal (axial) Richtung
Mit dem 1.5 in edge and the standard hole, [mathin] l_{c1} = 0.9375\,in [mathin]:
[math] \phi R_{n,a} = (0.75) \times \left[ \min\left(1.125,\, 2.4\right) \times (0.5\,in) \times (65\,ksi) + 0 \right] \times \frac{(3.14)}{(1)} = 86.105\,kip [math]
DCR = 18.321 kip / 86.105 kip = 0.213 < 1.0, in Ordnung
Interaction
[math] \left( \frac{(43.841\,kip)}{(175.08\,kip)} \right)^{2} + \left( \frac{(18.321\,kip)}{(86.105\,kip)} \right)^{2} = 0.10798 [math]
DCR = 0.108 < 1.0, in Ordnung
Schritt 21: Block shear of the gusset single plate (AISC 360-16 J4.3)
A block can tear out of the plate under the vertical force, under the horizontal force, or under both. The vertical case is an L-shaped block down the bolt line. The horizontal case has two shapes, L and U, and the weaker governs.
Vertikal (Schub-) Richtung
The tension leg crosses half a slotted hole, [mathin] d_{h} = 1.3125\,in [mathin]:
[math] A_{nt} = (0.375\,in) \times \left[ (1.5\,in) – 0.5 \times ((1.3125\,in) + (0.0625\,in)) \right] = 0.30469\,in^{2} [math]
[math] A_{gv} = (0.375\,in) \times \left[ (1.5\,in) + 3 \times (3\,in) \right] = 3.9375\,in^{2} [math]
[math] A_{nv} = t \left[ h_{sp} – L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.375\,in) \times \left[ (12\,in) – (1.5\,in) – 3.5 \times ((1.125\,in) + (0.0625\,in)) \right] = 2.3789\,in^{2} [math]
[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (58\,ksi) \times (2.3789\,in^{2}) + (1) \times (58\,ksi) \times (0.30469\,in^{2}) \le 0.6 \times (36\,ksi) \times (3.9375\,in^{2}) + (1) \times (58\,ksi) \times (0.30469\,in^{2}) \right) = 75.343\,kip [math]
DCR = 43.841 kip / 75.343 kip = 0.582 < 1.0, in Ordnung
Horizontal (axial) Richtung
The L pattern tears in tension along the bolt line and shears across the top. The shear leg runs from the bolt to the unbraced end of the plate, [mathin] b_{sp} – L_{b,sp} = 3.75 – 2.25 = 1.5\,in [mathin]:
[math] A_{nt} = (0.375\,in) \times \left[ 3 \times (3\,in) + (1.5\,in) – 3.5 \times (1.1875\,in) \right] = 2.3789\,in^{2} \quad A_{gv} = 0.5625\,in^{2} \quad A_{nv} = 0.30469\,in^{2} [math]
[math] \phi R_{n,L} = (0.75) \times \left( 0.6 \times (58\,ksi) \times (0.30469\,in^{2}) + (1) \times (58\,ksi) \times (2.3789\,in^{2}) \le 0.6 \times (36\,ksi) \times (0.5625\,in^{2}) + (1) \times (58\,ksi) \times (2.3789\,in^{2}) \right) = 111.43\,kip [math]
The U pattern tears in tension between the outer bolts and shears out at the top and bottom:
[math] A_{nt} = (0.375\,in) \times \left[ 3 \times (3\,in) – 3 \times (1.1875\,in) \right] = 2.0391\,in^{2} \quad A_{gv} = 2 \times (0.375\,in) \times (1.5\,in) = 1.125\,in^{2} \quad A_{nv} = 0.60938\,in^{2} [math]
[math] \phi R_{n,U} = (0.75) \times \left( 0.6 \times (58\,ksi) \times (0.60938\,in^{2}) + (1) \times (58\,ksi) \times (2.0391\,in^{2}) \le 0.6 \times (36\,ksi) \times (1.125\,in^{2}) + (1) \times (58\,ksi) \times (2.0391\,in^{2}) \right) = 104.6\,kip [math]
DCR = 18.321 kip / 104.6 kip = 0.175 < 1.0, in Ordnung
Interaction
[math] \left( \frac{(43.841\,kip)}{(75.343\,kip)} \right)^{2} + \left( \frac{(18.321\,kip)}{(104.6\,kip)} \right)^{2} = 0.36926 [math]
DCR = 0.369 < 1.0, in Ordnung
Schritt 22: Block shear of the gusset at the column (AISC 360-16 J4.3)
The same patterns apply to the gusset, with its 3.25 in end distance.
Vertikal (Schub-) Richtung
[math] A_{nt} = (0.5\,in) \times \left[ (1.5\,in) – 0.5 \times ((1.3125\,in) + (0.0625\,in)) \right] = 0.40625\,in^{2} [math]
[math] A_{gv} = (0.5\,in) \times \left[ (3.25\,in) + 3 \times (3\,in) \right] = 6.125\,in^{2} \qquad A_{nv} = (0.5\,in) \times \left[ (15.5\,in) – (3.25\,in) – 3.5 \times (1.1875\,in) \right] = 4.0469\,in^{2} [math]
[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (4.0469\,in^{2}) + (1) \times (65\,ksi) \times (0.40625\,in^{2}) \le 0.6 \times (50\,ksi) \times (6.125\,in^{2}) + (1) \times (65\,ksi) \times (0.40625\,in^{2}) \right) = 138.18\,kip [math]
DCR = 43.841 kip / 138.18 kip = 0.317 < 1.0, in Ordnung
The tension area uses the plate’s 1.3125 in slot length rather than the gusset’s 1.125 in standard hole. That removes a little more area than the gusset actually loses, so the result is slightly conservative.
