Horizontal brace connection design to AISC 360 follows the brace force through three load paths. Zuerst, the brace bolts deliver the force into the gusset. Then the gusset passes it to the two members it connects to, here a girder and a beam, through bolted single angles. Each load path gets its own checks: slip, Lager, block shear and tension at the brace; Schraubenscherung, Lager, Blockschere, shear and flexure at each single angle; and bending and buckling of the gusset itself.

Diese Seite ist von Anfang bis Ende ein echtes Beispiel. A W18x50 beam and a W21x44 girder meet at a W14x90 column, und ein 1/2 in gusset at the corner between them takes a 2L5x3-1/2×1/2 brace at 45°. The brace carries 52 kip in tension or compression (LRFD). The gusset is bolted to the web of each member through an L4x3x3/8 single angle. Das Design ist AISC 360-16 und das AISC-Handbuch, 15. Auflage. Jede Gleichung wird mit ihren Zahlen ausgeschrieben, in the same order as the calc sheet that the SkyCiv-Verbindungsdesign Modul erzeugt für diese Verbindung.

What is a horizontal brace connection?

A horizontal brace connection joins a diagonal brace in the plane of a floor or roof to the corner where two framing members meet. Horizontal bracing carries lateral load across a diaphragm that cannot do it alone, such as an open roof or a floor with large openings, and takes it to the vertical bracing. Because the brace lies flat in plan, the gusset is horizontal and is usually connected to the webs of the beams just below the top flange.

In this example the gusset sits in the corner between a W18x50 beam and a W21x44 girder at a W14x90 column. It is notched around the column, so it has two legs: one along the girder and one along the beam. Each leg is bolted to its member through a Einzelwinkelverbindung. The brace is a pair of 5×3-1/2×1/2 angles with their short legs back to back. Beide 5 in legs lie flat on the same face of the gusset, with one line of four bolts through each. The brace-to-gusset checks are close to those in a vertical bracing connection, but there is no Uniform Force Method here. The report resolves the brace force into its two components and sends each one to the member it runs along.

Horizontal brace connection design example plan view: 1/2 in der Klasse A572 50 gusset in the corner between a W18x50 beam and a W21x44 girder at a W14x90 column, taking a brace at 45 degrees with Tu = Cu = 52 kip, bolted to each member through a single angle

Plan view of the example connection. The gusset leg along the beam is 11 3/4 in long and the leg along the girder is 11 in long.

Horizontal brace connection design: Die Schritte auf einen Blick

  1. Überprüfen Sie die Detaillierungsgrenzen an den Strebenschrauben.
  2. Check the slip resistance of the brace bolts.
  3. Check bolt bearing and tear-out on the gusset at the brace.
  4. Bolzenlager und Ausriss an der Strebe prüfen.
  5. Check block shear of the gusset at the brace.
  6. Blockschub der Strebe prüfen.
  7. Check the gusset in tension on its Whitmore section.
  8. Prüfen Sie die Strebe auf Zugbruch mit Schubverzögerung.
  9. Check the detailing limits at the gusset side of the girder angle.
  10. Check the gusset-side bolt group of the girder angle in shear.
  11. Check bolt bearing on the girder angle, gusset side.
  12. Check bolt bearing on the gusset at the girder angle.
  13. Check the effective strength of the gusset-side bolts.
  14. Check block shear of the girder angle, gusset side.
  15. Check block shear of the gusset at the girder angle.
  16. Check the girder angle in shear.
  17. Check the gusset in shear along the girder angle.
  18. Check the girder angle in flexure, gusset side.
  19. Check shear and moment interaction of the girder angle, gusset side.
  20. Check the detailing limits at the girder.
  21. Check the bolt group to the girder by the instantaneous center of rotation.
  22. Check bolt bearing on the girder angle at the girder.
  23. Bolzenlager am Trägersteg prüfen.
  24. Check the effective strength of the bolts to the girder.
  25. Check block shear of the girder angle, girder side.
  26. Check the girder angle in shear, girder side.
  27. Check the girder angle in flexure, girder side.
  28. Check shear and moment interaction of the girder angle, girder side.
  29. Check the gusset in bending at the girder.
  30. Check the gusset in buckling at the girder.
  31. Repeat the bolt and angle checks at the beam.
  32. Check bolt bearing and block shear of the gusset at the beam angle.
  33. Check the gusset in shear along the beam angle.
  34. Check bolt bearing on the beam web.
  35. Check the gusset in bending at the beam.
  36. Check the gusset in buckling at the beam.

Designeingaben für dieses Beispiel

Der Designcode ist AISC 360-16 LRFD. Abschnittseigenschaften stammen aus dem AISC-Handbuch.

Artikel Symbol Wert
Brace force, Zug oder Druck [mathin] T_{u,br},\ C_{u,br} [mathin] 52 kip
Spalte B14x90, A992
Spaltentiefe / Bahndicke [mathin] d_{c},\ t_{w,c} [mathin] 14 im / 0.44 im
Breite des Stützenflansches / Dicke / Flächenmoment [mathin] b_{f,c},\ t_{f,c},\ A_{c} [mathin] 14.5 im / 0.71 im / 26.5 in²
Träger W21x44, A992
Trägertiefe / Bahndicke [mathin] d_{g},\ t_{w,g} [mathin] 20.7 im / 0.35 im
Trägerflanschbreite / Dicke / Flächenmoment [mathin] b_{f,g},\ t_{f,g},\ A_{g} [mathin] 6.5 im / 0.45 im / 13 in²
Strahl B18x50, A992
Strahltiefe / Bahndicke [mathin] d_{bm},\ t_{w,bm} [mathin] 18 im / 0.355 im
Breite des Trägerflansches / Dicke / Flächenmoment [mathin] b_{f,bm},\ t_{f,bm},\ A_{bm} [mathin] 7.5 im / 0.57 im / 14.7 in²
Beam clearance [mathin] clr [mathin] 0 im
Spalte, girder and beam yield / Zugspannung [mathin] F_{y},\ F_{u} [mathin] 50 KSI / 65 KSI
Befestigen 2L5x3-1/2×1/2-SLBB, A36
Bereich der Zahnspange (both angles) [mathin] A_{br} [mathin] 8 in²
Brace leg on the gusset / leg off the gusset / Dicke [mathin] L_{on},\ L_{off},\ t_{br} [mathin] 5 im / 3.5 im / 0.5 im
Brace slope from the beam [mathin] \theta_{br} [mathin] 45°
Länge ohne Verstrebung [mathin] L_{b,br} [mathin] 13 im
Klammerausbeute / Zugspannung [mathin] F_{y,br},\ F_{u,br} [mathin] 36 KSI / 58 KSI
Elastizitätsmodul [mathin] E [mathin] 29000 KSI

 

Horizontal brace connection single angle information: L4x3x3/8 A36 single angles with the short leg at the beam and at the girder, drei 3/4 in A325N-Schrauben bei 3 im Abstand, standard holes at the gusset and short slotted holes in the angle, with section cuts A-A and B-B

Single angle information. Each angle has its 4 in leg on the gusset and its 3 in leg on the member web, with three bolts at 3 in through each leg.

Artikel Symbol Wert
Knotenblech 1/2 im, Klasse A572 50
Zwickelstärke [mathin] t_{gp} [mathin] 0.5 im
Zwickelausbeute / Zugspannung [mathin] F_{y,gp},\ F_{u,gp} [mathin] 50 KSI / 65 KSI
Brace bolts 3/4 in A325-SC, Class A surface
Brace bolts: Reihen / Abstand [mathin] n_{r},\ s_{r} [mathin] 4 / 3 im
Brace bolts: Säulen / gage between the bolt lines [mathin] n_{c},\ g_{a} [mathin] 2 / 6 im
Brace bolts: end distance at the brace [mathin] L_{ev} [mathin] 1.5 im
Löcher in der Strebe / Zwickel Standard (STD) / übergroß (OVS)
Einzelne Winkel (beide) L4x3x3/8, A36, 9 in long
Angle leg on the gusset [mathin] L_{on,g} [mathin] 4 im
Gusset width / Länge / offset at the girder [mathin] b_{1},\ h_{1},\ o_{1} [mathin] 6.75 im / 11 im / 1 im
Gusset width / Länge / offset at the beam [mathin] b_{2},\ h_{2},\ o_{2} [mathin] 6.5 im / 11.75 im / 1 im
Angle bolts 3/4 in A325N
Angle bolts: Reihen / Abstand / Säulen [mathin] n_{r},\ s_{r},\ n_{c} [mathin] 3 / 3 im / 1
Gusset side: horizontal edge on the gusset / end distance on the angle [mathin] L_{eh,gp},\ L_{ev} [mathin] 1.5 im / 1.5 im
Gusset side: holes in the gusset / Winkel STD / horizontal short slots (HSSL)
Member side: angle gage / end distance [mathin] g_{a,to,sup},\ L_{ev} [mathin] 1.75 im / 1.5 im
Member side: holes in the member web / Winkel STD / STD

The A36 grade on the brace angles and the single angles is normal for those parts. The gusset has oversized holes at the brace, so those bolts must be slip critical (AISC 360-16 J3.2). The single angles have short slots on the gusset leg, perpendicular to the load, which J3.2 allows in a bearing-type joint, so the angle bolts are A325N.