Horizontal (axial) Richtung
[math] L:\ A_{nt} = 4.0469\,in^{2},\ A_{gv} = 0.75\,in^{2},\ A_{nv} = 0.40625\,in^{2} \Rightarrow \phi R_{n,L} = 209.17\,kip [math]
[math] U:\ A_{nt} = (0.5\,in) \times \left[ 9\,in – 3 \times (1.1875\,in) \right] = 2.7188\,in^{2},\ A_{gv} = 1.5\,in^{2},\ A_{nv} = 0.8125\,in^{2} \Rightarrow \phi R_{n,U} = 156.3\,kip [math]
DCR = 18.321 kip / 156.3 kip = 0.117 < 1.0, in Ordnung
Interaction
[math] \left( \frac{(43.841\,kip)}{(138.18\,kip)} \right)^{2} + \left( \frac{(18.321\,kip)}{(156.3\,kip)} \right)^{2} = 0.11441 [math]
DCR = 0.114 < 1.0, in Ordnung
Schritt 23: Gusset single plate in shear (AISC 360-16 J4.2)
The plate carries [mathin] V_{c} [mathin] as shear over its 12 in depth. It is checked for yielding on the gross section and rupture through the bolt holes.
[math] \phi R_{n,sy} = \phi\, 0.6\, F_{y} A_{gv} = (1) \times 0.6 \times (36\,ksi) \times (4.5\,in^{2}) = 97.2\,kip [math]
[math] A_{nv} = t \left[ h_{sp} – n_{r} \left( d_{h} + 0.0625\,in \right) \right] = (0.375\,in) \times \left[ (12\,in) – (4) \times (1.1875\,in) \right] = 2.7188\,in^{2} [math]
[math] \phi R_{n,sr} = \phi\, 0.6\, F_{u} A_{nv} = (0.75) \times 0.6 \times (58\,ksi) \times (2.7188\,in^{2}) = 70.959\,kip [math]
DCR = 43.841 kip / 70.959 kip = 0.618 < 1.0, in Ordnung
Schritt 24: Gusset single plate in flexure (AISC-Handbuch Teil 9, AISC 360-16 F11)
The vertical force acts at the bolt line, 2.25 aus der Schweißnaht hinein, so the plate bends. The report treats the plate like a double coped beam: a rectangular section that can buckle laterally over its unbraced length [mathin] L_{b,sp} = 2.25\,in [mathin].
The slenderness ratio [mathin] L_{b} d / t^{2} = 2.25 \times 12 / 0.375^{2} = 192 [mathin] falls between [mathin] 0.08E/F_{y} = 64.444 [mathin] und [mathin] 1.9E/F_{y} = 1530.6 [mathin], also Gl. Es gilt F11-2. Mit [mathin] Z = 13.5\,in^{3} [mathin], [mathin] S = 9\,in^{3} [mathin] and the cope depth taken as zero (AISC-Handbuch Gl. 9-15):
[math] C_{b} = \left[ 3 + \ln\left( \frac{L_{b,sp}}{h_{sp}} \right) \right] \left( 1 – \frac{d_{c,sp}}{h_{sp}} \right) \ge 1.84 = \left[ 3 + \ln\left( \frac{(2.25\,in)}{(12\,in)} \right) \right] \times (1 – 0) \ge 1.84 = 1.84 [math]
[math] \phi M_{n} = \phi \left[ C_{b} \left[ 1.52 – 0.274 \left( \frac{L_{b} d}{t^{2}} \right) \left( \frac{F_{y}}{E} \right) \right] F_{y} S \le F_{y} Z \right] = (0.9) \times \left[ (1.84) \times \left[ 1.52 – 0.274 \times (192) \times \frac{(36\,ksi)}{(29000\,ksi)} \right] \times (36\,ksi) \times (9\,in^{3}) \le (36\,ksi) \times (13.5\,in^{3}) \right] = 36.45\,kip{\cdot}ft [math]
[math] \phi V_{n,y} = \frac{\phi M_{n}}{L_{b,sp}} = \frac{(36.45\,kip{\cdot}ft)}{(2.25\,in)} = 194.4\,kip [math]
Flexural rupture uses the net plastic modulus through the holes (AISC-Handbuchtabelle 15-3):
[math] Z_{net} = \frac{t\, h^{2}}{4} – t \left( d_{h} + 0.0625\,in \right) s_{r} \left\lfloor \frac{n_{r}^{2}}{4} \right\rfloor – \left[ n_{r}\ \text{odd} \right] \frac{t \left( d_{h} + 0.0625\,in \right)^{2}}{4} = 8.1563\,in^{3} [math]
[math] \phi M_{n} = \phi\, F_{u}\, Z_{net} = (0.75) \times (58\,ksi) \times (8.1563\,in^{3}) = 29.566\,kip{\cdot}ft \qquad \phi V_{n,r} = \frac{(29.566\,kip{\cdot}ft)}{(2.25\,in)} = 157.69\,kip [math]
DCR = 43.841 kip / 157.69 kip = 0.278 < 1.0, in Ordnung
The plate is short and deep, so lateral-torsional buckling does not reduce it. The F11-2 value is capped at the plastic moment [mathin] F_{y} Z [mathin].
Schritt 25: Gusset single plate in tension, with interaction (AISC 360-16 J4.1, H1)
When the brace pulls, [mathin] H_{c} [mathin] puts the plate in tension.
[math] \phi R_{n,ty} = (0.9) \times (36\,ksi) \times (0.375\,in) \times (12\,in) = 145.8\,kip [math]
[math] \phi R_{n,tr} = (0.75) \times (58\,ksi) \times (0.375\,in) \times \left[ (12\,in) – (4) \times (1.1875\,in) \right] = 118.27\,kip [math]
DCR = 18.321 kip / 118.27 kip = 0.155 < 1.0, in Ordnung
The plate carries tension, bending and shear at the same time. Since the axial ratio is below 0.2, the report uses the AISC H1-1b form for axial plus flexure, then adds the squared shear ratio:
[math] \left( \frac{H_{c}}{2\, \phi R_{n}} + \frac{V_{c}}{\phi V_{n}} \right)^{2} + \left( \frac{V_{c}}{\phi R_{n,v}} \right)^{2} = \left( \frac{(18.321\,kip)}{2 \times (118.27\,kip)} + \frac{(43.841\,kip)}{(194.4\,kip)} \right)^{2} + \left( \frac{(43.841\,kip)}{(70.959\,kip)} \right)^{2} = 0.47351 [math]
DCR = 0.474 < 1.0, in Ordnung
The flexure term uses the 194.4 kip from flexural yielding, not the 157.69 kip from rupture that governed Step 24.
Schritt 26: Gusset single plate in compression, with interaction (AISC 360-16 J4.4, H1)
When the brace pushes, the plate is in compression. Mit [mathin] K = 1.2 [mathin] und [mathin] L = 2.25\,in [mathin], [mathin] KL/r = 24.942 \le 25 [mathin], so it does not buckle and Eq. Es gilt J4-6:
[math] \phi R_{n} = \phi\, F_{y}\, t\, h_{sp} = (0.9) \times (36\,ksi) \times (0.375\,in) \times (12\,in) = 145.8\,kip [math]
DCR = 18.321 kip / 145.8 kip = 0.126 < 1.0, in Ordnung
[math] \left( \frac{(18.321\,kip)}{2 \times (145.8\,kip)} + \frac{(43.841\,kip)}{(194.4\,kip)} \right)^{2} + \left( \frac{(43.841\,kip)}{(70.959\,kip)} \right)^{2} = 0.46486 [math]
DCR = 0.465 < 1.0, in Ordnung
Schritt 27: Weld size at the gusset single plate (AISC-Handbuch Teil 10)
Two checks on weld size. The weld has to fit in the 0.75 in setback, and it has to be strong enough to develop the plate, so that the plate yields before the weld breaks. AISC-Handbuchseite 10-87 sets the second at 5/8 der Plattendicke:
[math] DCR_{clr} = \frac{(0.25)}{(0.75)} = 0.333 \qquad W_{duc} = \frac{5}{8}\, t_{sp} = \frac{5}{8} \times (0.375\,in) = 0.23438\,in [math]
DCR = 0.23438 im / 0.25 im = 0.938 < 1.0, in Ordnung
Schritt 28: Gusset single plate weld to the column (AISC 360-16 J2.4)
The plate is welded to the column flange on both faces. The weld carries the same resultant as the bolts, 47.515 kip at 22.681° from its axis.
[math] D_{max} = \frac{\frac{t_{sp}}{2} F_{u,sp} \le t_{f,c} F_{u,c}}{3.09\,kip/in} = \frac{(0.1875\,in) \times (58\,ksi) \le (0.71\,in) \times (65\,ksi)}{(3.09\,kip/in) \times (1)} = 3.5194 [math]
[math] L_{w} = 2 \left[ h_{sp} – 2W \right] = 2 \times \left[ (12\,in) – 2 \times (0.25\,in) \right] = 23\,in [math]
[math] \phi R_{n} = (0.75) \times 0.6 \times (70\,ksi) \times \frac{\sqrt{2}}{2} \times \left( (0.25\,in) \le \frac{(3.5194)}{(16)} \right) \times \left[ 1 + 0.5 \times (\sin(22.681^{\circ}))^{1.5} \right] \times (23\,in) = 126.18\,kip [math]
DCR = 47.515 kip / 126.18 kip = 0.377 < 1.0, in Ordnung
Mit der 3/8 in A36 plate limits the weld here: [mathin] 3.5194/16 = 0.22\,in [mathin], also nur 0.22 in of the 1/4 in Anzahl der Schweißnähte. A bigger weld would add nothing without a thicker plate.
Schritt 29: Column web under the gusset force (AISC 360-16 J10.3, J10.2)
[mathin] H_{c} [mathin] pushes or pulls on the column flange over the 12 im Teller. Mit [mathin] l_{b} = 12\,in [mathin]:
[math] \phi R_{n,wlc} = (0.75) \times 0.8 \times (0.44\,in)^{2} \times \left[ 1 + 3 \times \left( \frac{(12\,in)}{(14\,in)} \right) \times \left( \frac{(0.44\,in)}{(0.71\,in)} \right)^{1.5} \right] \times \sqrt{\frac{(29000\,ksi) \times (50\,ksi) \times (0.71\,in)}{(0.44\,in)}} \times (1) = 400.58\,kip [math]
[math] \phi R_{n,wly} = (1) \times (50\,ksi) \times (0.44\,in) \times \left( 5 \times (1.31\,in) + (12\,in) \right) = 408.1\,kip [math]
DCR = 18.321 kip / 400.58 kip = 0.046 < 1.0, in Ordnung
Schritt 30: Detailing limits of the beam single plate (AISC 360-16 J3.3, J3.4, J3.5)
The beam connection is a 1/2 in single plate with two bolt lines of five, welded to the column flange. Die Platte hat horizontale kurze Schlitze, and the beam web has standard holes. Its layout is in the single plate detail under Step 16.
| Detaillierungslimit | Limit (im) | Tatsächlich (im) | DCR | Ergebnis |
|---|---|---|---|---|
| Mindestabstand der Schraubenreihen | 2.667 | 3.000 | 0.889 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Maximaler Schraubenreihenabstand | 6.000 | 3.000 | 0.500 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Mindestabstand der Bolzensäulen | 2.667 | 3.000 | 0.889 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Maximaler Schraubenspaltenabstand | 6.000 | 3.000 | 0.500 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimaler vertikaler Randabstand der Platte | 1.250 | 1.500 | 0.833 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimaler horizontaler Randabstand der Platte (HSSL) | 1.375 | 1.500 | 0.917 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam web minimum horizontal edge distance | 1.250 | 1.500 | 0.833 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimum plate depth | 7.750 | 15.000 | 0.517 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Maximum plate depth | 16.000 | 15.000 | 0.938 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
The plate depth limits keep the plate between the beam fillets. The maximum is about the beam depth less [mathin] 2 k_{des} [mathin], and the minimum is half the web’s T dimension (AISC-Handbuch Teil 10).
DCR = 15 / 16 = 0.938 < 1.0, in Ordnung
Schritt 31: Beam-to-column bolt group (AISC 360-16 J3.8, AISC-Handbuch Teil 7)
The ten bolts carry the beam shear and the 150.32 kip axial force together, at an eccentricity from the weld. This is the most heavily loaded part of the connection.