Schritt 1: Detaillierungsgrenzen an den Strebenschrauben (AISC 360-16 J3.3, J3.4, J3.5)

The bolt layout has to be buildable and has to match the assumptions behind the strength equations. Bolts that are too close tear out between the holes, and bolts too close to an edge tear out to the edge.

Horizontal brace connection brace detail: 2L5x3-1/2x1/2-SLBB A36 brace with standard holes bolted to the gusset with 3/4 in A325-SC Class A bolts in oversized gusset holes, two lines of four bolts at 3 in with a 6 im Messgerät, 1 1/2 in end distance and a 13 in unbraced length

Detail der Strebenverbindung. Two lines of four bolts at 3 im, one line through each angle, mit einem 6 in gage between them.

Für ein 3/4 Im Bolzen beträgt der Mindestabstand [mathin] 2\tfrac{2}{3} d_{b} = 2\,in [mathin] (J3.3) und der minimale Randabstand beträgt 1 im (Tabelle J3.4). Der Zwickel hat übergroße Löcher, also die Tabelle J3.5 Inkrement von 1/16 in erhöht seinen minimalen Endabstand auf 1.063 im.

Detaillierungslimit Limit (im) Tatsächlich (im) DCR Ergebnis
Mindestbolzenstärke 3.375 6.000 0.563 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Mindestabstand der Schraubenreihen 2.000 3.000 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Maximaler Schraubenreihenabstand 6.000 3.000 0.500 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Mindestabstand der Bolzensäulen 2.000 3.000 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Maximaler Schraubenspaltenabstand 6.000 3.000 0.500 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset minimum vertical edge distance (OVS) 1.063 1.500 0.709 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Minimaler vertikaler Randabstand der Strebe 1.000 1.500 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Minimaler horizontaler Randabstand der Strebe 1.000 2.000 0.500 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des

Die maßgebende Reihe ist der Endabstand des Knotenblechs mit seinem übergroßen Lochabstand:

[math] DCR = \frac{d}{c} = \frac{(1.063)}{(1.5)} = 0.70867 [math]

DCR = 0.709 < 1.0, in Ordnung

Schritt 2: Slip resistance of the brace bolts (AISC 360-16 J3.8)

Der Zwickel hat übergroße Löcher, welche AISC 360-16 J3.2 allows only in slip-critical joints. The bolts are pretensioned, and friction between the brace angles and the gusset carries the brace force. Es wird geprüft, ob die Verbindung unter der berücksichtigten Belastung nicht verrutscht.

Wo [mathin] \phi = 0.85 [mathin] für übergroße Löcher, [mathin] \mu = 0.3 [mathin] for a Class A surface, [mathin] D_{u} = 1.13 [mathin], [mathin] h_{f} = 1 [mathin] weil es keine Füllstoffe gibt, [mathin] T_{b} = 28\,kip [mathin] für ein 3/4 in A325 bolt (Tabelle J3.1), [mathin] N_{s} = 1 [mathin], [mathin] n_{r} = 4 [mathin] und [mathin] n_{c} = 2 [mathin]:

[math] \phi R_{n} = \phi\, \mu\, D_{u}\, h_{f}\, T_{b}\, N_{s}\, n_{r}\, n_{c} [math]

[math] \phi R_{n} = (0.85) \times (0.3) \times (1.13) \times (1) \times (28\,kip) \times (1) \times (4) \times (2) [math]

[math] \phi R_{n} = 64.546\,kip [math]

DCR = 52 kip / 64.546 kip = 0.806 < 1.0, in Ordnung

There is one slip plane, not two, because both brace angles lie on the same face of the gusset. Each bolt clamps one angle leg to the gusset. That makes slip the governing check at the brace.

Schritt 3: Bolt bearing and tear-out on the gusset at the brace (AISC 360-16 J3.10)

Schlupfkritische Schrauben müssen weiterhin auf Lagerung geprüft werden, because if the joint does slip, the bolts bear on the sides of their holes. The bolt nearest the end of the gusset has the least material in front of it.

Das Zwickelloch ist überdimensioniert, [mathin] d_{h} = 0.9375\,in [mathin]. Clear distances for the end bolt and between bolts:

[math] l_{c1} = L_{ev} – \frac{d_{h}}{2} = (1.5\,in) – \frac{(0.9375\,in)}{2} = 1.0313\,in [math]

[math] l_{c2} = s_{r} – d_{h} = (3\,in) – (0.9375\,in) = 2.0625\,in [math]

Wo [mathin] t_{gp} = 0.5\,in [mathin], [mathin] F_{u,gp} = 65\,ksi [mathin], [mathin] n_{r} = 4 [mathin], [mathin] n_{c} = 2 [mathin], [mathin] d_{b} = 0.75\,in [mathin] und [mathin] \phi = 0.75 [mathin]:

[math] \phi R_{n} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t_{gp} F_{u,gp}\, n_{c} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{gp} F_{u,gp}\, n_{c} \left( n_{r} – 1 \right) \right] [math]

[math] \phi R_{n} = (0.75) \times \left[ \min\left(1.2 \times (1.0313\,in),\, 2.4 \times (0.75\,in)\right) \times (0.5\,in) \times (65\,ksi) \times (2) + \min\left(1.2 \times (2.0625\,in),\, 2.4 \times (0.75\,in)\right) \times (0.5\,in) \times (65\,ksi) \times (2) \times ((4) – 1) \right] [math]

[math] \phi R_{n} = 323.58\,kip [math]

DCR = 52 kip / 323.58 kip = 0.161 < 1.0, in Ordnung

Tear-out governs the end bolts. The inner bolts reach the bearing cap of 2.4 db.

Schritt 4: Bolzenlager und Ausreißer an der Strebe (AISC 360-16 J3.10)

The same check applies to the brace angles. Each bolt passes through one angle leg, so the bearing thickness is a single leg, [mathin] t_{br} = 0.5\,in [mathin].

The angles have standard holes, [mathin] d_{h} = 0.8125\,in [mathin]:

[math] l_{c1} = (1.5\,in) – \frac{(0.8125\,in)}{2} = 1.0938\,in \qquad l_{c2} = (3\,in) – (0.8125\,in) = 2.1875\,in [math]

Mit [mathin] F_{u,br} = 58\,ksi [mathin]:

[math] \phi R_{n} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t_{br} F_{u,br}\, n_{c} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{br} F_{u,br}\, n_{c} \left( n_{r} – 1 \right) \right] [math]

[math] \phi R_{n} = (0.75) \times \left[ \min\left(1.2 \times (1.0938\,in),\, 2.4 \times (0.75\,in)\right) \times (0.5\,in) \times (58\,ksi) \times (2) + \min\left(1.2 \times (2.1875\,in),\, 2.4 \times (0.75\,in)\right) \times (0.5\,in) \times (58\,ksi) \times (2) \times ((4) – 1) \right] [math]

[math] \phi R_{n} = 292\,kip [math]

DCR = 52 kip / 292 kip = 0.178 < 1.0, in Ordnung

Schritt 5: Block shear of the gusset at the brace (AISC 360-16 J4.3)

A block of the gusset can tear out around the bolts: shear along the bolt lines plus tension across the end. The report checks two shapes. The L pattern tears along one bolt line and across to the gusset edge. The U pattern tears along both bolt lines and across between them.

Mit der 1/16 in added to each hole is the B4.3 allowance for damage when the hole is punched. Mit [mathin] d_{h} = 0.9375\,in [mathin], [mathin] s_{c} = 3\,in [mathin], [mathin] g_{a} = 6\,in [mathin], [mathin] L_{eh,gp} = 2\,in [mathin] und [mathin] L_{br,gp} = 12\,in [mathin], the brace length on the gusset. For the L pattern:

[math] A_{nt} = t_{gp} \left[ (n_{c} – 2)\, s_{c} + g_{a} + L_{eh,gp} – (n_{c} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ ((2) – 2) \times (3\,in) + (6\,in) + (2\,in) – ((2) – 0.5) \times ((0.9375\,in) + (0.0625\,in)) \right] = 3.25\,in^{2} [math]

[math] A_{gv} = t_{gp} \left[ L_{ev} + (n_{r} – 1)\, s_{r} \right] = (0.5\,in) \times \left[ (1.5\,in) + ((4) – 1) \times (3\,in) \right] = 5.25\,in^{2} [math]

[math] A_{nv} = t_{gp} \left[ L_{br,gp} – L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ (12\,in) – (1.5\,in) – ((4) – 0.5) \times ((0.9375\,in) + (0.0625\,in)) \right] = 3.5\,in^{2} [math]

[math] \phi R_{n} = \phi \left( 0.6\, F_{u,gp} A_{nv} + U_{bs} F_{u,gp} A_{nt} \right) \le \phi \left( 0.6\, F_{y,gp} A_{gv} + U_{bs} F_{u,gp} A_{nt} \right) [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (3.5\,in^{2}) + (1) \times (65\,ksi) \times (3.25\,in^{2}) \le 0.6 \times (50\,ksi) \times (5.25\,in^{2}) + (1) \times (65\,ksi) \times (3.25\,in^{2}) \right) = 260.81\,kip [math]

For the U pattern:

[math] A_{nt} = t_{gp} \left[ (n_{c} – 2)\, s_{c} + g_{a} – (n_{c} – 1)\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ ((2) – 2) \times (3\,in) + (6\,in) – ((2) – 1) \times ((0.9375\,in) + (0.0625\,in)) \right] = 2.5\,in^{2} [math]

[math] A_{gv} = 2\, t_{gp} \left[ L_{ev} + (n_{r} – 1)\, s_{r} \right] = 2 \times (0.5\,in) \times \left[ (1.5\,in) + ((4) – 1) \times (3\,in) \right] = 10.5\,in^{2} [math]

[math] A_{nv} = 2\, t_{gp} \left[ (n_{r} – 1)\, s_{r} + L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = 2 \times (0.5\,in) \times \left[ ((4) – 1) \times (3\,in) + (1.5\,in) – ((4) – 0.5) \times ((0.9375\,in) + (0.0625\,in)) \right] = 7\,in^{2} [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (7\,in^{2}) + (1) \times (65\,ksi) \times (2.5\,in^{2}) \le 0.6 \times (50\,ksi) \times (10.5\,in^{2}) + (1) \times (65\,ksi) \times (2.5\,in^{2}) \right) = 326.63\,kip [math]

The governing pattern is the lower one:

[math] \phi R_{n} = \min\left( (260.81\,kip),\, (326.63\,kip) \right) = 260.81\,kip [math]

DCR = 52 kip / 260.81 kip = 0.199 < 1.0, in Ordnung

Schritt 6: Blockscherung der Stütze (AISC 360-16 J4.3)

Each brace angle can tear out its own block: shear along its bolt line and tension across to the toe of the leg. Each angle has one bolt line, which is why the equation uses half the bolt columns, [mathin] n_{c}/2 = 1 [mathin], and doubles the thickness to cover both angles.

Mit [mathin] d_{h} = 0.8125\,in [mathin] und [mathin] L_{eh,br} = 2\,in [mathin]:

[math] A_{nt} = 2 t_{br} \left[ \left( \frac{n_{c}}{2} – 1 \right) s_{c} + L_{eh,br} – \left( \frac{n_{c}}{2} – 0.5 \right)\left( d_{h} + 0.0625\,in \right) \right] = (1\,in) \times \left[ ((1) – 1) \times (3\,in) + (2\,in) – ((1) – 0.5) \times ((0.8125\,in) + (0.0625\,in)) \right] = 1.5625\,in^{2} [math]

[math] A_{gv} = 2 t_{br} \left[ L_{ev} + (n_{r} – 1)\, s_{r} \right] = (1\,in) \times \left[ (1.5\,in) + ((4) – 1) \times (3\,in) \right] = 10.5\,in^{2} [math]

[math] A_{nv} = 2 t_{br} \left[ L_{br,gp} – L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (1\,in) \times \left[ (12\,in) – (1.5\,in) – ((4) – 0.5) \times ((0.8125\,in) + (0.0625\,in)) \right] = 7.4375\,in^{2} [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (58\,ksi) \times (7.4375\,in^{2}) + (1) \times (58\,ksi) \times (1.5625\,in^{2}) \le 0.6 \times (36\,ksi) \times (10.5\,in^{2}) + (1) \times (58\,ksi) \times (1.5625\,in^{2}) \right) = 238.07\,kip [math]

DCR = 52 kip / 238.07 kip = 0.218 < 1.0, in Ordnung

Schritt 7: Gusset tension on the Whitmore section (AISC 360-16 J4.1, AISC Manual Fig. 9-1)

The brace force spreads out from the bolts into the gusset at about 30° on each side. The Whitmore section is the width that this spread reaches at the last bolt row, and the gusset must yield and rupture on that width before anything else.

The bolt group length is [mathin] L_{br} = (n_{r} – 1)\, s_{r} = 9\,in [mathin] and the width between the outer bolt lines is [mathin] W_{br} = 6\,in [mathin]:

[math] W = 2\, L_{br} \tan(\theta) + W_{br} = 2 \times (9\,in) \times \tan(30) + (6\,in) = 16.392\,in [math]

Spannung lässt nach, mit [mathin] \phi = 0.9 [mathin]:

[math] \phi R_{n,ty} = \phi\, F_{y,gp}\, t_{gp}\, W = (0.9) \times (50\,ksi) \times (0.5\,in) \times (16.392\,in) = 368.83\,kip [math]

Tension rupture through the two holes in the last row, mit [mathin] \phi = 0.75 [mathin]:

[math] \phi R_{n,tr} = \phi\, F_{u,gp}\, t_{gp} \left[ W – n_{c}\left( d_{h} + 0.0625\,in \right) \right] = (0.75) \times (65\,ksi) \times (0.5\,in) \times \left[ (16.392\,in) – (2) \times ((0.9375\,in) + (0.0625\,in)) \right] = 350.81\,kip [math]

[math] \phi R_{n} = \min\left( (368.83\,kip),\, (350.81\,kip) \right) = 350.81\,kip [math]

DCR = 52 kip / 350.81 kip = 0.148 < 1.0, in Ordnung

Schritt 8: Brace tension rupture with shear lag (AISC 360-16 D3, J4.1)

Only one leg of each brace angle is bolted, so the stress has to flow from the outstanding leg into the connected leg. Shear lag reduces the effective net area by the factor U.

Mit [mathin] \bar{y} = 1.65\,in [mathin], the brace centroid distance, and the connection length [mathin] (n_{r} – 1)\, s_{r} [mathin] (Tabelle D3.1 Fall 2):

[math] U = 1 – \frac{\bar{y}}{(n_{r} – 1)\, s_{r}} = 1 – \frac{(1.65\,in)}{((4) – 1) \times (3\,in)} = 0.81674 [math]

[math] \phi R_{n,tr} = \phi\, F_{u,br}\, U \left[ A_{br} – n_{c}\left( d_{h} + 0.0625\,in \right) t_{br} \right] = (0.75) \times (58\,ksi) \times (0.81674) \times \left[ (8\,in^{2}) – (2) \times ((0.8125\,in) + (0.0625\,in)) \times (0.5\,in) \right] = 253.14\,kip [math]

DCR = 52 kip / 253.14 kip = 0.205 < 1.0, in Ordnung

On the brace side, slip governs at 0.806 and every strength check is under 0.22.

Schritt 9: Detailing limits at the gusset side of the girder angle (AISC 360-16 J3.3, J3.4, J3.5)

The report resolves the brace force into a component along the girder and a component along the beam. The gusset leg at the girder carries the component along the girder, which loads the single angle in shear along its length:

[math] V = P_{u,br} \sin(\theta_{br}) = (52\,kip) \times \sin((45)) = 36.77\,kip [math]

Horizontal brace connection section B-B at the girder: L4x3x3/8 single angle under the gusset with three 3/4 in A325N-Schrauben bei 3 im, 1 1/2 in end distance and a 1 3/4 in gage on the angle

Section B-B at the girder. The angle’s 4 in leg is bolted to the gusset, and its 3 in leg is bolted to the girder web on a 1 3/4 im Messgerät.

Detaillierungslimit Limit (im) Tatsächlich (im) DCR Ergebnis
Mindestabstand der Schraubenreihen 2.000 3.000 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Maximaler Schraubenreihenabstand 6.000 3.000 0.500 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Single angle minimum vertical edge distance 1.000 1.500 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Single angle minimum horizontal edge distance (HSSL) 1.125 1.500 0.750 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset minimum vertical edge distance 1.000 2.500 0.400 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset minimum horizontal edge distance 1.000 1.500 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Minimum single angle length 5.500 9.000 0.611 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Minimum bolt gage for the single angle 1.500 2.500 0.600 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des

The horizontal edge distance on the angle gets the Table J3.5 increment of 1/8 in for a short slot, was gibt 1.125 im. The minimum angle length of 5.5 in is half the gusset length along the girder, [mathin] h_{1}/2 [mathin].

[math] DCR = \frac{d}{c} = \frac{(1.125)}{(1.5)} = 0.75 [math]

DCR = 0.750 < 1.0, in Ordnung

Schritt 10: Gusset-side bolt group of the girder angle in shear (AISC 360-16 J3.6, AISC Manual p. 10-116)

The three bolts through the gusset leg of the angle carry V in single shear. For a single vertical row of bolts with an eccentricity of 3 in or less, the Manual lets you neglect the eccentricity, so the group coefficient is the bolt count, [mathin] C = 3 [mathin].