[math] R = \sqrt{V_{total}^{2} + T_{total}^{2}} = \sqrt{(38\,kip)^{2} + (150.32\,kip)^{2}} = 155.05\,kip \qquad \theta = \tan^{-1}\left( \frac{150.32}{38} \right) = 75.813^{\circ} [math]
The eccentricity is [mathin] e = 3.75\,in [mathin], from the weld to the centroid of the two bolt lines. With bolts at x = 0 und 3 in and y = 0, 3, 6, 9 und 12 im, the instantaneous center is at [mathin] x_{ic} = -0.42058\,in [mathin], [mathin] y_{ic} = 14.882\,in [mathin], geben [mathin] C = 8.63 [mathin] und [mathin] C’ = 38.669\,in [mathin]:
[math] \phi R_{n} = \phi\, \mu\, D_{u}\, h_{f}\, T_{b}\, N_{s}\, C = (0.85) \times (0.3) \times (1.13) \times (1) \times (64\,kip) \times (1) \times (8.63) = 159.15\,kip [math]
DCR = 155.05 kip / 159.15 kip = 0.974 < 1.0, in Ordnung
Dies ist die maßgebliche Prüfung der gesamten Verbindung. The load is mostly axial, at 75.8° from vertical, so it runs along the horizontal slots, and that is why φ = 0.85 applies here. The resultant is far from the bolt group’s centroid line, but because it is nearly axial the eccentricity costs little: C = 8.63 out of 10 Schrauben.
Schritt 32: Ductility of the beam single plate (AISC-Handbuch Teil 10)
Mit [mathin] C’ = 38.669\,in [mathin], [mathin] F_{y} = 50\,ksi [mathin] und [mathin] h = 15\,in [mathin]:
[math] M_{max} = \frac{(68\,ksi)}{0.90} \times \frac{\pi \times (1\,in)^{2}}{4} \times (38.669\,in) = 191.22\,kip{\cdot}ft \qquad t_{max} = \frac{6 \times (191.22\,kip{\cdot}ft)}{(50\,ksi) \times (15\,in)^{2}} = 1.2238\,in [math]
DCR = 0.5 im / 1.2238 im = 0.409 < 1.0, in Ordnung
Schritt 33: Bolt bearing on the beam single plate (AISC 360-16 J3.10)
Vertikal (Schub-) Richtung
With standard vertical hole size, [mathin] l_{c1} = 0.9375\,in [mathin], [mathin] l_{c2} = 1.875\,in [mathin], [mathin] t = 0.5\,in [mathin], [mathin] F_{u} = 65\,ksi [mathin] und [mathin] n_{r} = 5 [mathin]:
[math] \phi R_{n,v} = (0.75) \times \left[ \min\left(1.125,\, 2.4\right) \times (0.5\,in) \times (65\,ksi) + \min\left(2.25,\, 2.4\right) \times (0.5\,in) \times (65\,ksi) \times ((5) – 1) \right] \times \frac{(8.63)}{(5)} = 425.97\,kip [math]
DCR = 38 kip / 425.97 kip = 0.089 < 1.0, in Ordnung
Horizontal (axial) Richtung
Across the slots, [mathin] l_{c1} = 1.5 – 1.3125/2 = 0.84375\,in [mathin] und [mathin] l_{c2} = 3 – 1.3125 = 1.6875\,in [mathin], mit [mathin] n_{c} = 2 [mathin]:
[math] \phi R_{n,a} = (0.75) \times \left[ \min\left(1.0125,\, 2.4\right) \times (0.5\,in) \times (65\,ksi) + \min\left(2.025,\, 2.4\right) \times (0.5\,in) \times (65\,ksi) \times ((2) – 1) \right] \times \frac{(8.63)}{(2)} = 319.48\,kip [math]
DCR = 150.32 kip / 319.48 kip = 0.471 < 1.0, in Ordnung
Interaction
[math] \left( \frac{(38\,kip)}{(425.97\,kip)} \right)^{2} + \left( \frac{(150.32\,kip)}{(319.48\,kip)} \right)^{2} = 0.22935 [math]
DCR = 0.229 < 1.0, in Ordnung
Schritt 34: Bolt bearing on the beam web (AISC 360-16 J3.10)
Vertikal (Schub-) Richtung
The web continues above and below the bolts, so no bolt has an edge in front of it vertically. Every bolt uses the clear distance between holes, [mathin] l_{c2} = 1.875\,in [mathin]:
[math] \phi R_{n,v} = \phi \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{w} F_{u}\, C = (0.75) \times \min\left(2.25,\, 2.4\right) \times (0.355\,in) \times (65\,ksi) \times (8.63) = 336.04\,kip [math]
DCR = 38 kip / 336.04 kip = 0.113 < 1.0, in Ordnung
Horizontal (axial) Richtung
When the beam is in tension the bolts bear toward the beam’s end, 1.5 in away, Also [mathin] l_{c1} = 0.9375\,in [mathin]:
[math] \phi R_{n,a} = (0.75) \times \left[ \min\left(1.125,\, 2.4\right) \times (0.355\,in) \times (65\,ksi) + \min\left(2.25,\, 2.4\right) \times (0.355\,in) \times (65\,ksi) \times ((2) – 1) \right] \times \frac{(8.63)}{(2)} = 252.03\,kip [math]
DCR = 150.32 kip / 252.03 kip = 0.596 < 1.0, in Ordnung
Interaction
[math] \left( \frac{(38\,kip)}{(336.04\,kip)} \right)^{2} + \left( \frac{(150.32\,kip)}{(252.03\,kip)} \right)^{2} = 0.36852 [math]
DCR = 0.369 < 1.0, in Ordnung
Schritt 35: Block shear of the beam single plate (AISC 360-16 J4.3)
Vertikal (Schub-) Richtung
An L-shaped block down the outer bolt line, with tension across both bolt lines through the slots:
[math] A_{nt} = t \left[ (n_{c}-1)\, s_{c} + L_{eh} – (n_{c} – 0.5) \left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ (3\,in) + (1.5\,in) – 1.5 \times ((1.3125\,in) + (0.0625\,in)) \right] = 1.2188\,in^{2} [math]
[math] A_{gv} = (0.5\,in) \times \left[ (1.5\,in) + 4 \times (3\,in) \right] = 6.75\,in^{2} \qquad A_{nv} = (0.5\,in) \times \left[ (15\,in) – (1.5\,in) – 4.5 \times (1.1875\,in) \right] = 4.0781\,in^{2} [math]
The report uses [mathin] U_{bs} = 0.5 [mathin] Hier. With two bolt lines, the line nearer the edge takes more of the tension than the other, so the stress on the tension plane is not uniform. Der AISC 360-16 Commentary to J4.3 gives 0.5 for that case.