Wo [mathin] F_{nv} = 54\,ksi [mathin] for an A325N bolt, [mathin] d_{b} = 0.75\,in [mathin], [mathin] N_{s} = 1 [mathin], [mathin] h_{f} = 1 [mathin] und [mathin] \phi = 0.75 [mathin]:

[math] \phi R_{n} = \phi\, F_{nv}\, \frac{\pi}{4} d_{b}^{2}\, N_{s}\, C\, h_{f} = (0.75) \times (54\,ksi) \times \frac{\pi}{4} \times ((0.75\,in))^{2} \times (1) \times (3) \times (1) = 53.677\,kip [math]

DCR = 36.77 kip / 53.677 kip = 0.685 < 1.0, in Ordnung

Schritt 11: Bolt bearing on the girder angle, gusset side (AISC 360-16 J3.10)

Each bolt bears on its hole in the angle. The angle hole is a horizontal short slot, but the load runs along the angle, across the slot, so the hole dimension in the direction of the load is the slot width, [mathin] d_{h} = 0.8125\,in [mathin].

[math] l_{c1} = (1.5\,in) – \frac{(0.8125\,in)}{2} = 1.0938\,in \qquad l_{c2} = (3\,in) – (0.8125\,in) = 2.1875\,in [math]

Mit [mathin] t_{L,gir} = 0.375\,in [mathin], [mathin] F_{u,L,gir} = 58\,ksi [mathin] and the group scaled by [mathin] C/n_{r} [mathin]:

[math] \phi R_{n} = \phi \left[ \min\left(1.2\, l_{c1},\, 2.4\, d_{b}\right) t_{L,gir} F_{u,L,gir} + \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{L,gir} F_{u,L,gir} \left( n_{r} – 1 \right) \right] \left( \frac{C}{n_{r}} \right) [math]

[math] \phi R_{n} = (0.75) \times \left[ \min\left(1.2 \times (1.0938\,in),\, 2.4 \times (0.75\,in)\right) \times (0.375\,in) \times (58\,ksi) + \min\left(1.2 \times (2.1875\,in),\, 2.4 \times (0.75\,in)\right) \times (0.375\,in) \times (58\,ksi) \times ((3) – 1) \right] \times \left( \frac{(3)}{(3)} \right) = 80.135\,kip [math]

DCR = 36.77 kip / 80.135 kip = 0.459 < 1.0, in Ordnung

Schritt 12: Bolt bearing on the gusset at the girder angle (AISC 360-16 J3.10)

The same bolts bear on the gusset, das Standardlöcher hat. The end bolt has 2.5 in of gusset in front of it, so its clear distance is much longer than on the angle.

[math] l_{c1} = L_{ev,gp} – \frac{d_{h}}{2} = (2.5\,in) – \frac{(0.8125\,in)}{2} = 2.0937\,in \qquad l_{c2} = (3\,in) – (0.8125\,in) = 2.1875\,in [math]

[math] \phi R_{n} = (0.75) \times \left[ \min\left(1.2 \times (2.0937\,in),\, 2.4 \times (0.75\,in)\right) \times (0.5\,in) \times (65\,ksi) + \min\left(1.2 \times (2.1875\,in),\, 2.4 \times (0.75\,in)\right) \times (0.5\,in) \times (65\,ksi) \times ((3) – 1) \right] \times \left( \frac{(3)}{(3)} \right) = 131.63\,kip [math]

DCR = 36.77 kip / 131.63 kip = 0.279 < 1.0, in Ordnung

Every bolt reaches the bearing cap of 2.4 db on the gusset, so tear-out does not control here.

Schritt 13: Effective strength of the gusset-side bolts (AISC 360-16 J3.6 Kommentar)

Scheren, bearing and tear-out are not separate checks for each bolt. Each bolt delivers the least of its shear strength and its bearing strength in each ply, und die Gruppenstärke ist die Summe dieser Werte pro Bolzen.

[math] \phi r_{v} = \phi\, F_{nv}\, \frac{\pi}{4} d_{b}^{2}\, N_{s}\, h_{f} = (0.75) \times (54\,ksi) \times \frac{\pi}{4} \times ((0.75\,in))^{2} \times (1) \times (1) = 17.892\,kip [math]

On the angle, the edge bolt gives [mathin] \phi r_{n1e} = (0.75) \times \min(1.2 \times 1.0938,\, 2.4 \times 0.75) \times 0.375 \times 58 = 21.41\,kip [mathin] and an inner bolt gives [mathin] \phi r_{n1i} = 29.363\,kip [mathin]. Am Zwickel, both edge and inner bolts give [mathin] \phi r_{n2} = 43.875\,kip [mathin].

Bolzen Bolzenscherung (kip) Bearing on the angle (kip) Bearing on the gusset (kip) Effektive Stärke (kip)
1 17.89 29.36 43.88 17.89
2 17.89 29.36 43.88 17.89
3 17.89 21.41 43.88 17.89

[math] \phi R_{n,eff} = \left( \frac{C}{n_{r}} \right) \sum \phi r_{eff} = \left( \frac{(3)}{(3)} \right) \times \left[ (1) \times (17.892\,kip) + (1) \times (17.892\,kip) + (1) \times (17.892\,kip) \right] = 53.677\,kip [math]

DCR = 36.77 kip / 53.677 kip = 0.685 < 1.0, in Ordnung

Die Bolzenscherkraft bestimmt jede Schraube, so the effective strength equals the bolt shear strength from Step 10.

Schritt 14: Block shear of the girder angle, gusset side (AISC 360-16 J4.3)

The gusset leg of the angle can tear out an L-shaped block: shear along the bolt line and tension across to the edge of the leg. Across the slot, the hole dimension is the slot length, [mathin] d_{h} = 1\,in [mathin].

[math] A_{nt} = t_{L,gir} \left[ (n_{c} – 1)\, s_{c} + L_{eh} – (n_{c} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.375\,in) \times \left[ ((1) – 1) \times (0\,in) + (1.5\,in) – ((1) – 0.5) \times ((1\,in) + (0.0625\,in)) \right] = 0.36328\,in^{2} [math]

[math] A_{gv} = t_{L,gir} \left[ L_{ev} + (n_{r} – 1)\, s_{r} \right] = (0.375\,in) \times \left[ (1.5\,in) + ((3) – 1) \times (3\,in) \right] = 2.8125\,in^{2} [math]

[math] A_{nv} = t_{L,gir} \left[ L_{L,gir} – L_{ev} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.375\,in) \times \left[ (9\,in) – (1.5\,in) – ((3) – 0.5) \times ((0.8125\,in) + (0.0625\,in)) \right] = 1.9922\,in^{2} [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (58\,ksi) \times (1.9922\,in^{2}) + (1) \times (58\,ksi) \times (0.36328\,in^{2}) \le 0.6 \times (36\,ksi) \times (2.8125\,in^{2}) + (1) \times (58\,ksi) \times (0.36328\,in^{2}) \right) = 61.365\,kip [math]

DCR = 36.77 kip / 61.365 kip = 0.599 < 1.0, in Ordnung

Schritt 15: Block shear of the gusset at the girder angle (AISC 360-16 J4.3)

The gusset can tear out the same kind of block around its three bolts. Its end distance is 2.5 im, and the shear plane runs to the end of the 11 in gusset leg.

[math] A_{nt} = t_{gp} \left[ (n_{c} – 1)\, s_{c} + L_{eh,gp} – (n_{c} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ ((1) – 1) \times (0\,in) + (1.5\,in) – ((1) – 0.5) \times ((0.8125\,in) + (0.0625\,in)) \right] = 0.53125\,in^{2} [math]

[math] A_{gv} = t_{gp} \left[ L_{ev,gp} + (n_{r} – 1)\, s_{r} \right] = (0.5\,in) \times \left[ (2.5\,in) + ((3) – 1) \times (3\,in) \right] = 4.25\,in^{2} [math]

[math] A_{nv} = t_{gp} \left[ h_{1} – L_{ev,gp} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ (11\,in) – (2.5\,in) – ((3) – 0.5) \times ((0.8125\,in) + (0.0625\,in)) \right] = 3.1563\,in^{2} [math]

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (3.1563\,in^{2}) + (1) \times (65\,ksi) \times (0.53125\,in^{2}) \le 0.6 \times (50\,ksi) \times (4.25\,in^{2}) + (1) \times (65\,ksi) \times (0.53125\,in^{2}) \right) = 118.22\,kip [math]

DCR = 36.77 kip / 118.22 kip = 0.311 < 1.0, in Ordnung

Schritt 16: Girder angle in shear (AISC 360-16 J4.2)

The angle leg has to carry V in shear across its full 9 in der Länge (nachgiebig) and across the net section through the holes (Bruch).

[math] \phi R_{n,sy} = \phi\, 0.6\, F_{y,L,gir}\, A_{gv} = (1) \times 0.6 \times (36\,ksi) \times \left( (9\,in) \times (0.375\,in) \right) = 72.9\,kip [math]

[math] A_{nv} = t_{L,gir} \left[ L_{L,gir} – n_{r}\left( d_{h} + 0.0625\,in \right) \right] = (0.375\,in) \times \left[ (9\,in) – (3) \times ((0.8125\,in) + (0.0625\,in)) \right] = 2.3906\,in^{2} [math]

[math] \phi R_{n,sr} = \phi\, 0.6\, F_{u,L,gir}\, A_{nv} = (0.75) \times 0.6 \times (58\,ksi) \times (2.3906\,in^{2}) = 62.395\,kip [math]

[math] \phi R_{n} = \min\left( (72.9\,kip),\, (62.395\,kip) \right) = 62.395\,kip [math]

DCR = 36.77 kip / 62.395 kip = 0.589 < 1.0, in Ordnung

Schritt 17: Gusset in shear along the girder angle (AISC 360-16 J4.2)

The gusset leg carries the same force in shear along its 11 in der Länge.

[math] \phi R_{n,sy} = \phi\, 0.6\, F_{y,gp}\, h_{1}\, t_{gp} = (1) \times 0.6 \times (50\,ksi) \times \left( (11\,in) \times (0.5\,in) \right) = 165\,kip [math]

[math] A_{nv} = t_{gp} \left[ h_{1} – n_{r}\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ (11\,in) – (3) \times ((0.8125\,in) + (0.0625\,in)) \right] = 4.1875\,in^{2} [math]

[math] \phi R_{n,sr} = (0.75) \times 0.6 \times (65\,ksi) \times (4.1875\,in^{2}) = 122.48\,kip [math]

DCR = 36.77 kip / 122.48 kip = 0.300 < 1.0, in Ordnung

Schritt 18: Girder angle in flexure, gusset side (AISC 360-16 F11.2, AISC-Handbuch Teil 9)

The force enters the angle at the gusset bolt line and leaves at the heel, 2.5 in away, so the leg is a short, deep cantilever in bending. Ein tiefes, thin leg can buckle laterally before it yields. The report checks it with the Manual’s double-coped beam procedure, which treats the leg like a beam web coped top and bottom.

Wo [mathin] L_{b} = 2.5\,in [mathin], the gage on the gusset leg, [mathin] d = L_{L,gir} = 9\,in [mathin] und [mathin] t = 0.375\,in [mathin]:

[math] \frac{L_{b} d}{t^{2}} = \frac{(2.5\,in) \times (9\,in)}{((0.375\,in))^{2}} = 160, \qquad \frac{0.08 E}{F_{y}} = 64.444 \lt 160 \le \frac{1.9 E}{F_{y}} = 1530.6 [math]

[math] Z = \frac{t\, d^{2}}{4} = \frac{(0.375\,in) \times ((9\,in))^{2}}{4} = 7.5938\,in^{3} \qquad S = \frac{t\, d^{2}}{6} = 5.0625\,in^{3} [math]

[math] C_{b} = \left[ 3 + \ln\left( \frac{L_{b}}{d} \right) \right] \left( 1 – \frac{d_{ct}}{d} \right) \ge 1.84 = \left[ 3 + \ln\left( \frac{(2.5\,in)}{(9\,in)} \right) \right] \times \left( 1 – \frac{(0\,in)}{(9\,in)} \right) \ge 1.84 = 1.84 [math]

[math] \phi M_{n} = \phi \left[ C_{b} \left[ 1.52 – 0.274 \left( \frac{L_{b} d}{t^{2}} \right) \left( \frac{F_{y}}{E} \right) \right] F_{y} S \le F_{y} Z \right] [math]

[math] \phi M_{n} = (0.9) \times \left[ (1.84) \times \left[ 1.52 – 0.274 \times (160) \times \left( \frac{(36\,ksi)}{(29000\,ksi)} \right) \right] \times (36\,ksi) \times (5.0625\,in^{3}) \le (36\,ksi) \times (7.5938\,in^{3}) \right] = 20.503\,kip{\cdot}ft [math]

[math] \phi V_{n,y} = \frac{\phi M_{n}}{L_{b}} = \frac{(20.503\,kip{\cdot}ft)}{(2.5\,in)} = 98.415\,kip [math]

Flexural rupture on the net section through the holes (Manual Part 15 Tabelle 15-3, Teil 9 Gl. 9-4):

[math] Z_{net} = \frac{t\, d^{2}}{4} – t\left( d_{h} + 0.0625\,in \right) s_{r} \left\lfloor \frac{n_{r}^{2}}{4} \right\rfloor – \left[ n_{r}\ \text{odd} \right] \frac{t\left( d_{h} + 0.0625\,in \right)^{2}}{4} = 5.5532\,in^{3} [math]

[math] \phi M_{n} = \phi\, F_{u}\, Z_{net} = (0.75) \times (58\,ksi) \times (5.5532\,in^{3}) = 20.13\,kip{\cdot}ft \qquad \phi V_{n,r} = \frac{(20.13\,kip{\cdot}ft)}{(2.5\,in)} = 96.626\,kip [math]

[math] \phi V_{n} = \min\left( (98.415\,kip),\, (96.626\,kip) \right) = 96.626\,kip [math]

DCR = 36.77 kip / 96.626 kip = 0.381 < 1.0, in Ordnung

The leg is stocky enough that the plastic moment caps the buckling equation, so yielding and rupture end up close together.

Schritt 19: Shear and moment interaction of the girder angle, gusset side (AISC-Handbuch Gl. 10-5)

The angle section carries shear and moment at the same time, so the two ratios combine in a circular interaction.

[math] M_{r} = V_{r}\, L_{b} = (36.77\,kip) \times (2.5\,in) = 7.6603\,kip{\cdot}ft [math]

[math] I_{nt} = \left( \frac{V_{r}}{\phi V_{n}} \right)^{2} + \left( \frac{M_{r}}{\phi M_{n}} \right)^{2} = \left( \frac{(36.77\,kip)}{(72.9\,kip)} \right)^{2} + \left( \frac{(7.6603\,kip{\cdot}ft)}{(20.503\,kip{\cdot}ft)} \right)^{2} = 0.394 [math]

DCR = 0.394 / 1.0 = 0.394 < 1.0, in Ordnung

Schritt 20: Detailing limits at the girder (AISC 360-16 J3.3, J3.4)

The angle’s 3 in leg is bolted to the girder web through standard holes in both plies. The same spacing and edge rules apply, plus a minimum gage on the leg so the bolts can be installed.

Detaillierungslimit Limit (im) Tatsächlich (im) DCR Ergebnis
Mindestabstand der Schraubenreihen 2.000 3.000 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Maximaler Schraubenreihenabstand 6.000 3.000 0.500 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Single angle minimum vertical edge distance 1.000 1.500 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Single angle minimum horizontal edge distance 1.000 1.500 0.667 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Minimum bolt gage for the single angle 1.500 1.750 0.857 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des

[math] DCR = \frac{d}{c} = \frac{(1.5)}{(1.75)} = 0.85714 [math]

DCR = 0.857 < 1.0, in Ordnung

Schritt 21: Bolt group to the girder by the instantaneous center of rotation (AISC 360-16 J3.6, AISC-Handbuch Teil 7)

The bolts through the girder web sit 1.75 in from the heel of the angle, so V reaches them with an eccentricity of [mathin] e_{x} = 1.75\,in [mathin]. The bolts carry a moment as well as the shear. Mit der Methode des momentanen Rotationszentrums finds the point the group turns about and gives the coefficient C, die Anzahl der Schrauben’ worth of strength the group actually delivers.

Bolzen 1 is at the origin, and bolts 2 und 3 are at y = 3 in und 6 im. The iteration converges with the instantaneous center at [mathin] x_{ic} = -3.0653\,in [mathin], [mathin] y_{ic} = 3\,in [mathin]. Using Manual Eq. 7-1, the bolt reactions are:

Bolzen R. (kip) Rx (kip) Ry (kip) Mn (Hühnchen)
1 17.56 12.28 12.55 75.32
2 17.01 0.00 17.01 52.14
3 17.56 -12.28 12.55 75.32

Das gibt [mathin] C = 2.35 [mathin], gegen 3 for the bolts on the gusset leg:

[math] \phi R_{n} = \phi\, F_{nv}\, \frac{\pi}{4} d_{b}^{2}\, N_{s}\, C\, h_{f} = (0.75) \times (54\,ksi) \times \frac{\pi}{4} \times ((0.75\,in))^{2} \times (1) \times (2.35) \times (1) = 42.047\,kip [math]

DCR = 36.77 kip / 42.047 kip = 0.874 < 1.0, in Ordnung

Mit der Schraubenrechner runs this same check for any eccentric bolt group on its own.