[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (4.0781\,in^{2}) + (0.5) \times (65\,ksi) \times (1.2188\,in^{2}) \le 0.6 \times (50\,ksi) \times (6.75\,in^{2}) + (0.5) \times (65\,ksi) \times (1.2188\,in^{2}) \right) = 148.99\,kip [math]
DCR = 38 kip / 148.99 kip = 0.255 < 1.0, in Ordnung
Horizontal (axial) Richtung
The L pattern tears in tension along the outer line of five bolts and shears across to the plate’s end. The shear length is the plate width less its unbraced length, [mathin] 6.75 – 2.25 = 4.5\,in [mathin]:
[math] A_{nt} = (0.5\,in) \times \left[ 4 \times (3\,in) + (1.5\,in) – 4.5 \times (1.1875\,in) \right] = 4.0781\,in^{2} \quad A_{gv} = (0.5\,in) \times \left[ (1.5\,in) + (3\,in) \right] = 2.25\,in^{2} [math]
[math] A_{nv} = (0.5\,in) \times \left[ (6.75\,in) – (2.25\,in) – 1.5 \times ((1.3125\,in) + (0.0625\,in)) \right] = 1.2188\,in^{2} [math]
[math] \phi R_{n,L} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (1.2188\,in^{2}) + (1) \times (65\,ksi) \times (4.0781\,in^{2}) \le 0.6 \times (50\,ksi) \times (2.25\,in^{2}) + (1) \times (65\,ksi) \times (4.0781\,in^{2}) \right) = 234.46\,kip [math]
The U pattern tears between the outer rows and shears out at top and bottom:
[math] A_{nt} = (0.5\,in) \times \left[ 4 \times (3\,in) – 4 \times (1.1875\,in) \right] = 3.625\,in^{2} \quad A_{gv} = 2 \times (0.5\,in) \times \left[ (1.5\,in) + (3\,in) \right] = 4.5\,in^{2} \quad A_{nv} = 2.4375\,in^{2} [math]
[math] \phi R_{n,U} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (2.4375\,in^{2}) + (1) \times (65\,ksi) \times (3.625\,in^{2}) \le 0.6 \times (50\,ksi) \times (4.5\,in^{2}) + (1) \times (65\,ksi) \times (3.625\,in^{2}) \right) = 248.02\,kip [math]
DCR = 150.32 kip / 234.46 kip = 0.641 < 1.0, in Ordnung
Interaction
[math] \left( \frac{(38\,kip)}{(148.99\,kip)} \right)^{2} + \left( \frac{(150.32\,kip)}{(234.46\,kip)} \right)^{2} = 0.47612 [math]
DCR = 0.476 < 1.0, in Ordnung
Schritt 36: Block shear of the beam web under axial load (AISC 360-16 J4.3)
When the beam is pulled away from the column, a block of the web can tear out around the bolts: tension between the top and bottom rows, and shear along the top and bottom rows to the end of the beam. This is a C (or U) Muster.
[math] A_{nt} = t_{w} \left[ (n_{r}-1)\, s_{r} – (n_{r} – 1) \left( d_{h} + 0.0625\,in \right) \right] = (0.355\,in) \times \left[ 4 \times (3\,in) – 4 \times ((1.125\,in) + (0.0625\,in)) \right] = 2.5737\,in^{2} [math]
[math] A_{gv} = 2\, t_{w} \left[ L_{eh} + (n_{c}-1)\, s_{c} \right] = 2 \times (0.355\,in) \times \left[ (1.5\,in) + (3\,in) \right] = 3.195\,in^{2} [math]
[math] A_{nv} = 2\, t_{w} \left[ (n_{c}-1)\, s_{c} + L_{eh} – (n_{c} – 0.5) \left( d_{h} + 0.0625\,in \right) \right] = 2 \times (0.355\,in) \times \left[ (3\,in) + (1.5\,in) – 1.5 \times (1.1875\,in) \right] = 1.9303\,in^{2} [math]
[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (1.9303\,in^{2}) + (1) \times (65\,ksi) \times (2.5737\,in^{2}) \le 0.6 \times (50\,ksi) \times (3.195\,in^{2}) + (1) \times (65\,ksi) \times (2.5737\,in^{2}) \right) = 181.93\,kip [math]
DCR = 150.32 kip / 181.93 kip = 0.826 < 1.0, in Ordnung
This is the second-highest check in the connection. The thin 0.355 im Web, not the 1/2 im Teller, is the weak part in axial block shear.
Schritt 37: Beam single plate in shear (AISC 360-16 J4.2)
[math] \phi R_{n,sy} = (1) \times 0.6 \times (50\,ksi) \times (15\,in \times 0.5\,in) = 225\,kip [math]
[math] \phi R_{n,sr} = (0.75) \times 0.6 \times (65\,ksi) \times (0.5\,in) \times \left[ (15\,in) – (5) \times (1.1875\,in) \right] = 132.54\,kip [math]
DCR = 38 kip / 132.54 kip = 0.287 < 1.0, in Ordnung
Schritt 38: Beam single plate in flexure (AISC-Handbuch Teil 9, AISC 360-16 F11)
As in Step 24, mit [mathin] L_{b,sp} = 2.25\,in [mathin], [mathin] h = 15\,in [mathin] und [mathin] t = 0.5\,in [mathin]. Hier [mathin] L_{b} d / t^{2} = 135 [mathin], between 46.4 und 1102, so F11-2 applies with [mathin] Z = 28.125\,in^{3} [mathin], [mathin] S = 18.75\,in^{3} [mathin] und [mathin] C_{b} = 1.84 [mathin]:
[math] \phi M_{n} = (0.9) \times \left[ (1.84) \times \left[ 1.52 – 0.274 \times (135) \times \frac{(50\,ksi)}{(29000\,ksi)} \right] \times (50\,ksi) \times (18.75\,in^{3}) \le (50\,ksi) \times (28.125\,in^{3}) \right] = 105.47\,kip{\cdot}ft \qquad \phi V_{n,y} = \frac{(105.47\,kip{\cdot}ft)}{(2.25\,in)} = 562.5\,kip [math]
[math] Z_{net} = \frac{(0.5\,in) \times (15\,in)^{2}}{4} – (0.5\,in) \times (1.1875\,in) \times (3\,in) \times \left\lfloor \frac{5^{2}}{4} \right\rfloor – \frac{(0.5\,in) \times (1.1875\,in)^{2}}{4} = 17.261\,in^{3} [math]
[math] \phi M_{n} = (0.75) \times (65\,ksi) \times (17.261\,in^{3}) = 70.124\,kip{\cdot}ft \qquad \phi V_{n,r} = \frac{(70.124\,kip{\cdot}ft)}{(2.25\,in)} = 373.99\,kip [math]
DCR = 38 kip / 373.99 kip = 0.102 < 1.0, in Ordnung
Schritt 39: Beam single plate in tension, with interaction (AISC 360-16 J4.1, H1)
[math] \phi R_{n,ty} = (0.9) \times (50\,ksi) \times (0.5\,in) \times (15\,in) = 337.5\,kip [math]
[math] \phi R_{n,tr} = (0.75) \times (65\,ksi) \times (0.5\,in) \times \left[ (15\,in) – (5) \times (1.1875\,in) \right] = 220.9\,kip [math]
DCR = 150.32 kip / 220.9 kip = 0.681 < 1.0, in Ordnung
The axial ratio is 0.68, über 0.2, so the interaction switches to the H1-1a form with 8/9 on the flexure term:
[math] \left( \frac{T_{total}}{\phi R_{n}} + \frac{8\, V_{total}}{9\, \phi V_{n}} \right)^{2} + \left( \frac{V_{total}}{\phi R_{n,v}} \right)^{2} = \left( \frac{(150.32\,kip)}{(220.9\,kip)} + \frac{8 \times (38\,kip)}{9 \times (562.5\,kip)} \right)^{2} + \left( \frac{(38\,kip)}{(132.54\,kip)} \right)^{2} = 0.63062 [math]
DCR = 0.631 < 1.0, in Ordnung
As on the gusset side, the flexure term uses the yield-based 562.5 kip rather than the 373.99 kip from rupture.
Schritt 40: Beam single plate in compression, with interaction (AISC 360-16 J4.4, H1)
Mit [mathin] K = 1.2 [mathin] und [mathin] L = 2.25\,in [mathin], [mathin] KL/r = 18.706 \le 25 [mathin], also Gl. Es gilt J4-6:
[math] \phi R_{n} = (0.9) \times (50\,ksi) \times (0.5\,in) \times (15\,in) = 337.5\,kip [math]
DCR = 150.32 kip / 337.5 kip = 0.445 < 1.0, in Ordnung
[math] \left( \frac{(150.32\,kip)}{(337.5\,kip)} + \frac{8 \times (38\,kip)}{9 \times (562.5\,kip)} \right)^{2} + \left( \frac{(38\,kip)}{(132.54\,kip)} \right)^{2} = 0.33768 [math]
DCR = 0.338 < 1.0, in Ordnung
Schritt 41: Beam in tension rupture (AISC 360-16 D3, J4.1)
When the beam is pulled, only its web is bolted, so the flanges have to shed their share of the force into the web. Treating the half section either side of the web as a channel (Tabelle D3.1, Fall 2), [mathin] \bar{x} = 1.1395\,in [mathin] over a connection length of 3 in gives [mathin] U = 0.62033 [mathin]:
[math] \phi R_{n} = \phi\, F_{u}\, U \left[ A_{bm} – n_{r} \left( d_{h} + 0.0625\,in \right) t_{w} \right] = (0.75) \times (65\,ksi) \times (0.62033) \times \left[ (14.7\,in^{2}) – (5) \times (1.1875\,in) \times (0.355\,in) \right] = 380.8\,kip [math]
DCR = 150.32 kip / 380.8 kip = 0.395 < 1.0, in Ordnung
Schritt 42: Weld size at the beam single plate (AISC-Handbuch Teil 10)
[math] DCR_{clr} = \frac{(0.3125)}{(0.75)} = 0.417 \qquad W_{duc} = \frac{5}{8} \times (0.5\,in) = 0.3125\,in [math]
DCR = 0.3125 im / 0.3125 im = 1.000, in Ordnung
Mit der 5/16 in weld is exactly the size needed to develop the 1/2 im Teller. Any smaller and the weld could fail before the plate yields.
Schritt 43: Beam single plate weld to the column (AISC 360-16 J2.4)
[math] D_{max} = \frac{(0.25\,in) \times (65\,ksi) \le (0.71\,in) \times (65\,ksi)}{(3.09\,kip/in) \times (1)} = 5.2589 \qquad L_{w} = 2 \times \left[ (15\,in) – 2 \times (0.3125\,in) \right] = 28.75\,in [math]
[math] \phi R_{n} = (0.75) \times 0.6 \times (70\,ksi) \times \frac{\sqrt{2}}{2} \times \left( (0.3125\,in) \le \frac{(5.2589)}{(16)} \right) \times \left[ 1 + 0.5 \times (\sin(75.813^{\circ}))^{1.5} \right] \times (28.75\,in) = 295.63\,kip [math]
DCR = 155.05 kip / 295.63 kip = 0.524 < 1.0, in Ordnung
The load is nearly perpendicular to the weld, so the directional factor adds about 48% to the weld strength.