Schritt 22: Bolt bearing on the girder angle at the girder (AISC 360-16 J3.10)

The bolts to the girder bear on the angle’s 3 in leg. Its holes are standard, so the clear distances match Step 11, and the group is scaled by the new C:

[math] \phi R_{n} = (0.75) \times \left[ \min\left(1.2 \times (1.0938\,in),\, 2.4 \times (0.75\,in)\right) \times (0.375\,in) \times (58\,ksi) + \min\left(1.2 \times (2.1875\,in),\, 2.4 \times (0.75\,in)\right) \times (0.375\,in) \times (58\,ksi) \times ((3) – 1) \right] \times \left( \frac{(2.35)}{(3)} \right) = 62.773\,kip [math]

DCR = 36.77 kip / 62.773 kip = 0.586 < 1.0, in Ordnung

Schritt 23: Bolzenlager am Trägersteg (AISC 360-16 J3.10)

The girder web has no edge near the bolts, so every bolt is an inner bolt, and the check uses [mathin] l_{c2} = 2.1875\,in [mathin] for all of them.

[math] \phi R_{n} = \phi\, \min\left(1.2\, l_{c2},\, 2.4\, d_{b}\right) t_{w,g}\, F_{u,g}\, C = (0.75) \times \min\left(1.2 \times (2.1875\,in),\, 2.4 \times (0.75\,in)\right) \times (0.35\,in) \times (65\,ksi) \times (2.35) = 72.174\,kip [math]

DCR = 36.77 kip / 72.174 kip = 0.509 < 1.0, in Ordnung

Schritt 24: Effective strength of the bolts to the girder (AISC 360-16 J3.6 Kommentar)

As in Step 13, each bolt delivers the least of its shear and its bearing in each ply. On the girder web each bolt gives [mathin] \phi r_{n2} = (0.75) \times \min(1.2 \times 2.1875,\, 2.4 \times 0.75) \times 0.35 \times 65 = 30.713\,kip [mathin].

Bolzen Bolzenscherung (kip) Bearing on the angle (kip) Bearing on the girder web (kip) Effektive Stärke (kip)
1 17.89 29.36 30.71 17.89
2 17.89 29.36 30.71 17.89
3 17.89 21.41 30.71 17.89

[math] \phi R_{n,eff} = \left( \frac{C}{n_{r}} \right) \sum \phi r_{eff} = \left( \frac{(2.35)}{(3)} \right) \times (53.677\,kip) = 42.047\,kip [math]

DCR = 36.77 kip / 42.047 kip = 0.874 < 1.0, in Ordnung

Schritt 25: Block shear of the girder angle, girder side (AISC 360-16 J4.3)

The girder leg of the angle can tear out a block the same way as the gusset leg in Step 14. Its holes are standard, so the tension plane uses [mathin] d_{h} = 0.8125\,in [mathin]:

[math] A_{nt} = (0.375\,in) \times \left[ ((1) – 1) \times (0\,in) + (1.5\,in) – ((1) – 0.5) \times ((0.8125\,in) + (0.0625\,in)) \right] = 0.39844\,in^{2} [math]

The shear areas are the same as Step 14, [mathin] A_{gv} = 2.8125\,in^{2} [mathin] und [mathin] A_{nv} = 1.9922\,in^{2} [mathin]:

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (58\,ksi) \times (1.9922\,in^{2}) + (1) \times (58\,ksi) \times (0.39844\,in^{2}) \le 0.6 \times (36\,ksi) \times (2.8125\,in^{2}) + (1) \times (58\,ksi) \times (0.39844\,in^{2}) \right) = 62.895\,kip [math]

DCR = 36.77 kip / 62.895 kip = 0.585 < 1.0, in Ordnung

Schritt 26: Girder angle in shear, girder side (AISC 360-16 J4.2)

The girder leg is the same 9 in von 3/8 in section with the same three standard holes, so the numbers repeat Step 16: nachgiebig 72.9 kip, Bruch 62.395 kip.

[math] \phi R_{n} = \min\left( (72.9\,kip),\, (62.395\,kip) \right) = 62.395\,kip [math]

DCR = 36.77 kip / 62.395 kip = 0.589 < 1.0, in Ordnung

Schritt 27: Girder angle in flexure, girder side (AISC 360-16 F11.2, AISC-Handbuch Teil 9)

On the girder leg the lever arm is the 1.75 im Messgerät, Also [mathin] L_{b} = 1.75\,in [mathin] und [mathin] L_{b} d / t^{2} = 112 [mathin]. The plastic moment still caps the buckling equation, Also [mathin] \phi M_{n} = 20.503\,kip{\cdot}ft [mathin] as in Step 18, and the shorter arm raises the equivalent shear:

[math] \phi V_{n,y} = \frac{(20.503\,kip{\cdot}ft)}{(1.75\,in)} = 140.59\,kip \qquad \phi V_{n,r} = \frac{(20.13\,kip{\cdot}ft)}{(1.75\,in)} = 138.04\,kip [math]

[math] \phi V_{n} = \min\left( (140.59\,kip),\, (138.04\,kip) \right) = 138.04\,kip [math]

DCR = 36.77 kip / 138.04 kip = 0.266 < 1.0, in Ordnung

Schritt 28: Shear and moment interaction of the girder angle, girder side (AISC-Handbuch Gl. 10-5)

[math] M_{r} = V_{r}\, L_{b} = (36.77\,kip) \times (1.75\,in) = 5.3622\,kip{\cdot}ft [math]

[math] I_{nt} = \left( \frac{(36.77\,kip)}{(72.9\,kip)} \right)^{2} + \left( \frac{(5.3622\,kip{\cdot}ft)}{(20.503\,kip{\cdot}ft)} \right)^{2} = 0.3228 [math]

DCR = 0.3228 / 1.0 = 0.323 < 1.0, in Ordnung

Schritt 29: Gusset in bending at the girder (AISC 360-16 F11.1)

The gusset is notched around the column, so it wraps around the corner between its two legs. The force V acts along the girder bolt line, but the gusset section that resists it is offset from that line, so the gusset leg along the girder bends in its own plane.

The lever arm is the gusset offset plus its width at the girder, [mathin] o_{1} + b_{1} [mathin]:

[math] M_{T} = V_{r} \left( o_{1} + b_{1} \right) = (36.77\,kip) \times \left( (1\,in) + (6.75\,in) \right) = 23.747\,kip{\cdot}ft [math]

The section is the 11 in gusset leg, at its plastic moment:

[math] \phi M_{n} = \frac{\phi\, F_{y,gp}\, t_{gp}\, h_{1}^{2}}{4} = \frac{(0.9) \times (50\,ksi) \times (0.5\,in) \times ((11\,in))^{2}}{4} = 56.719\,kip{\cdot}ft [math]

DCR = 23.747 kip-ft / 56.719 kip-ft = 0.419 < 1.0, in Ordnung

Schritt 30: Gusset in buckling at the girder (AISC 360-16 F11.2)

The same in-plane moment puts one edge of the gusset in compression. A thin plate with a long unsupported edge can buckle sideways before it reaches its plastic moment, so the gusset is checked as a rectangular bar under lateral-torsional buckling.

The report takes the lever arm and the unbraced length out to the middle of the gusset’s other leg, at the beam, [mathin] o_{1} + b_{1} + h_{2}/2 [mathin]:

[math] M_{C} = V_{r} \left( o_{1} + b_{1} + \frac{h_{2}}{2} \right) = (36.77\,kip) \times \left( (1\,in) + (6.75\,in) + \frac{(11.75\,in)}{2} \right) = 41.749\,kip{\cdot}ft [math]

[math] L_{b} = o_{1} + b_{1} + \frac{h_{2}}{2} = (1\,in) + (6.75\,in) + \frac{(11.75\,in)}{2} = 13.625\,in [math]

Section properties of the 11 in leg:

[math] S_{x} = \frac{t_{gp}\, h_{1}^{2}}{6} = 10.083\,in^{3} \qquad Z_{x} = \frac{t_{gp}\, h_{1}^{2}}{4} = 15.125\,in^{3} [math]

[math] M_{y} = F_{y,gp}\, S_{x} = (50\,ksi) \times (10.083\,in^{3}) = 42.014\,kip{\cdot}ft \qquad M_{p} = F_{y,gp}\, Z_{x} = (50\,ksi) \times (15.125\,in^{3}) = 63.021\,kip{\cdot}ft [math]

The slenderness parameter falls between the two limits, so the inelastic equation applies:

[math] \frac{0.08 E}{F_{y}} = 46.4 \lt \frac{L_{b}\, h_{1}}{t_{gp}^{2}} = \frac{(13.625\,in) \times (11\,in)}{((0.5\,in))^{2}} = 599.5 \le \frac{1.9 E}{F_{y}} = 1102 [math]

The report also prints the elastic stress, [mathin] F_{cr} = 1.9 E C_{b} / (L_{b} h_{1} / t_{gp}^{2}) = 91.91\,ksi [mathin], which applies only above the upper limit. Mit [mathin] C_{b} = 1 [mathin]:

[math] M_{cr} = \min\left[ C_{b} \left[ 1.52 – 0.274 \left( \frac{L_{b}\, h_{1}}{t_{gp}^{2}} \right) \frac{F_{y,gp}}{E} \right] M_{y},\ M_{p} \right] [math]

[math] M_{cr} = \min\left[ (1) \times \left[ 1.52 – \frac{0.274 \times \left( \frac{(13.625\,in) \times (11\,in)}{((0.5\,in))^{2}} \right) \times (50\,ksi)}{(29000\,ksi)} \right] \times (42.014\,kip{\cdot}ft),\ (63.021\,kip{\cdot}ft) \right] = 51.962\,kip{\cdot}ft [math]

[math] \phi M_{cr} = (0.9) \times (51.962\,kip{\cdot}ft) = 46.766\,kip{\cdot}ft [math]

DCR = 41.749 kip-ft / 46.766 kip-ft = 0.893 < 1.0, in Ordnung

This is the highest ratio in the connection. Mit der 1/2 in gusset has a long free edge, so buckling sets its strength at 51.962 kip-ft, well below the plastic moment of 63.021 kip-ft.