Schritt 44: Column web under the beam axial force (AISC 360-16 J10.3, J10.2)
Mit der 150.32 kip axial force acts on the column flange over the 15 im Teller, mit [mathin] l_{b} = 15\,in [mathin]:
[math] \phi R_{n,wlc} = (0.75) \times 0.8 \times (0.44\,in)^{2} \times \left[ 1 + 3 \times \left( \frac{(15\,in)}{(14\,in)} \right) \times \left( \frac{(0.44\,in)}{(0.71\,in)} \right)^{1.5} \right] \times \sqrt{\frac{(29000\,ksi) \times (50\,ksi) \times (0.71\,in)}{(0.44\,in)}} \times (1) = 456.31\,kip [math]
[math] \phi R_{n,wly} = (1) \times (50\,ksi) \times (0.44\,in) \times \left( 5 \times (1.31\,in) + (15\,in) \right) = 474.1\,kip [math]
DCR = 150.32 kip / 456.31 kip = 0.329 < 1.0, in Ordnung
Zusammenfassung der Schecks
The brace-side and gusset results are the same for the upper and lower braces.
| Design-Check | Nachfrage | Die SkyCiv Foundation umfasst das Design von isolierten Fundamenten, die den australischen Standards¹ entsprechen | DCR | Ergebnis |
|---|---|---|---|---|
| Brace bolts: Detaillierung | 1.375 im | 1.500 im | 0.917 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Brace bolts: slip | 62 kip | 110.65 kip | 0.560 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset bearing at the brace | 62 kip | 127.97 kip | 0.484 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Brace bearing | 62 kip | 244.69 kip | 0.253 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset block shear at the brace | 62 kip | 94.453 kip | 0.656 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Brace block shear | 62 kip | 179.44 kip | 0.346 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset tension (Whitmore) | 62 kip | 136.88 kip | 0.453 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Spannungsriss der Zahnspange | 62 kip | 278.71 kip | 0.222 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset compression | 62 kip | 103.52 kip | 0.599 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Minimum weld at the beam | 0.188 im | 0.188 im | 1.000 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset-to-beam weld | 82.354 kip | 182.25 kip | 0.452 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset shear yield at the beam | 25.519 kip | 232.5 kip | 0.110 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset tension yield at the beam | 59.27 kip | 348.75 kip | 0.170 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam web under the gusset | 30.37 kip | 100.85 kip | 0.301 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset single plate: Detaillierung | 1.375 im | 1.500 im | 0.917 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset-to-column bolt group | 47.515 kip | 57.907 kip | 0.821 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset single plate ductility | 0.375 im | 0.773 im | 0.485 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset single plate bearing (Schub- / axial / interaction) | 0.435 / 0.353 / 0.314 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Gusset bearing at the column (Schub- / axial / interaction) | 0.250 / 0.213 / 0.108 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Gusset single plate block shear (Schub- / axial / interaction) | 0.582 / 0.175 / 0.369 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Gusset block shear at the column (Schub- / axial / interaction) | 0.317 / 0.117 / 0.114 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Gusset single plate shear | 43.841 kip | 70.959 kip | 0.618 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset single plate flexure | 43.841 kip | 157.69 kip | 0.278 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset single plate tension / interaction | 18.321 kip | 118.27 kip | 0.155 / 0.474 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset single plate compression / interaction | 18.321 kip | 145.8 kip | 0.126 / 0.465 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Gusset single plate weld clearance / develops plate | 0.333 / 0.938 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Gusset single plate weld to column | 47.515 kip | 126.18 kip | 0.377 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Column web under the gusset | 18.321 kip | 400.58 kip | 0.046 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate: Detaillierung | 15 im | 16 im | 0.938 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam-to-column bolt group | 155.05 kip | 159.15 kip | 0.974 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate ductility | 0.5 im | 1.224 im | 0.409 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate bearing (Schub- / axial / interaction) | 0.089 / 0.471 / 0.229 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Beam web bearing (Schub- / axial / interaction) | 0.113 / 0.596 / 0.369 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Beam single plate block shear (Schub- / axial / interaction) | 0.255 / 0.641 / 0.476 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Beam web block shear, axial | 150.32 kip | 181.93 kip | 0.826 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate shear | 38 kip | 132.54 kip | 0.287 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate flexure | 38 kip | 373.99 kip | 0.102 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate tension / interaction | 150.32 kip | 220.9 kip | 0.681 / 0.631 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate compression / interaction | 150.32 kip | 337.5 kip | 0.445 / 0.338 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam tension rupture | 150.32 kip | 380.8 kip | 0.395 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Beam single plate weld clearance / develops plate | 0.417 / 1.000 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des | ||
| Beam single plate weld to column | 155.05 kip | 295.63 kip | 0.524 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
| Column web under the beam axial force | 150.32 kip | 456.31 kip | 0.329 | Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des |
The connection passes every check of this vertical brace connection design. The beam-to-column bolt group governs at 0.974, weil die 132 kip transfer force plus the 18.321 kip that each gusset sends to the column all pass through those ten bolts. The beam web in axial block shear is next at 0.826. On the brace side, the gusset single plate bolts are highest at 0.821. The two ratios of 1.000 are size rules: the gusset weld is exactly the Table J2.4 minimum, and the beam plate weld is exactly 5/8 der Plattendicke.
Was ist zu ändern, wenn eine Prüfung fehlschlägt?
- Beam-to-column bolt group: Fügen Sie eine Schraubenreihe hinzu, use a Class B surface (μ = 0.5 anstatt 0.3), or use standard holes in the plate where the erection tolerance allows, which raises φ to 1.00.
- Beam web block shear: add bolt rows to lengthen the tension plane, or increase the edge distance at the beam end. A web doubler is the last resort.
- Gusset-to-column bolts: add a bolt row or lengthen the gusset on the column, which increases β and also lowers the share of force that goes to the column.
- Gusset-to-beam weld: lengthen the gusset along the beam, or use the general UFM case so that the beam-to-column connection carries Vb and the gusset weld loses most of its moment.