Schritt 31: Bolt and angle checks at the beam (repeat of Steps 9 zu 28)

The gusset leg along the beam carries the other component of the brace force, which at 45° has the same size:

[math] V = P_{u,br} \cos(\theta_{br}) = (52\,kip) \times \cos((45)) = 36.77\,kip [math]

Horizontal brace connection section A-A at the beam: L4x3x3/8 single angle under the gusset with three 3/4 in A325N-Schrauben bei 3 im, 1 1/2 in end distance and a 1 3/4 im Messgerät, standard holes in the angle

Section A-A at the beam. Der Winkel, bolts and gage are the same as at the girder.

Der Winkel, Schrauben, holes and gages at the beam are the same as at the girder, so every check that depends only on them gives the same result:

Check at the beam Same as Die SkyCiv Foundation umfasst das Design von isolierten Fundamenten, die den australischen Standards¹ entsprechen DCR
Detaillierung, gusset side (angle horizontal edge governs) Schritt 9 1.5 im 0.750
Bolzenscherung, gusset side Schritt 10 53.677 kip 0.685
Bearing on the angle, gusset side Schritt 11 80.135 kip 0.459
Effektive Stärke, gusset side Schritt 13 53.677 kip 0.685
Angle block shear, gusset side Schritt 14 61.365 kip 0.599
Angle shear, gusset side Schritt 16 62.395 kip 0.589
Angle flexure, gusset side Schritt 18 96.626 kip 0.381
Interaction, gusset side Schritt 19 1.0 0.394
Detailing at the beam Schritt 20 1.75 im 0.857
Bolt group to the beam (ICOR, C = 2.35) Schritt 21 42.047 kip 0.874
Bearing on the angle at the beam Schritt 22 62.773 kip 0.586
Effective strength to the beam Schritt 24 42.047 kip 0.874
Angle block shear, Balkenseite Schritt 25 62.895 kip 0.585
Angle shear, Balkenseite Schritt 26 62.395 kip 0.589
Angle flexure, Balkenseite Schritt 27 138.04 kip 0.266
Interaction, Balkenseite Schritt 28 1.0 0.323

In the gusset-side detailing, two rows change: the gusset end distance is 2.875 im (DCR 0.348), and the minimum angle length becomes [mathin] h_{2}/2 = 5.875\,in [mathin] (DCR 0.653). Neither governs. The checks that involve the gusset dimensions or the beam web follow.

Schritt 32: Bolt bearing and block shear of the gusset at the beam angle (AISC 360-16 J3.10, J4.3)

The gusset end distance at the beam is 2.875 im, so the end bolt has more material in front of it than at the girder.

[math] l_{c1} = (2.875\,in) – \frac{(0.8125\,in)}{2} = 2.4687\,in [math]

All three bolts still reach the 2.4 db bearing cap, so the bearing strength is unchanged at 131.63 kip (DCR 0.279). The block shear areas change with the end distance and the 11.75 in leg length:

[math] A_{gv} = (0.5\,in) \times \left[ (2.875\,in) + ((3) – 1) \times (3\,in) \right] = 4.4375\,in^{2} [math]

[math] A_{nv} = t_{gp} \left[ h_{2} – L_{ev,gp} – (n_{r} – 0.5)\left( d_{h} + 0.0625\,in \right) \right] = (0.5\,in) \times \left[ (11.75\,in) – (2.875\,in) – ((3) – 0.5) \times ((0.8125\,in) + (0.0625\,in)) \right] = 3.3438\,in^{2} [math]

Mit [mathin] A_{nt} = 0.53125\,in^{2} [mathin] as at the girder:

[math] \phi R_{n} = (0.75) \times \left( 0.6 \times (65\,ksi) \times (3.3438\,in^{2}) + (1) \times (65\,ksi) \times (0.53125\,in^{2}) \le 0.6 \times (50\,ksi) \times (4.4375\,in^{2}) + (1) \times (65\,ksi) \times (0.53125\,in^{2}) \right) = 123.7\,kip [math]

DCR = 36.77 kip / 123.7 kip = 0.297 < 1.0, in Ordnung

Schritt 33: Gusset in shear along the beam angle (AISC 360-16 J4.2)

The gusset leg along the beam is 11.75 in long, so its shear areas grow with it.

[math] \phi R_{n,sy} = (1) \times 0.6 \times (50\,ksi) \times \left( (11.75\,in) \times (0.5\,in) \right) = 176.25\,kip [math]

[math] A_{nv} = (0.5\,in) \times \left[ (11.75\,in) – (3) \times ((0.8125\,in) + (0.0625\,in)) \right] = 4.5625\,in^{2} \qquad \phi R_{n,sr} = (0.75) \times 0.6 \times (65\,ksi) \times (4.5625\,in^{2}) = 133.45\,kip [math]

DCR = 36.77 kip / 133.45 kip = 0.276 < 1.0, in Ordnung

Schritt 34: Bolt bearing on the beam web (AISC 360-16 J3.10)

The beam web is slightly thicker than the girder web, 0.355 im gegen 0.35 im. As in Step 23, every bolt is an inner bolt:

[math] \phi R_{n} = (0.75) \times \min\left(1.2 \times (2.1875\,in),\, 2.4 \times (0.75\,in)\right) \times (0.355\,in) \times (65\,ksi) \times (2.35) = 73.205\,kip [math]

DCR = 36.77 kip / 73.205 kip = 0.502 < 1.0, in Ordnung

Per bolt, the beam web gives 31.151 kip. That is still more than the 17.892 kip bolt shear, so the effective strength of the bolts to the beam stays at 42.047 kip (DCR 0.874).

Schritt 35: Gusset in bending at the beam (AISC 360-16 F11.1)

This is the same check as Step 29, using the gusset width and leg length at the beam.

[math] M_{T} = V_{r} \left( o_{2} + b_{2} \right) = (36.77\,kip) \times \left( (1\,in) + (6.5\,in) \right) = 22.981\,kip{\cdot}ft [math]

[math] \phi M_{n} = \frac{\phi\, F_{y,gp}\, t_{gp}\, h_{2}^{2}}{4} = \frac{(0.9) \times (50\,ksi) \times (0.5\,in) \times ((11.75\,in))^{2}}{4} = 64.717\,kip{\cdot}ft [math]

DCR = 22.981 kip-ft / 64.717 kip-ft = 0.355 < 1.0, in Ordnung

Schritt 36: Gusset in buckling at the beam (AISC 360-16 F11.2)

This is the same check as Step 30. The lever arm now runs out to the middle of the girder leg, [mathin] o_{2} + b_{2} + h_{1}/2 [mathin], and the section is the 11.75 in beam leg.

[math] M_{C} = V_{r} \left( o_{2} + b_{2} + \frac{h_{1}}{2} \right) = (36.77\,kip) \times \left( (1\,in) + (6.5\,in) + \frac{(11\,in)}{2} \right) = 39.834\,kip{\cdot}ft \qquad L_{b} = 13\,in [math]

[math] S_{x} = 11.505\,in^{3},\ Z_{x} = 17.258\,in^{3},\ M_{y} = 47.938\,kip{\cdot}ft,\ M_{p} = 71.908\,kip{\cdot}ft [math]

[math] \frac{L_{b}\, h_{2}}{t_{gp}^{2}} = \frac{(13\,in) \times (11.75\,in)}{((0.5\,in))^{2}} = 611 [math]

[math] M_{cr} = \min\left[ (1) \times \left[ 1.52 – \frac{0.274 \times (611) \times (50\,ksi)}{(29000\,ksi)} \right] \times (47.938\,kip{\cdot}ft),\ (71.908\,kip{\cdot}ft) \right] = 59.029\,kip{\cdot}ft [math]

[math] \phi M_{cr} = (0.9) \times (59.029\,kip{\cdot}ft) = 53.126\,kip{\cdot}ft [math]

DCR = 39.834 kip-ft / 53.126 kip-ft = 0.750 < 1.0, in Ordnung

The beam leg is longer and deeper than the girder leg, so it buckles at a higher moment, and its ratio is lower than the 0.893 at the girder.

Zusammenfassung der Schecks

Design-Check Nachfrage Die SkyCiv Foundation umfasst das Design von isolierten Fundamenten, die den australischen Standards¹ entsprechen DCR Ergebnis
Brace bolts: Detaillierung 1.063 im 1.500 im 0.709 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Brace bolts: slip 52 kip 64.546 kip 0.806 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset bearing at the brace 52 kip 323.58 kip 0.161 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Brace bearing 52 kip 291.99 kip 0.178 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset block shear at the brace 52 kip 260.81 kip 0.199 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Brace block shear 52 kip 238.07 kip 0.218 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset tension (Whitmore) 52 kip 350.81 kip 0.148 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Spannungsriss der Zahnspange 52 kip 253.14 kip 0.205 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: Detaillierung, gusset side 1.125 im 1.500 im 0.750 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: Schraubenscherung, gusset side 36.77 kip 53.677 kip 0.685 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: bearing on the angle, gusset side 36.77 kip 80.135 kip 0.459 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: bearing on the gusset 36.77 kip 131.63 kip 0.279 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: effective strength, gusset side 36.77 kip 53.677 kip 0.685 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: angle block shear, gusset side 36.77 kip 61.365 kip 0.599 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: gusset block shear 36.77 kip 118.22 kip 0.311 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: angle shear, gusset side 36.77 kip 62.395 kip 0.589 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: gusset shear 36.77 kip 122.48 kip 0.300 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: angle flexure, gusset side 36.77 kip 96.626 kip 0.381 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: interaction, gusset side 0.394 1.000 0.394 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: detailing at the girder 1.500 im 1.750 im 0.857 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: bolt group to the girder (ICOR) 36.77 kip 42.047 kip 0.874 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: bearing on the angle at the girder 36.77 kip 62.773 kip 0.586 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: bearing on the girder web 36.77 kip 72.174 kip 0.509 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: effective strength to the girder 36.77 kip 42.047 kip 0.874 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: angle block shear, girder side 36.77 kip 62.895 kip 0.585 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: angle shear, girder side 36.77 kip 62.395 kip 0.589 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: angle flexure, girder side 36.77 kip 138.04 kip 0.266 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Girder angle: interaction, girder side 0.323 1.000 0.323 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset bending at the girder 23.747 kip-ft 56.719 kip-ft 0.419 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset buckling at the girder 41.749 kip-ft 46.766 kip-ft 0.893 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Beam angle: checks matching the girder angle 36.77 kip see Step 31 0.874 max Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Beam angle: Detaillierung, gusset side 1.125 im 1.500 im 0.750 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Beam angle: bearing on the gusset 36.77 kip 131.63 kip 0.279 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Beam angle: gusset block shear 36.77 kip 123.7 kip 0.297 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Beam angle: gusset shear 36.77 kip 133.45 kip 0.276 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Beam angle: bearing on the beam web 36.77 kip 73.205 kip 0.502 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset bending at the beam 22.981 kip-ft 64.717 kip-ft 0.355 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des
Gusset buckling at the beam 39.834 kip-ft 53.126 kip-ft 0.750 Die Hälfte der Wandhöhe von der Unterseite der Basis für den Fall des

Every check in this horizontal brace connection design passes. Gusset buckling at the girder governs at 0.893: the girder leg of the gusset is the shorter of the two, so it has the smaller section and the longer lever arm to the middle of the other leg. The eccentric bolt groups to the girder and the beam come next at 0.874, followed by slip of the brace bolts at 0.806.

Was ist zu ändern, wenn eine Prüfung fehlschlägt?

  • Gusset buckling or bending: use a thicker gusset, which raises the section and lowers the slenderness parameter at the same time. Lengthening the leg along the member also helps. Reducing the gusset width, and with it the lever arm, works where the brace geometry allows.
  • Bolt group to the girder or beam: add a bolt row to the angle, oder eine größere Schraube verwenden. A smaller gage on the member leg reduces the eccentricity but has to stay above the minimum gage.
  • Brace bolt slip: use a Class B surface (μ = 0.5 anstatt 0.3), Fügen Sie eine Schraubenreihe hinzu, or use standard holes in the gusset where the erection tolerance allows, which raises φ to 1.00.
  • Angle shear, block shear or flexure: use a longer or thicker angle. A longer angle also adds room for another bolt row.
  • Bearing on a thin member web: add a bolt row so each bolt carries less, or use a larger bolt diameter.
  • Whitmore section or block shear at the brace: lengthen the bolt group to widen the Whitmore section, oder einen dickeren Zwickel verwenden.

Häufig gestellte Fragen

How is the brace force shared between the girder and the beam?

The report resolves the 52 kip brace force into two components at the brace angle of 45 Grad. The component along the girder goes to the girder angle, and the component along the beam goes to the beam angle, 36.77 kip each. Each single angle then carries its share as shear along its own bolt line. There is no Uniform Force Method distribution as there is in a vertical brace connection.

Why do the brace bolts have only one slip plane?

Both brace angles lie flat on the same face of the gusset, side by side with a 6 inch gage between their bolt lines. Each bolt passes through one angle leg and the gusset, so there is a single faying surface per bolt. When the gusset sits between two angles, as in many vertical braces, each bolt clamps two surfaces and the slip strength doubles.

Why are the brace bolts slip critical but the angle bolts are not?

The gusset has oversized holes at the brace to give the erector room to fit up the bay. AISC 360-16 J3.2 erlaubt übergroße Löcher nur in gleitkritischen Verbindungen. The single angles use short slots on the gusset leg, oriented so the load runs across the slot, and J3.2 allows that in a bearing-type joint. Those bolts are A325N, checked for shear and bearing.

Why is the single angle checked like a coped beam?

The force enters the angle at one bolt line and leaves at the other leg, so the leg between them is a short, deep cantilever. A thin, deep plate in bending can buckle laterally. The AISC Manual’s double-coped beam procedure covers a rectangular section like this, so the report uses it, with the bolt gage as the unbraced length and the angle length as the depth.

Why does gusset buckling govern this connection?

The gusset is a half inch plate that wraps around the column, and the force on each leg acts at a long lever arm to the middle of the other leg. That gives a large in-plane moment on a section with a long free edge. Buckling caps the strength below the plastic moment, and the shorter girder leg ends up at a ratio of 0.893.

Why is the bolt group coefficient 3 on the gusset leg but 2.35 on the member leg?

On the gusset leg the bolts are a single row with a small eccentricity, and the AISC Manual lets you neglect an eccentricity of 3 Zoll oder weniger, so the coefficient is the bolt count. On the member leg the report takes the 1.75 inch gage as the eccentricity and runs the instantaneous center of rotation method, was gibt 2.35.

Wie würde sich dies für AISC ASD anstelle von LRFD ändern??

Die Grenzzustände und Nennfestigkeiten sind gleich. With AISC ASD you compare service-level forces against the nominal strength divided by a safety factor. Ein Widerstandsfaktor von 0.75 wird zum Sicherheitsfaktor von 2.00, 0.90 wird 1.67, und Slip mit übergroßen Löchern geht aus 0.85 zu 1.76. The split of the brace force between the girder and the beam is unchanged.

Design a horizontal brace connection for free

Jede Zahl auf dieser Seite stammt aus einer Lösung. Pick the horizontal bracing configuration, enter your members, befestigen, Zwickel, Winkel, bolts and forces, and the free calculator runs each of these checks in your browser without anything to install.

Das SkyCiv Connection Design-Modul ist die Verbindungsdesign-Software hinter diesem Beispiel. Sie erhalten den vollständigen Berechnungsbericht mit jeder Gleichung und Ihren darin enthaltenen Zahlen, wie die Schritte oben, plus jede Kapazität und DCR, für AISC 360-16 (LRFD und ASD) und 4100:2020.

Verweise

  • AISC 360-16, Spezifikation für Baustahlgebäude: B4.3, D3 (Tabelle D3.1 Fall 2), F11.1, F11.2 (Gl. F11-2), J3.2, J3.3, J3.4 (Tabelle J3.4), J3.5 (Tabelle J3.5), J3.6 (Gl. J3-1), J3.8 (Gl. J3-4, Tabelle J3.1), J3.10 (Gl. J3-6a, J3-6c), J4.1 (Gl. J4-1, J4-2), J4.2 (Gl. J4-3, J4-4), J4.3 (Gl. J4-5).
  • AISC-Stahlkonstruktionshandbuch, 15th Ausgabe: Teil 7 (instantaneous center of rotation, Gl. 7-1), Teil 9 (Feige. 9-1 Whitmore-Abschnitt, Gl. 9-4, Gl. 9-15), Teil 10 (p. 10-116 eccentricity of a single row, Gl. 10-5), Teil 15 (Tabelle 15-3).
  • Entwurf von Stahlverbindungen mit AISC 360-16
  • Schrauben im SkyCiv Connection Design
Harold Munalem, Produktmanager für SkyCiv Connection Design

Harold Munalem
Produktmanager, Verbindungsdesign
10+ Jahre in der Konstruktion von Stahlverbindungen
LinkedIn

Wie können wir helfen?

×

Zur Spitze gehen