- Gusset buckling: use a thicker gusset or move the brace closer to the work point to shorten the 9 in unbraced length.
- Block shear and bearing at the brace: Fügen Sie eine Schraubenreihe hinzu, increase the end distance, oder Standardlöcher im Zwickel verwenden.
- Single plate checks: a thicker plate helps bearing, Blockschere, shear and tension, but it has to stay under the ductility limit and the weld has to grow to 5/8 of its thickness.
- Spaltennetz: add a pair of stiffeners opposite the beam single plate.
Häufig gestellte Fragen
What is the Uniform Force Method?
The Uniform Force Method (AISC-Handbuch Teil 13) splits a brace force between the gusset-to-beam and gusset-to-column interfaces so that neither interface carries a moment. It does this by choosing the gusset’s centroids α and β to satisfy α − β tan θ = eb tan θ − ec. The beam-to-column connection then carries whatever horizontal force goes to the column, plus any vertical force at the beam interface.
Why is the vertical force at the beam interface zero?
The report uses Special Case 2 of the Uniform Force Method. It moves the whole vertical force the beam interface would get, 23.556 kip, to the gusset-to-column interface. That keeps the brace’s vertical force out of the beam-to-column connection. The cost is a moment on the gusset-to-beam interface of 23.556 kip × 9.75 im = 19.139 kip-ft, which the weld and the gusset edge are checked for in Steps 12 zu 15.
Why does the beam-to-column connection carry 150.32 kip?
The beam has its own 132 kip transfer force. Obendrein, each gusset sends Hc = 18.321 kip of horizontal force directly into the column, and the beam has to deliver it back through the beam-to-column connection. The two gussets are on opposite sides of the beam with the same force, so the report adds the larger one, 18.321 kip, geben 150.32 kip.
Why are all the bolts slip-critical?
The gusset has oversized holes at the brace, and both single plates have horizontal short slots. Those holes give the erector room to fit up a braced bay, but AISC 360-16 J3.2 allows them only in slip-critical joints, or for slots, only when the load is perpendicular to the slot. Brace forces also reverse, so a joint that does not slip back and forth performs better.
Why does the beam single plate use Ubs = 0.5 in block shear?
With two bolt lines, the line nearer the edge carries more of the load, so the tension stress on the block is not uniform. Der AISC 360-16 Commentary to J4.3 recommends Ubs = 0.5 for that case, which is what the report uses for the vertical block. In the axial direction the tension plane runs along a full bolt line, the stress is uniform, and Ubs = 1.
Why do the two single plates use different interaction equations?
Both follow AISC 360-16 H1. When the axial ratio is below 0.2, Gl. H1-1b halves the axial term. When it is 0.2 or more, Gl. H1-1a takes the axial term in full and multiplies the flexure term by 8/9. The gusset single plate has an axial ratio of 0.155, so it uses H1-1b. The beam single plate has 0.68, so it uses H1-1a. In both cases the squared shear ratio is added.
Wie würde sich dies für AISC ASD anstelle von LRFD ändern??
The limit states and nominal strengths are the same. With AISC ASD you compare service-level forces against the nominal strength divided by a safety factor. Ein Widerstandsfaktor von 0.75 wird zum Sicherheitsfaktor von 2.00, 0.90 wird 1.67, and slip with oversized or slotted holes goes from 0.85 zu 1.76. The Uniform Force Method distribution is identical, scaled to the ASD brace force.
Design a vertical brace connection for free
Jede Zahl auf dieser Seite stammt aus einer Lösung. Pick the vertical bracing configuration, Geben Sie Ihre Spalte ein, Trägers, Hosenträger, gussets, Schrauben, welds and forces, und sehen Sie sich jede dieser Prüfungen in Ihrem Browser an. Es gibt nichts zu installieren.
Das SkyCiv Connection Design-Modul ist die Verbindungsdesign-Software hinter diesem Beispiel. Sie erhalten den vollständigen Berechnungsbericht mit jeder Gleichung und Ihren darin enthaltenen Zahlen, wie die Schritte oben, plus jede Kapazität und DCR, für AISC 360-16 (LRFD und ASD) und 4100:2020. Mit der Schraubenrechner und Schweißrechner decken die Schraubengruppe und die Schweißnahtprüfungen selbstständig ab.
Verweise
- AISC 360-16, Spezifikation für Baustahlgebäude: B4.3, D3 (Tabelle D3.1 Fall 2), E3 (Gl. E3-2, E3-4), F11.2 (Gl. F11-2), H1 (Gl. H1-1a, H1-1b), J2.2b (Tabelle J2.4), J2.4 (Gl. J2-4), J3.2, J3.3, J3.4 (Tabelle J3.4), J3.5 (Tabelle J3.5), J3.8 (Gl. J3-4, Tabelle J3.1), J3.10 (Gl. J3-6a, J3-6c), J4.1 (Gl. J4-1, J4-2), J4.2 (Gl. J4-3, J4-4), J4.3 (Gl. J4-5), J4.4 (Gl. J4-6), J10.2 (Gl. J10-2, J10-3), J10.3 (Gl. J10-4, J10-5b).
- AISC-Stahlkonstruktionshandbuch, 15th Ausgabe: Teil 7 (instantaneous center of rotation), Teil 9 (Feige. 9-1 Whitmore-Abschnitt, Gl. 9-2, Gl. 9-4, Gl. 9-15), Teil 10 (single plate ductility Eq. 10-3 und 10-4, weld to develop the plate p. 10-87), Teil 13 (Uniform Force Method, Special Case 2, Duktilitätsfaktor der Schweißnaht), Teil 15 (Tabelle 15-3).
- AISC-Designhandbuch 29, Vertikale Aussteifungsverbindungen: Beispiel 5.3.
- Entwurf von Stahlverbindungen mit AISC 360-16
- Schrauben und Schweißnähte im SkyCiv Connection Design
Harold Munalem
Produktmanager, Verbindungsdesign
10+ Jahre in der Konstruktion von Stahlverbindungen
LinkedIn